樓面高度 的英文怎麼說

中文拼音 [lóumiàngāo]
樓面高度 英文
floor depth
  • : 1 (樓房) a storied building 2 (樓房的一層) floor; storey 3 (房屋或其他建築物上加蓋的一層房子...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 樓面 : [建築] floor樓面板 floorboard; floor plate; 樓面面積 floor area; 樓面系統 floor system
  • 高度 : altitudeheightelevation
  1. This is so because climbing plants are likely to encounter intensive - changing environmental condition during their growth ( especially change of illumination ). secondly, there is a large proportion ( 30 - 40 % ) of climbing plants which belong to dioecism, and hence a gap between male and female plants on morphology, biological characteristic, economic value and so on. this dissertation focuses on herbaceous climbing plants, perennial or annual species such as dioecious trchosahthes kirilowii maxin and dioscorea opposita thumb, and monoecious luffa cylindrical ( l ) roem, it attempts to discover how climbing plants adapted to various environments and the mechanism of adaptation from aspects of physiological and reproductive ecologies at present, due to overuse of chlorofluorocarbons ( cfcs ), the ozonosphere has become thinner and thinner, and the ultraviolet - b ( uv - b ) radiation has increased considerably

    而攀援植物本身是一類理想的植物行為生態學研究材料:第一,攀緣植物由於受攀緣能力和支柱木資源的限制,在生長過程中通常要遇到強烈變化的環境條件(特別是光照) ;第二,攀緣植物中具有較比例的雌雄異株類型,通常佔地區攀緣植物種類的30 40左右,不同性別的植物在形態學及生物學特性、經濟價值等方存在一定的差距,因此,本文以雌雄異株攀緣植物栝( trchosahtheskirilowiimaxim ) (葫蘆科多年生草質藤本植物)和山藥( dioscoreaoppositathunb ) (薯蕷科薯蕷屬植物) 、雌雄同株異花攀緣植物絲瓜[ luffacylindrical ( l ) roem ] (葫蘆科一年生攀緣草本植物)為材料,試圖從生理生態學及生殖生態學角揭示攀援植物如何適應不同生境及其機理。
  2. The preceding example shows that the columns have a point of inflection within the height of each storey.

    例題說明在每一層內諸柱有一拐點。
  3. Based on the single point measurement, to a south towards constuction being built and some windows of the original housing behind the new building, this paper works out the whole height of the new building with the largest cubage which is also the optimization on the condition that all the windows mentioned above satisfying the sunlight standard. thus it can not only realize both land saving and scientific housing, but also give the designer some guiding advices

    在此基礎上,對一正南朝向的待建建築物和其後原有住宅上的窗體,在滿足原有住宅上的窗體都滿足日照標準的條件下,利用遺傳演算法來求解該待建建築物的整體,使其容積最大,即達到最優,從而達到節約土地和科學住房的目的,為建築設計者起到一定的指導作用。
  4. The number of modes should be selected according to the participant coefficient of mode when calculating the internal force by the response spectrum method ; ( 4 ) the roof plate of large base which connect the towers together should be thick enough but not exceeding the proper scope that the towers and the large base can vibrate together, ( 5 ) in structures with large base and muti - towers, with increasing of the capacity of the large base, the inter - story shear force will increase while the inter - story displacement will decrease as to fulfill the ductility request to avoid the large base becoming weak story, but meanwhile, the upper story will turn into weak story, thus the coefficient r s should be within 2. 0 ~ 3. 0

    採用振型分解反應譜法計算結構內力時應根據振型參與系數選擇振型避免漏選;大底盤多塔結構連接各塔的裙房屋應做得大些,以保證底部裙房與上部塔共同振動,但也不能過剛;大底盤多塔結構底盤承載力的加強將使底盤層剪力增大、層間變形減小,但易於滿足延性要求,在一定程上可避免底盤成為薄弱層。但底部加強會導致薄弱層的上移,因此採取提底盤承載力的措施的效果是有限的,承載力系數s宜取為2 . 0 3 . 0之間。
  5. The exhibition space was a far cry from any standard museum gallery, no matter in ceiling height, area, visitors circulation or climatology. at the same time, the old barrack building, even after refurbishment and installation of air conditioning, fell short of the proper environment required for museum storage. we had to double our effort in putting up exhibitions and managing the collection

    現在回想起來真有點匪夷所思:展廳不論在積、人流控制、氣溫濕等等,都不符合博物館的標準;而舊兵房雖經修葺翻新及加上空調,但和理想的藏品庫仍然相差甚遠,同事們要多花不少精力才能辦好展覽和照顧藏品。
  6. Elastic theory and plastic theory are adopted in the analysis of the two section composite beam. elastic theory suggests, on the condition of the same steel beam section size, the composite beam for the floorslab is suited lower flanges convertion section stiffness cuts down by 75. 1 %, elastic limit bending resistant capability cuts down by 47. 9 %, than the composite beam for the floorslab is suited on the top flange. it s conversion section stiffness is lifted 8. 0 %, elastic limit bending resistant capability is lifted 0. 20 %, than the steel beam

    彈性理論分析的結果表明,在鋼梁截大小相同的條件下,板位於鋼梁下翼緣的組合梁和板位於鋼樑上翼緣的組合梁相比,其換算截降低75 . 1 ,梁的彈性極限抗彎承載力降低47 . 9 ,板位於鋼梁下翼緣的組合梁和純鋼梁相比,其換算截8 . 0 ,梁的彈性極限抗彎承載力提0 . 2 。
  7. The research object in this text is the actual project - - the mansion of yatingyuan ( 40 layers above the ground, 125. 4 meter high ). the structure - design is by satwe and the analysis of the structure dynamic characteristic and earthquake response by sap2000, whose calculation models are set up according to the actual size of the structure. in satwe, the analysis model of beam and column is simulated by frame - element, slab is plane - element, shear - wall is wall - element and slab is infinitely rigid in the internal and zero in the external ; in sap2000, beam and column is frame - element, slab and shear - wall is shell - element and slab is elastic floor

    本文以實際工程項目? ?雅庭園商業中心大廈(地以上40層,建築總為125 . 4米)為研究對象,結構設計採用satwe ,結構的動力特性和地震反應分析採用sap2000 。結構satwe和sap2000分析的計算模型均按結構的實際尺寸建立, satwe分析模型的樑柱採用桿元模擬,板用薄壁殼元模擬和剪力墻用墻元模擬,板平內無限剛、平外剛為零; sap2000分析模型的樑柱採用桿元模擬,板和剪力墻用殼元模擬,板為彈性板。
  8. The exact height is being kept a secret, partly for fear of rival bids to be the tallest free - standing building, and because by 2008 it might be technologically possible to go even higher

    的確切目前仍然保密,一方是因為投資方擔心競爭對手將這個「最獨立建築物」的名頭搶走,另外,修築更層的技術也許到了2008年就已成熟。
  9. The project of general hospital has construction area of 21054 square metre, there are 1 store under the ground and 12 stores above, the engineering is the frame structure with 49 meters high. this project honor the state construction engeneering lu ban award

    總醫院門診工程:建築積21054平方米,框架結構,地下1層,地上12層,建築物總49米,地下6米,本工程榮獲國家建築工程魯班獎
  10. The inclusion of reinforced beams in a reinforced concrete floor adds to its strength and loading capacity. this system is very often used in factory and warehouse floors

    含有加勁梁的鋼筋混凝土可以提及其承載力。這種體系常用來建造廠房和倉庫的
  11. Jiaxing crane - releasing garden 1 # 2 # 3 # 7 # building and underground garage. total construction area is 31200 sqms. 20 - floor high framework building. construction height is 69. 8 meters. jiaxing security and civilization templet construction site

    嘉興市放鶴洲花園1 # 2 # 3 # 7 #及地下車庫工程,總建築積31200平方米,為20層框剪結構層住宅,建築地69 . 8米。該工程為浙江省文明施工標準化工地。
  12. The thesis verifies the availability of ductility detailings of elements prescribed by code through comparing the actual rotation capability of both ends of columns and beams obtained from inelastic dynamic analysis and the maximal rotation capability which columns and beams can possess through adopting the detailings in the code

    本文通過對分析所得的梁、柱端實際塑性轉動和採用規范構造措施后的構件可能具有的轉動能力進行對比檢驗了規范構件延性構造措施的有效程;並再次確認了柱截尺寸沿收小(變截)以及當頂部層柱軸壓比小於0
  13. In the calculations of ultimate bearing capacity, the section of rc beam was divided into the elastic zone and the plastic zone based on the fire temperature field of the beam ' s section, the equivalent - floor - live - load was presented to describe the weakening of the bearing capacity of structure members in fire, the correlation expressions were established

    摘要根據梁截火災溫場,將梁截混凝土分為彈性區和塑性區2部分計算火災場梁極限承載力,並採用等效活荷載描述火災場溫對梁極限承載力的削弱,推導了相關的計算公式。
  14. The height of the landscaped deck i. e. 16 mpd would be similar to the existing star ferry car park, while the highest part of the groundscraper i. e. 50 mpd would be lower than the city hall high block

    園景行人平臺的主水平基準以上16米與現時天星碼頭停車場的相若,而"橫向型宇"最部分的主水平基準以上50米則會較大會堂座為矮。
  15. The use of white resin for the floors and epoxy applied directly onto the concrete makes the double height a perfect setting for the utility functions, all housed among objects resembling sculptures

    用於地的白色樹脂塗料和直接塗于混凝土表的環氧樹脂塗料完美的表達了兩層的實用功能,所有以內的構造都宛如雕塑。
  16. Add : no. 15 shangchi zheng street, chengdu, sichuan from the korean consulate 10 metres, 50 metres have played, from self - sufficient region square, martial pending temple, kam lane, qintai road 300 metres, du fu thatched house, qingyanggong, people park close, the civil aviation buses direct access to the airport 15 km

    -成都飯店是由上海錦江國際管理集團公司全管理的涉外旅遊星級飯店,位於中國四川成都蜀都大道東段,主共12層,地以上總為54 . 8米,緊鄰成都藝術中心,環境優美,位置適中,設施全,交通方便。
  17. Mega - frame is composed of mega - frame which is the main structure and floor - frame which is the minor. mega - frame has characteristics of great rigidity, superior property as a whole, clear - cut transmitting mechanism, flexible using space, economical building materials, low prices and high speed of construction and so on. because of its efficiency, flexibility and economization, mega - frame has become one of the most promising structure systems for tall buildings

    巨型框架結構由作為主結構的巨型框架和作為次結構的框架構成,它具有側向剛大,整體性能好,傳力明確,使用空間靈活,節約材料,降低造價,施工速快等特點,是一種集效性、靈活性和經濟性為一體的新型層建築結構體系,因而成為適合建造層與超層建築的最有前途的結構形式之一。
  18. In addition, different modes of vertical planting at different levels will be adopted with careful selection of species to promote a theme and identity for individual locations

    此外,政府會採取多類別的垂直栽種模式,例如在宇表栽種,或在不同的栽種;並會細心挑選栽種的品種,以配合栽種地點周圍的環境。
  19. Jiaxing yunzhou garden building 5 #, 6 #, 13 # buildings. total construction area is 30215. 61m2. the work is high framework building with 13 - floor. construction height is 48. 8 meters. zhejiang security and civiliazation templet construction site

    嘉興市雲洲苑5 # 、 6 # 、 13 #,總建築積30215 . 61平方米,為13層框剪結構住宅,建築地為48 . 8米,該工程為浙江省安全文明施工標化工地。
  20. What are the major land uses on criii ? a19. major land uses on criii include a wide waterfront promenade, the new star ferry piers and public piers, a " comprehensive development area " site for low to medium rise commercial development with pedestrian landscaped deck, a " government, institutional or community " site, some waterfront related commercial and leisure uses and key transport infrastructure including road p2 at grade, cwb underground, airport railway extended overrun tunnel and nil underground

    中區填海第三期工程所得土地的主要用途,包括寬闊的海濱長廊新的天星碼頭及公眾碼頭"綜合發展區"內的中低商業宇及園景行人平臺"政府機構或社區"用地與海傍有關的商業及休憩用地以及主要運輸基建設施包括p2道路網地中環灣仔繞道地下機場鐵路掉車隧道的延部份及地鐵港島北線地下。
分享友人