樓蓋主梁 的英文怎麼說

中文拼音 [lóuzhǔliáng]
樓蓋主梁 英文
floor girder
  • : 1 (樓房) a storied building 2 (樓房的一層) floor; storey 3 (房屋或其他建築物上加蓋的一層房子...
  • : 蓋名詞(姓氏) a surname
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  1. A material nonlinear finite element analysis for the cast - in - place reinforced concrete hollow slab that occurs from initial loading, cracking, yielding to failing is carried on. the cracking load, ultimate load, the displacement rules and the principal stress distribution rules of the hollow slab under the vertical loads are obtained. a material nonlinear finite element analysis for the single span hollow flat - plate floor is also carried on

    其次對空心板進行了從加荷、開裂、屈服直至破壞的全過程材料非線性有限元計算,得到了空心板在豎向荷載作用下的開裂荷載、極限荷載及位移和應力分佈規律;還對單跨無進行了材料非線性有限元計算,通過分析應力場明確了柱上暗扁的作用;有限元計算的結果驗證了以上的理論分析並得到了一些重要的結論,對改進現澆空心板無的構造措施有重要的參考價值。
  2. The one - way slab, two - way slabs, principal and subordinate - beam structure, non - beam structure and the grid - beam structure are putting into use in the reinforced concrete slab

    鋼筋混凝土(屋)結構大都採用單向板、雙向板、結構、無板以及井字結構等。
  3. ( 6 ) the validity of control methods of crack has been verified by using engineering instances. on the basis of the researches mentioned above, some crucial conclusions are acquired as follows : ( 1 ) during construction, the cracks in beams and girders were caused by the drop of temperature and by the difference in the inside and outside temperature. the crack in slab was caused by shrinkage due to the loss of water

    通過上述研究工作得出了一些重要的成果: ( 1 )在施工階段,大面積現澆結構的裂縫由溫度降幅和內外溫差引起,板的裂縫要由失水收縮引起; ( 2 )在施工期,由水化熱引起的應力要分佈在中,板中應力較小。
分享友人