樁的承載能力 的英文怎麼說

中文拼音 [zhuāngdechéngzǎinéng]
樁的承載能力 英文
pile capacity
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ動詞1 (托著; 接著) bear; hold; carry 2 (承擔) undertake; contract (to do a job) 3 (客套話...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 能名詞(姓氏) a surname
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 能力 : ability; capacity; capability
  1. Cast - in - place piles with expanded branches or plates based on common concrete bored piles are a new type of piles foundation which have the specialty of high vertically bearing capacity and have been marked both economic and social benefits. especially in the resist draw load, it indicates a broader application scope. however, because of the poor application of cast - in - place piles in the practices, almost all the experiments are based on modeling experiments

    擠擴支盤混凝土灌注是近年來工程界有較強生命型,該型是採用仿生學方法在原有等截面混凝土灌注基礎上研發成功,其顯著特點就是具有較高單方混凝土,具有良好社會與經濟效益。
  2. With the application of steel piles in engineering, people pay more and more attention to lateral resistance of pile

    隨著鋼在工程實踐中應用,水平越來越引起人們重視。
  3. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外鉆孔基礎發展歷程及研究現狀,重點討論了填石壓漿混凝土空心、預制預應混凝土空心工藝、填石壓漿混凝土配合比設計原理及影響強度指標主要因素;根據泥漿水學原理,導得了考慮各種因素水泥漿液在預填骨料中流動影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿混凝土空心基礎質量檢測方法及標準;並在此基礎上,深入分析了側、,提出了填石壓漿混凝土空心設計計算理論和方法。最後,論證了空心新工藝可行性、適應性、經濟性,為大推廣應用空心新技術提供了可靠技術資料。
  4. The grouting test result shows that this technique of pile foundation construction is effective, it can not only increase the upper and skin friction of the cast - in - place pile, but also improve the bearing capacity of the cast - in - place pile, and gain a larger economic benefit for whole project at the same time

    端壓漿實驗結果表明,該技術可以增加鉆孔灌注端阻側壁摩阻,是一項行之有效基施工技術,它可有效提高鉆孔灌注樁的承載能力,同時提高經濟效益。
  5. Abstract : compared with soil destroyed pattern of vertical force and its controlled factor of bearing capacity, it is concluded that pile capacity and its tip resistence have some difference when soil with the same physical mecanic property is used as natural foundation and pile tip resistent layer. whereas the middle weathering rod stratum hasn ' t this property, that is to say it has the same bearing capacity and pile tip resistence

    文摘:通過豎向荷下土(巖)體破壞模式及其控制因素比較,論述了物理學性相同土層作為淺基礎天然地基與端持層時,值與端阻值應存在一定差異;而中(微)風化程度同一巖層作為天然地基與端持層時,不具有這方面差異性,值與端阻值應該相等。
  6. Considering the engineering of trail pile in hubei jingzhou yangtze river highway bridge, the construction process of deep cast - in - place pile under pebble geological structure, the limit load - bearing capacity of single pile, side friction stress and head drag are researched in this thesis deeply

    論文結合湖北省荊州長江公路大橋試驗工程,深入研究了江漢平原地區卵石地基深鉆孔灌注施工工藝、單極限側摩阻和端阻
  7. Strengthening soft soil foundation by mixing cement with soil, which is a specific application of strengthening large - area foundation in piled structure by powder jetting mixing, can increase load supporting capability of soft soil foundation, decrease subsidence and increase stability of edge slope

    摘要水泥土攪拌法加固大罐基礎是利用粉體噴射攪拌法裝結構加固大面積地基具體應用,它可以增加軟土地基,減少沉降量,提高邊坡穩定性。
  8. It is provided by the result of observing for the trial of pile, if the cast - in - place is constructed according to strict technological process, the limit load - bearing capacity of single pile is more larger then its calculational value, and under the function of the most trial loading, the frictional drag haven " t occur yield in every major loading layer, so the pile have greatly safety reserve in engineering

    試驗觀測結果證明,按照嚴格工藝流程施工鉆孔灌注,其單極限遠大於計算值;在最大試驗荷作用下,各主要持層均未出現摩阻屈服現象,有較大工程安全儲備。
  9. In basis of integer bush, the flange bush adopt high speed friction jointing, the materil are alluse 10 steel bracking, the surface sinter cupbsn 10 - 10tin and copper powder, have enough carrying capability and longer using life, not easy to flake off. suitable for engineer mechanism, panzer, train, pile driver, take the place of bronze cover, save the costs greatly, make the useful life longer

    翻邊軸套在整體軸套基礎上,採用高速磨擦焊接製作而成,材料全部採用以10井鋼背為基礎,表面燒結cupbsn10 - 10錫青銅粉,具有大,使用壽命長,不容易脫落等優勢,主要適用於工程機械,坦克,火車,打機上,以替代原來青銅銅套,大大節約了成本,延長了產品使用壽命。
  10. The results reached are compared and discussed. the ways and means that are presented by schmertmann and the steel pipe society of japan of making certain of the bearing capacity of a single pile through the knocks of spt are verified. finally some views and suggestions of authors are arrived at

    對豎向荷作用下,單理論、確定方法進行了一些歸納和總結,並結合一實際打(小直徑預制)工程對幾個典型豎向計算公式進行驗證,並與夠代表真實值荷試驗結果對照,分析特定條件下各計算方法精度及其局限性。
  11. By rational designing and utilizing of the steel liners for the bored piles with varying cross sections in deep waters, the bearing capacity can be increased and the cost can be reduced

    合理地設計和利用深水中鉆孔灌注護筒,採用變截面,可以提高基,降低造價。
  12. In the paper, through the example of the waiting hall of xt an international airport, several main questions meet in the design have been discussed, analyzed and solved, which include in negative friction force around pile in collapsible loess, the calculating method of bearing capacity of pile. the crack control methods of analysis and design in the super - length reinforced structure have been tested in the project, and reached the effect to be hoped

    本文通過西安咸陽國際機場新航站樓工程設計具體實例,分析、論述了建築結構在設計中遇到並解決幾個主要問題:如自重濕陷性黃土場地基負摩阻問題;淺層土雖經強夯但下層土仍有可產生負摩阻計算方法;對鋼筋混凝土結構裂縫控制實現超長設計分析和設計對策,經過工程驗證,達到了預期效果。
  13. The model experiments results indicate that the pile group composed of extending all around piles can bear inclined load better. this is beneficial to the foundation of transmission tower. the prototype experiments results indicate that the micropile ' s load capacity is satisfied with design

    模型試驗發現,伸向四周組成具有更好抵抗傾斜荷,這一點特別有利於輸電線路基礎等;原型試驗發現,微型和群完全達到設計要求,其群效率在0 . 9左右。
  14. With the fast development of large span bridge and high - rise buildings, the bearing capacity and the length of piles are increasing, and the analysis and design principle of piles under inclined loads has been become a problem to be solved in civil engineering

    隨著我國近年來大跨徑橋梁及高層建築迅速發展,基樁的承載能力長日益增大,傾斜荷下基分析和設計理論已成為目前土木工程界亟待解決重要問題之一。
  15. The distance between routine piles foundation is oversized in order to use soil ' s supporting capacity and think over the pile - soil ' s combined supporting capacity. this pile foundation is called composite pile foundation

    為了發揮間土,考慮土共同擔荷,常規距被加大,這種基稱為復合基。
  16. Research on calculation of relibility analysis for pile foundation bearing capacity

    可靠性分析計算研究
  17. These influence influeoce the excavation in desert, shallow foundation design on natural ground, and the bearing capaceity of pile foundation

    沙漠砂這種強度特徵全面影響著沙漠場地基坑、開挖、天然淺基礎設計和
  18. The numerical simulation indicate that it promote permafrost growth and accelerate the course of recover frozen greatly after fluting via natural convection dropping temperature effect, the top line of permafrost rises greatly, consequently enhance pile bearing capability and so do the capability for resisting frost heaving and thaw settlement

    數值模擬分析結果表明,身刻槽后,利用多孔介質自然對流降溫效應,促進了凍土發育,使回凍時間大為縮短;凍土上限大幅度抬升,從而使得提高,抗凍脹融沉性提高。
  19. Main parameters affecting bearing capacity of sfrc four - pile caps

    鋼纖維混凝土四臺主要參量對影響
  20. The test on horizontal bearing capacity of thin - wall hollow pile is analyzed in the paper, which has been carried by shanghai investigation and design institute. the calculation results conform to the testing results. so, the analysis methods presented in the paper are validated by the results from field test

    文中對上海勘測設計院進行薄壁筒水平試驗進行了相應計算分析,所得結果規律與試驗結果較為吻合,使得本文提出分析方法得到了現場試驗驗證。
分享友人