構造等高距 的英文怎麼說

中文拼音 [gòuzàoděnggāo]
構造等高距 英文
structure contour interval
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • : Ⅰ量詞1 (等級) class; grade; rank 2 (種; 類) kind; sort; type Ⅱ形容詞(程度或數量上相同) equa...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ名詞1 (距離) distance 2 (雄雞、雉等的腿的後面突出像腳趾的部分) spur (of a cock etc )Ⅱ動詞...
  • 構造 : structure; construction; constructional detail; tectonic; structural; makeup; anatomy; constituti...
  • 等高 : equal altitude [height]; accordant
  1. Contours are graphic expressions with uniform spacing depicting a structure's character.

    線是用圖解描述形態的。
  2. It has been improved, and specially proposed : firstly, we has increased run speed and ensure the diversity of population is with constructing non - dominated set by throwing off the dominated solutions, expressing the interior relation of individuals each other by the crowding distance, and constructing new population. secondly, we have further improved its convergence performance by clustering in precondition of ensuring a better distribution of individuals

    該文以nsga -為基準,對演算法進行了改進,具體提出了:用排除法非支配集、用聚集離刻畫個體間的內部關系以及新群體,來提運行速度和保持群體的多樣性;用聚類演算法在保持原有特性的前提下,進一步改善收斂性能
  3. The main design points of passive design techniques have been dissertates by the numbers, from three aspects of building groups, single buildup and building parts, which include building group layout, orientation space between, wind protection solar heating, thermal mass and nocturnal cooling and natural ventilation etc. the dissertation also explains the whole climate design process is three stage of climate analysis, conceptual design stage and schematic design evaluation and at last, taking a high - rise residential building as an example case study, evaluates its climate adaptation strengths and limits, and then proposes the correctional advises for responsive to climate

    本文著重從建築群體關系、單體設計、局部三個層面上論述了各設計分區技術策略的設計要點,包括布局、朝向、間、防風、太陽g睬暖、建築蓄熱降溫、自然通風。最後本文以西安為例,給出了建築氣候設計程序為氣候分析?方案設計?方案評價三個主要過程,並對一層住宅建築的氣候適應性進行了分析和評價,提出了方案的修改建議。
  4. The laminated jib crane is suitable for the production and maintenance in such fields as machinery manufacture, railway, chemical industry, light industry, etc. the characteristics of this product are novel structure, convenient operation and high efficiency

    疊臂式旋臂起重機適用於機械製,鐵路化工,輕工行業的生產維修場合。該產品具有結新穎,伸屈自如,操作靈便,效節能,是短離吊運作業頻率的生產線上的理想的起重設備。
  5. In order to make the studying about the seismic exploration method possess systematic nature and the ability of tackling key problem in front - zone of mountain, we have done the research work of tackling key problem aiming at the field gathering technology of seismic exploration of the complicated structure belt ( the construction of underground and the earth ' s surface condition are complicated ) of front - zone of mountain in this text, and a large number of relativity trials by the close combination of production and scientific research, summarized a set of field method of the complicated structure belt of front - zone of mountain, adjusted both of trial factor and construction factor of the field gathering in time, achieved finally the goal of making its structure character clear

    近幾年來,隨著地震勘探裝備和技術的改進,野外資料採集技術有了新的進展,主要表現為多種震源聯合激發方法(井炮和大噸位可控震源) ,基於地表條件及表層調查基礎上的激發選點方法,小道、長排列、覆蓋接收方法,基於模型的「分段、分線、分區」觀測系統目標設計方法,取得了顯著的勘探效果。為了使山前地震勘探方法研究具有系統性和攻關性,通過本文對復雜山前復雜帶地震勘探的野外採集技術進行攻關研究,進行了大量具有針對性的試驗,總結出了一套山前復雜帶野外施工方法,最終達到了搞清復雜山前復雜帶山前復雜特徵的目的。
  6. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄速堰橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大)現場施工安裝結安全性測試分析咨詢" ; "南京地鐵三山街站中樓板及底板樑柱節點技術安全可靠性的測試分析與技術改進咨詢服務"項目。
  7. By the analysis to the assessment object system of the bidding capability of architecture and construction enterprises, the countermeasures for improving of the architecture and construction enterprises to succeed in bidding, are put forward as follows : architecture and construction enterprises figure out the contract prices reasonably ; strengthen the effort to innovate, develop, and scientifically manage ; strengthen the effort to create the enterprises image ; strengthen the development and management of manpower resources. furthermore, every countermeasure mentioned above is analyzed in detail, the places, still need to be paid attention at and to be completed have also been pointed out

    通過分析與國外建築施工企業競標能力之間的差,分別從微觀對策和宏觀對策兩方面論述,提出了提我國建築施工企業競標能力的對策,微觀對策分別從提建築施工企業投標報價水平、加強開拓創新和管理科學、加強企業形象的塑、加強人力資源開發與管理四方面著手,宏觀對策分別從調控規模優化結、健全法規嚴格執法、健全和完善有形建築市場、健全制度規模管理四方面著手,並對每一對策進行了詳細的分析,提出了注意的要點和完善的地方。
  8. The distance measure instruments made by traditional bulk silicon cmos process is not able to work in the hard environment because of the restriction of the bulk silicon material structure. the environment of the space radiation and high temperature will degrade the measure precise and the work speed of the instruments

    傳統的體硅cmos工藝製的測儀由於體硅材料和器件結的限制,無法工作在惡劣的環境下,空間的輻射、溫度的升都會導致器件和電路的性能急劇惡化,測量精度和工作速度下降,不能滿足宇航事業的要求。
分享友人