條件調節期間 的英文怎麼說

中文拼音 [tiáojiàndiàojiéjiān]
條件調節期間 英文
conditioning period
  • : Ⅰ名詞1 (細長的樹枝) twig 2 (條子) slip; strip 3 (分項目的) item; article 4 (層次; 秩序; 條...
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : 節構詞成分。
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 條件 : 1. (客觀的因素) condition; term; factor 2. (提出的要求) requirement; prerequisite; qualification
  • 調節 : regulate; adjust; monitor; measure; take care of; condition; regulation; adjustment; conditioning...
  • 期間 : time; period; course; duration; term
  1. In recent years, the water - saving and control irrigation technique of rice has diverted from plot experimental and demonstration to lare scale. and has got remarkable economic and social benefits. amed at the characteristics of this irrigation area, optimal selection for water - saving techniques of rice, deciding the amout of leaching water and irrigation modles, investigating the adaptability of the water - saving and control irrigation technique in saline land. studying the increase in production mechanism of the technique are important to extend the technique, to better and develop saline land as well as slick spots. according to the results of field experiments, optimization study was conducted on the water - saving irrigation technique of rice in saline land, the effects of different water - saving irrigation techniques on the physiological indexes and yield of rice were systematically analyzed. by using mutiplepurpose fuzzy optimization method, better. water - saving irrigation technique was selector out, that is. the control irrigation technique in rice. the mechanism of it was analyzed from the aspect of the physiological and ecological saving water of rice to provide the implemental process and technical point ; throgh the quantitive analysis and comparision on control irrigation and control class ( flood irrigation ), high production and quality mechanism of the technique was analyzed in terms of physiology indexes of rice, the variation of soil moisture, the pest resistance and the lodge resistance, the change of soil temperature in paddy fields. the yield constitutive factors, the quality of rice and so on. in saline land. control irrigation and intermittent leaching modles were adopted to validate the adaptability of the technique in irrigation of rice in saline land, to analyze rice ' s physiological - ecological indexes and the change of soil salt content under the conditions of control irrigation leaching of rice and and to provide control irrigation and combined modle of intermittent leaching to adapt to different conditions

    本文從試驗及試驗資料入手,取得以下主要成果和結論:對鹽堿地水稻水灌溉技術進行優化研究,系統地分析了不同水灌溉技術對水稻生理指標及產量的影響,採用了多目標模糊優化的方法,對灌水技術進行綜合評判,優選了水灌溉技術,論證該地區宜採用水稻控制灌溉技術;闡述控灌技術通過調和控制水稻的需水規律,降低水稻高產情況下的無效水量消耗,從水稻生理、生態水兩方面分析了控灌技術水機理,針對性地總結出水稻各生育實施水控灌技術的步驟及技術要點;通過控灌與淹灌的定量對照比較,從根系、莖蘗、冠層葉片及綠葉動態到株高,土壤水分變化,抗病蟲害、抗倒伏能力,稻田土溫變化,產量構成因素及稻米品質等諸多方面進行動態比較,分析控灌技術高產優質機理;在鹽堿稻地採用控制灌溉+歇淋洗模式,跟蹤測試田水鹽變化狀況,驗證控制灌溉技術在鹽堿地區水稻灌溉中應用的適應性,通過分析水稻控制灌溉淋洗下水稻生理生態指標,提出優化控制灌溉+歇淋洗組合模式,為進一步在高礦化度地區試驗水稻控灌技術奠定基礎。
  2. After the successful completion of the test run specified in clause 74 of this chapter, start - up of the equipment shall be carried out by the enduser under seller ' s instructions and supervision according to the contract schedule according to appendix iii and said date shall be coordinated and finally decided by both parties 7 ( seven ) days in advance and thereafter commissioning shall be carried out as soon as possible

    在成功完成按本章中的第74所指定的運作測試后,最終用戶應在賣方的指引及監督下根據合同附三中的時表對設備進行初次運作,而上述時表(所規定的日)應經雙方調整並提前7天確定.而其後的試產應盡快執行
  3. During wheat and barley bred in winter in sanya, some technological characteristics concerned must be wielded according to the ecological conditions there. 1 ) carefully select materials and avoid planting the materials that can not head in sanya. 2 ) cultivated measure : spread lime before ploughing ; and make furrows during soil preparation. spread funandan in sowing furrows. after every irrigation and heavy rains, surplus water must be drained off immediately and soil must be intertilled in time. it is also a key measure in breeding in winter to prevent and eliminate the plant disease, pest and mice during plant growing period. 3 ) the flowering period of parent for hybridization must be adjusted. 4 ) the criterion for each trait selection to breeding materials should be soften to different degrees

    在三亞冬繁麥類時,應根據當地生態掌握好有關技術特點:慎重挑選冬繁材料,盡量避免攜帶可能在三亞不抽穗的材料;栽培措施應注意耕翻前撒施石灰,整地需開廂起壠,播種溝先撒呋喃丹,灌水及大雨後要排除余水,及時鬆土,生育注意防治病蟲鼠害;雜交親本應注意調;對育種材料各性狀的選擇標準都要不同程度地放寬。
  4. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫區特殊的地質環境與工程實際情況,在充分考慮水對庫岸滑體穩定性影響的前提下,提出了一個適用於長江三峽庫岸滑坡體穩定性分析的綜合分析評價體系,並取得了如下幾個方面具有工程實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,水的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下水位升高降低了滑坡體的有效應力,另一方面是由於地下水的長浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對三峽庫區的特殊,系統分析了作用於三峽庫區滑坡體上的力系和庫水位在175m與145m變化時滑體塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長降雨狀態) 、 175m庫水位、地震以及庫水位由175m調下降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型計算工況,並具體給出了相應的作用荷載的計算方法,使在庫區岸坡滑體穩定性分析評價時對計算工況選擇及其作用荷載的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析計算更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於重慶市豐都縣名山滑坡穩定性分析的具體事例中,分析結果表明,本文所提出滑坡體穩定性綜合分析評價方法對三峽庫區的滑坡穩定性分析是實用可行的。
  5. Thirdly, the mathematics model of forecasting low flow was established in fengcong and fenglin regions according to these factors influencing the amount of low flow in karst drainage ( the area of drainage, lithology, the type of landforms and its special assembly and forest ) the conception of low water resources carrying capacity was first put forward according to the changing law of low water resources in space and the situation of exploitation and utilization in karst drainage ( ie, under the condition of the virtuous ecological environment and the available technology, the explorable amount of water resources in certain areas is capacity and limitation which is able to coordinate the development of population, enviroment and economy during the period of low flow seasons ) and preliminarily analyzed its connotation, characteristic and established the index system of low flow in karst drainage

    三是根據影響喀斯特流域枯水徑流的下墊面因素(空尺度、巖性、地貌類型、植被) ,分別對峰叢和峰林等喀斯特地區建立枯水徑流預測模型。根據喀斯特流域枯水資源的空變化規律以及實際開發利用狀況,首次提出了枯水資源承載力的概念,即在枯水季,保持良性的生態環境和現有的技術下,某一區域內可開採的水資源量對支持該地區人口、經濟與環境協調發展的能力和限度。並初步分析了枯水資源承載力的內涵、特性,從水資源的供需方面確立了喀斯特流域枯水資源承載力的指標體系。
  6. The main features in the study of flood forecasting and control system are as follows : ( 1 ) runoff generating and confluence theory and hydro - dynamic method are adopted to predict the water level of taihu lake and key nodes, the basin wide forecasting and control system with the function of real time correction has been first established in plain river network to meet the complicated flow conditions of taihu lake basin and to enhance the reliability of forecasting results ; ( 2 ) according to the rainfall in foreseen period multiple schemes can be made in the forecasting model and adjusted with time, which overcomes the errors caused by the uncertain rainfall in the foreseen period so as to make the forecasting results approach reality

    本文所研究的預報調度系統有如下特點: ( 1 )本系統採用產匯流理論和水動力學方法預報太湖及重要點水位,首次在平原河網地區建立了具有實時校正功能的全流域預報調度系統。以適合太湖流域復雜的水力,增強預報的可靠性; ( 2 )預報模型可以根據預見降雨量進行多方案預報,並隨時推移,可以實時進行調整,克服由於預見降雨不確定引起的誤差,使預報結果更接近實際。
  7. After the successful completion of the test run specified in clause 74 of this chapter, start - up of the equipment shall be carried out by the enduser under seller ' s instructions and superision according to the contract schedule according to appendix iii and said date shall be coordinated and finally decided by both parties 7 ( seen ) days in adance and thereafter commissioning shall be carried out as soon as possible

    在成功完成按本章中的第74所指定的運作測試后,最終用戶應在賣方的指引及監督下根據合同附三中的時表對設備進行初次運作,而上述時表(所規定的日)應經雙方調整並提前7天確定.而其後的試產應盡快執行
分享友人