樓面板 的英文怎麼說

中文拼音 [lóumiànbǎn]
樓面板 英文
floor board
  • : 1 (樓房) a storied building 2 (樓房的一層) floor; storey 3 (房屋或其他建築物上加蓋的一層房子...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • 面板 : [機械工程] face plate; panel; panel board; frontpanel; face ply [veneer]; surface veneer; skin pl...
  1. Wherethe long bridge deck within 0. 5 l amidships is regarded as strengthdeck, the midship section modulus and minimum thickness of the deckplating comply with the requirements of 2. 2. 1 and 2. 4. 2. l of this ischapter

    例1 :在船中部0 . 5l區域內的長橋作為強力甲時,其船中剖模數及最小厚度應滿足本章2 . 2 . 1及2 . 4 . 2 . 1的要求。
  2. Student dormitory - 4 floors on the ground, total building area 3, 422 m2

    學員生活大地上4層,總積3 , 422
  3. Reduce the use of timber by using alternative structural solutions ( e. g. metal hoarding, system form - work, metal form - work, semi - pre - cast flooring system, pre - cast roofing, dry walls and other structural means such as steel structural section, left - in formwork, etc. )

    改用其他結構方案(例如金屬圍、標準化模、金屬模、半預制系統、預制天、干墻及其他結構措施,如鋼造結構架和內留的模等) ,藉此減少使用木材
  4. Cold november rains drenched the earth and lent everything the gloomy air of a flemish landscape : the ground crew ran gear, a flag atop a squat airport building, a bmw billboard

    11月砭人肌膚的冷雨將大地塗得一片陰沉,使得身披雨衣的地勤工、呆然垂向地的候機上的旗,以及bmw廣告等的一切的一切,看上去竟同佛蘭德派抑鬱畫幅的背景一般。
  5. Slopping floor with express helical down ramp

    附設螺旋狀快速下匝道式
  6. Yuanfeng new building material co., ltd. is one of the biggest thermal insulation material producers in south china with annual output at 2 million square meters. established in 2000, the water - proof roof laminboard, purifying laminboard and other products made by the company are widely used in roof and wall panels for big span structure factory building, exhibition hall, purifying workshop, warehouse, combined house, indoor partition, building top attachment, refrigerator, automobile painting room, refrigeration frame and other buildings

    源鋒新型建材有限公司是華南地區最大的隔熱材料生產廠家之一,年產量達200萬平方米,始創於2000年,所生產的防水屋夾芯、凈化夾芯等產品廣泛用於大跨度結構廠房、展館、凈化車間、倉庫、組合房屋、室內間隔、頂加層、冷庫、汽車?漆房、製冷風櫃等建築的屋頂及圍墻等方
  7. The pattern of the roof deck panels should be set out in accordance with the design of the finish mosaic tile layout in order to minimize clashes between the open joint lines and the mosaic tile joint lines

    為減小開放介和馬賽克瓷磚接縫的沖突,頂蓋的圖案應按照完工的馬賽克瓷磚的布局來進行安排。
  8. The weight of the contents is transmitted by means of the floors to the beams.

    荷載通過傳遞給梁。
  9. At that time, schneider electric s all product line relating medium voltage, low voltage, panel, busways, final low voltage, wiring devices, vdi & building automation, industry control & automation, will be involved in these great projects

    屆時,施耐德電氣從中低壓配電、母線、盤櫃、低壓終端配電、開關、綜合智能布線系統和宇自控,到工控自動化的全線系列產品都將參與其中。
  10. At present, the product line provided by schneider electric, such as low voltage electric distribution, final low voltage electric distribution, vdi and wd products in merlin gerin brand, as well as the building automation system in tac brand, have covered all the needs in the building electric distribution and automation. with its more personalized design concept and high - tech innovative products, schneider electric will continuously concentrate on the innovation and provide qualified product and service to chinese r. e

    目前施耐德電氣旗下的梅蘭日蘭品牌的低壓及低壓終端配電、綜合智能布線、開關產品和tac品牌的宇自控產品已經涵蓋了宇配電和自動化的全部需求,並將不斷創新,以更為人性化的設計理念和更高科技含量的創新產品服務于中國的房地產市場。
  11. Open steel flooring

    漏空鋼
  12. Floor area squares is over 26. 5 hectares

    積高達8萬坪
  13. Experiment building - 4 floors on the ground, 1 floor underground, total floor area is 10, 788 m2

    實驗大地上4層地下1層,總積10 , 788
  14. Education training building - 6 floors on the ground, 1 floor underground, total floor area is 10, 374 m2

    教育訓練大地上6層地下1層,總積10 , 374
  15. Additionally, the choice model for associated activity locations is affected by travel time, duration of activity, shopping floor space in each district, and number of sightseeing spots in each district

    而非主要活動的地點選擇則受到旅運時間與活動消耗時間、該區商業積、以及該區觀光景點個數等因素的影響。
  16. Taiwan sugar corporation is located on the east side of tainan city, ovefiooldng the looping chung - hwa east road section 3. it s 4, 113 square meters in size, with a 15 - story building above ground, and five levels of basement, measuring up to 16, 740 pings in floor plan

    臺糖公司百貨商場位於臺南市東區,臨三十公尺外環道中華東路三段,積4 , 113平方公尺,興建地上15層地下5層,總積約為16 , 740坪。
  17. Its main exhibition floor measures 6, 706 sq. meters and it can accommodate 331 standard 3m x 3m booths. the specially constructed floor has a capacity to withstand 1, 500 kg. m2. with such a large capacity it is perfectly suited for exhibitions of large and heavy machinery

    世貿展覽二館全館總積為9 , 972平方公尺,可供展覽的一積為6 , 706平方公尺,可規劃331個標準展示攤位( 3x3公尺) ,地載重量每平方公尺為1 , 500公斤,對大型機械展的承載足可應付。
  18. It s also a superb place for international exhibitions or large - scale local shows like information month, since hall 2 can be flexibly matched with the main twtc exhibition hall for joint - venue events. vital statistics the twtc exhibition hall 2 has a total floor surface of 9, 972 sq. meters

    世貿展覽二館全館總積為9 , 972平方公尺,可供展覽的一積為6 , 706平方公尺,可規劃331個標準展示攤位3x3公尺,地載重量每平方公尺為1 , 500公斤,對大型機械展的承載足可應付。
  19. Dream of city, located at dang cheng of macau road and next to macau technology university, was invested by1. 5 billion dollars in total, with the area of 452, 000 square meters, structures of 32, 000t, project cost 450, 000, 000hong kong dollars. this project consists of 8 parts and the total area of floor surface is about 220, 000 square meters

    澳門新豪天地「夢幻之城」 ,該工程位於澳門路?城,毗鄰澳門科技大學,總投資約15億美元,積45 . 2萬平方米,其中鋼結構部分約3 . 2萬噸,工程費用為4 . 5億港元,該工程分為8個區域,積約為22萬平方米
  20. Since live loads on floor are usually expressed in terms of uniformly distributed loads for design purpose, in this paper, the sustained live load on floor are calculated respectively with the average load in room area and in batten area, while the transient live load on floor are computed with the average load in room area

    採用室積平均荷載法和進深積平均荷載法將持久性活荷載等效為均布荷載,給出了持久性活荷載的計算結果;採用室積平均荷載法計算給出了臨時性活荷載等效值。
分享友人