標樁線 的英文怎麼說

中文拼音 [biāozhuāngxiàn]
標樁線 英文
stake line
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  1. If the fruits field is large or hilly, run a stake line across the center or divide the field and stake separately.

    假如果園面積很大或是起伏的山坡地,可貫通果園中心立一行測,或將土地分開並分別立
  2. The technician keys the line to the physical first - down marker that game officials stake at the sideline for each series of downs

    球場工作人員會為每一次的首攻在邊,技術人員便依此鍵入黃資料,記錄實際的首攻記。
  3. Fixed railway equipment. material for telecommunication and signalling overhead lines. caps for posts and small pillars

    鐵路固定設備.通信和信號裝置架空路器材.立柱和用罩
  4. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    通過室內試驗及原位測試指進行理論計算與現場實測值的對比,筆者引入了施工工藝修正系數k _ ( c1 )和k _ ( c2 )及深度修正系數,使理論計算值與現場實測值具有良好的一致性,進而通過變形協調理論對荷載?沉降曲進行數值計算,並用不同施工工藝的實例說明了理論計算荷載?沉降曲與實測荷載?沉降曲的擬合效果,從而達到可在不做靜載荷試驗或少做靜載荷試驗的情況下通過剪切波速和靜力觸探試驗指以及施工工藝修正系數等預測黃土地基中鉆孔灌注承載性狀,這對于工程初步設計中減少設計的盲目性具有十分重要的現實意義。
  5. Abstract : this paper proposes a method used for calculating the coordinate and the distance between the line and the inserted - pile point, with the help of combined simpson s formula, which is perfect for calculating various point - coordinates

    文摘:提出了利用適合各種型點位坐計算的復化辛甫生公式解算加點的坐和里程的方法。
分享友人