梯級運河 的英文怎麼說

中文拼音 [yùn]
梯級運河 英文
step-shaped canal
  • : Ⅰ名詞1 (梯子; 樓梯) ladder; stairs; steps; staircase 2 (姓氏) a surname Ⅱ形容詞(形狀像樓梯的...
  • : Ⅰ名詞1 (等級) level; rank; grade 2 (年級) any of the yearly divisions of a school course; gra...
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • 運河 : canal
  1. By analyzing interval flood and cascade operation characteristics of the upstream yellow river basin, the influence of longyangxia reservoir operation mode in different states on gongboxia power station construction during flood period is studied

    分析區間洪水特性和黃上游行特點,針對龍羊峽水庫實際行狀況,分析不同狀態下的龍庫行方式對公伯峽水電站的施工渡汛影響。
  2. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯峽水電站的建設,以電站建設期施工渡汛為研究重點,從實施出發,分析黃上游氣候特性和水庫群的實際行狀況,對施工渡汛中的主要問題?洪水流達時間、區間洪水預報、渡汛風險、汛期預警、龍羊峽水庫在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪水預報方案和調度方法,為公伯峽水電站施工期建設提供技術支撐。
  3. After the changes of the construction management system of lijiaxia hydropower station have been studied, the paper puts forward some thoughts on establishing and operating the rolling - development mechanism in the hydropower step constru ction in the upstream of yellow river according to the requirements of modern en terprise system and on the basis of making full use of the rich experience of th e construction management of lijiaxia hydropower station, which could accelerate the hydropower development and alleviate the power shortage so that it could ma ke great contribution to promote the economic development in the northeast regio n and to our socialism build

    在研究了李家峽水電站建設管理體制的變革過程后,提出了按照現代企業制度要求,利用李家峽水電站工程建設管理的豐富經驗,建立、作黃上游水電滾動開發機制的設想,以便加快開發速度,緩解電力嚴重不足的現象,振興西北經濟,為我國社會主義建設做出巨大的貢獻。
  4. 3. intelligent decision support system application in the cascade hydropower station basic theoretical frame of river exploitation planning and optimal dispatching management is probed into by analyzing the current situation of planning and dispatching for hydropower station reservoirs

    3 、智能決策支持系統在水電站中的用在分析我國水電站庫群規劃和調度現狀的基礎上,探討了流開發規劃與科學調度管理的基本理論框架。
  5. In this article, the author study the short - term optimization dispatching of cascaded hydropower in order to get a practicable mathematical model and arithmetic. basing on deep analysis and generalization of yilihe cascaded reservoir, the author set up a short - term dispatching mathematical model and an inner - plant economical operation model to simulate the real operation process. dynamic programming method ( dp ) is effective to solve the several problem and discrete differential dp ( dddp ) is a reduce dimension tool

    本文緊密結合雲南省境內的以禮水庫的工程實際,在對其進行深入分析和概化的基礎上,建立了反映實際問題特點的電站短期調度模型和廠內經濟行模型,動態規劃方法以其擅長求解多階段決策過程問題而被本文選為優化工具,由於dddp的降維效果顯著,從而使動態規劃在本研究模型中得以用。
  6. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃炳靈(寺溝峽)水電站是黃幹流上的一個電站,為了減少征地移民損失,經對炳靈水電站(塔坪壩址)尾水斷面在劉家峽水庫不同行方式下的水位與流量關系進行分析研究,在總裝機和年發電量基本不變的情況下,充分利用劉家峽水庫汛限水位,將電站樞紐選址在其電站庫尾內。
  7. Intelligent decision support system for the stepped exploitation in the medium - and upper - reaches of shitou river valley bases on the basic theoretical frame and content as stated above, practice of intelligent decision support system in the stepped exploitation is explored by citing and analyzing a concrete instance of the stepped exploitation in the medium - and upper - reaches of shitou river valley, reflecting the feasible application of the view and theory put forward in this thesis in the practical planning

    對多目標多模型進行系統分解,採用層次結構的思想體系。 2 、石頭中上游流域開發的智能決策支持系統研究在上述內容與理論框架研究的基礎上,以石頭中上游流域開發為實例,探討了決策支持系統在開發中的具體實踐。是本文觀點和結論在具體規劃中的用。
分享友人