構造柱狀體 的英文怎麼說

中文拼音 [gòuzàozhùzhuàng]
構造柱狀體 英文
tectonic pile
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • : Ⅰ名詞1 (形狀) form; shape 2 (情況) state; condition; situation; circumstances 3 (陳述事件或...
  • : 體構詞成分。
  • 構造 : structure; construction; constructional detail; tectonic; structural; makeup; anatomy; constituti...
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結加固技術的目的和意義、國內外發展況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及設計,提出了「通筋穿法」做承臺梁, 「抗彎抗剪錨筋法」強化加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結加固、整穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  2. The main body of the stadium is composed of 24 columns of trusses, which surround the bowl - shaped stands in the stadium

    鋼結由24桁架圍繞著育場碗看臺區旋轉而成,整外觀酷似「鳥巢」型。架,桁架,鋼梁
  3. It has a large region of application in solid rocket motor grain design and has made new improvements compared with other available codes. user can easily and rapidly build his initial grain shapes and then obtain geometric information of his design. according to the theory describeds in the paper, the regressions of the burning surface area and the pressure are obtainded

    該系統擴展了固火箭發動機裝藥的設計能力,用戶可利用它簡捷地出三維藥的初始形,並獲得設計所需的各個幾何參數,進而依據本論文提出的復雜三維藥內腔燃燒推移和燃面計算的方法,計算出燃面變化和壓強變化,得到推力隨時間變化的曲線,再依據這些計算結果進行再設計,直至達到滿意的結果為止。
  4. On the basis of demand analysis, this thesis finishes the design of the system and realizes some key functions, including industrial section modeling, the drawing and the mutual modifying of the drill histogram, the formation and the perfection of the projection section, the construction of stratum modeling, and the realization of the mechanism of data communication administration

    在需求分析的基礎上完成了系統的設計,系統成功地實現了工區模型組件、鉆孔圖模型組件、剖面模型組件、層模型組件的與各類組件間的數據通信管理機制的軟實現。
分享友人