梯級布 的英文怎麼說

中文拼音 []
梯級布 英文
ottoman
  • : Ⅰ名詞1 (梯子; 樓梯) ladder; stairs; steps; staircase 2 (姓氏) a surname Ⅱ形容詞(形狀像樓梯的...
  • : Ⅰ名詞1 (等級) level; rank; grade 2 (年級) any of the yearly divisions of a school course; gra...
  1. The three men who had come with britten sat on the steps and stared gloomily at the floor.

    里滕來的三個人坐在上,陰沉沉地瞪著地板。
  2. The little princess and mademoiselle bourienne had already obtained all necessary information from the maid, masha ; they had learned what a handsome fellow the ministers son was, with rosy cheeks and black eye - brows ; how his papa had dragged his legs upstairs with difficulty, while he, like a young eagle, had flown up after him three steps at a time. on receiving these items of information, the little princess and mademoiselle bourienne, whose eager voices were audible in the corridor, went into princess maryas room

    矮小的公爵夫人和里安小姐從侍女瑪莎那裡接獲各種有用的情報,談到某個面頰緋紅眉毛烏黑的美男子就是大臣的兒子,他父親拖著兩腿費勁地登上階,而他竟像一隻蒼鷹,一舉步就登上三子,跟在他身後走去,矮小的公爵夫人和里安小姐從走廊里就聽見他們興致勃勃的談話聲,獲得這些情報后,就走進公爵小姐的房間。
  3. The application to qingjiang cascade hydropower plants shows that the proposed model can give the controlling rules for optimal dynamic flood storage and elevates the efficiency of reservoir system management and utilization of flood water

    該模型應用於清江流域水庫,計算結果表明,在不降低水庫及原有的防洪標準前提下,能有效利用上游水埡水庫的防洪庫容,分擔隔河巖水庫部分防洪任務,並顯著提高水庫發電量。
  4. ( 2 ) theoretical analysis of optimal theory for cascade hydropower station applying decision support system to carry out rational river planning in stepped exploitation includes cascade station arrangement, selecting optimal parameters of indropower station, decision of stepped exploitation order and optimal dispatching for reservoir etc. for uncertain problems, decision support system only supplies an auxiliary decision to the decision maker, not taking the place of decision maker

    ( 2 )水電站優化調度的理論分析在開發中應用決策支持系統進行合理的規劃,包括胃、水電站參數的最優選擇、開發順序決策和水庫運行的優化調度等問題。在對不確定性問題上,決策支持系統給決策者只是提供輔助決策,而不是替代決策者。
  5. Situated in libu town 60km away from the city, the resort has lots of fantastic waterfalls, spacious water and outstanding scenic spots of quiet beauty

    位於距市區60公里的蒼梧縣梨埠鎮,有全國罕見的,集雄、險、幽、奇、絕於一體的皇殿群,寬闊的水面,幽靜迷人的景色。
  6. Shui buya hydro - hinge is the upest cock step of three - step cascade hydroelectric power stations from upstream to down stream on the middle low reach of the main course of qingjiang river, which is going to be developped by hubei qingjiang hydroelectric development ltd after constructing ge he yan and gao ba zhou hydroelectric power stations

    埡水利樞紐是湖北清江水電開發有限責任公司繼隔河巖、高壩洲水電站之後,在清江中下游幹流上實施三開發的最上一龍頭水電站工程。
  7. Hongjiadu hydraulic power plant is the only leading water storage reservoir of wujiang cascade hydraulic stations, which is a full - time storage reservoir. 2 * landslide body is distributed at the right side of downstream, which is just located in the region of energy dissipation. erosion gully may cut the bottom of the landslide body. there are roads on the top of the landslide body during the construction period and operating period

    洪家渡水電站是烏江水電站中唯一具有多年調節性能的「龍頭」水庫, 2 #塌滑體分佈於壩址下游右岸,恰好位於泄洪消能防沖區內,沖坑將塌滑體下部切腳,而且施工期和運行期在其上都置有公路,因此2 #塌滑體失穩將影響整個水電站的正常運行。
  8. Starting on monday, the blog will reveal their weight and waist measurement each week, as well as the number of paces they walk, the number of stairs they climb and the amount of alcohol they consume, the paper said

    從12月4日開始, takemi和ishida將會每周在博客里公一次有關體重和腰圍的最新測量結果,兵公在這段時間內行走的步數爬樓數以及身體攝入的酒精量等。
  9. Transition and upgrade with internal industry cluster exists gradient shift, pareto optimality, extending, driving, low comprehensive cost of industry overall arrangement, etc. of key enterprise of industry roller chain hard to upgrade, store in

    產業集群內部的轉型、升存在產業度轉移、帕累托最優、產業鏈條延伸、核心企業帶動、產業局綜合成本最低等機理。
分享友人