樁腳 的英文怎麼說

中文拼音 [zhuāngjiǎo]
樁腳 英文
spud
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • : 腳名詞1 (人或動物的腿的下端 接觸地面的部分) foot; [兒語] footsie; footsy 2 (東西的最下部) bas...
  1. Handrails and footrails at masts, posts and walls on ships

    船上的扶欄和桅桿上的部護欄柱墻壁
  2. In consideration of the soil arch effect between anti - slide piles, a calculation formula for the anti - slide pile spacing was developed, taking the following factors as the controlling conditions - the static equilibrium equation of the frictional resistance and adhesive force between the side of piles and slope soil, which sustains the thrusting force of the landside, and the strength conditions at the medial cross - section and two end sections of soil arch

    摘要考慮抗滑間土拱效應,以側與邊坡土體間的摩阻力及黏著力承擔滑坡推力的靜力平衡條件和土拱跨中與拱處截面的強度條件共同控制,建立了抗間距的計算公式。
  3. When wildeve came on to that spot his ankle was caught by something, and he fell headlong.

    過了一會兒,韋狄走到那塊地方的時候,有一東西把他的脖子絆住了,把他摔了一個倒栽蔥。
  4. Three kinds of springs were used to imitate different lateral stiffness of soft ground, and special drawers with sliding path were modeled as lateral displacement pile of embankment during its filling periods, with the function of reinforced - mat considered. on the basis of the data of tests designed by thogonal table l9 ( 34 ), three kinds of ( factor, depth of layer, loading ) state matrixes are obtained which could be used for procedure analysis by making use of the principle of information matrix conformation

    用彈簧模擬土體的側向剛度,用可滑動的特殊抽屜模擬軟基填築路堤坡的邊,並基於對邊側向位移速率影響程度室內模型試驗測試數據,利用信息矩陣構造原理,構造了總攬全局的、可用於過程分析的三種(因素、層位和荷載)狀態矩陣。
  5. Topics include : site investigation ( with emphasis on in situ testing ), shallow ( footings and raftings ) and deep ( piles and caissons ) foundations, excavation support systems, groundwater control, slope stability, soil improvement ( compaction, soil reinforcement, etc. ), and construction monitoring

    主題包含有工址調查(強調現地試驗) 、淺基礎(基式基礎與筏式基礎)和深基礎(基礎與沉箱) 、開挖之支撐系統、地下水控制、邊坡穩定、土壤改良(夯實與土壤加勁等)和施工監測等。
  6. 5 ) the method to calculate the natural periods of staggered truss with sshsti with raft - pile foundation is decided, and the natural periods of staggered truss with column foot fixed and sshsti with raft - pile foundation are calculated and investigated

    5 )明確了計算地基及筏基礎共同作用時固有周期的計算方法,計高層鋼結構交錯析架體系一與地基基礎共同作用研究算研究了交錯析架體系柱固定時和地基及筏基礎共同作用時體系的各個固有周期。
  7. No firm agreement has yet been reached over the fee, although despite the mutual enmity between the clubs that will not prove to be an intractable block on the move

    至今雙方還沒有達成一致,無論怎麼講,雙方歷來的敵意都不會成為這轉會的絆石。
  8. Twigs crackled under his feet, logs tripped him, funguses on stumps resembled caricatures, and startled him for the moment by their likeness to something familiar and far away ; but that was all fun, and exciting

    枯枝在下斷裂,噼啪作響,橫倒的樹干磕絆他的腿,樹上長出的菌像漫畫中的怪臉,乍看嚇他一跳,因為它們酷似某種又熟悉又遙遠的東西,可又怪有趣,使他興奮不已。
  9. Based on observing several engineering practices, an assumption is put forward that there are unloading arches in the soil between the piles. in order to research the effect of soil arch, the author designs an indoor model and analyzes the result of the exam

    本文通過幾個工程實踐所表現出來的與傳統認識相悖的現象,指出了傳統認識在實踐面前站不住,給出錨體系立柱間土體存在卸荷拱的假定。
  10. Some 9 / 11 families have criticized rebuilding officials for sidestepping historic preservation and the commitment not to rebuild on the acre - wide squares where the twin towers were anchored, known as their " footprints.

    一些911受害者親屬批評重建機構對保存歷史遺跡躲躲閃閃,對承諾不在雙塔的基處重建一事採取迴避態度,雙塔基處那一英畝見方的廣場被認為是雙塔的「印」 。
分享友人