標高線 的英文怎麼說

中文拼音 [biāogāoxiàn]
標高線 英文
line of elevation
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 標高 : [測量學] elevation; level; altitude (飛行); datum mark; height mark
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況、各節段支模、澆注混凝土后的的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. Abstract : a new concept of turning line of reduction parameters and its determination method is put forward in this paper for analyzing the isopleth diagram showing the relationship between reduction degree and reduction parameters in reduction of compressed scale lump containing carbon, and the method of optimal selection for reduction parameters is obtained

    文摘:應用文章提出的還原參數界概念及其確定方法對鐵鱗配焦壓塊還原過程中反映還原參數與還原指關系的等圖進行分析,得出還原參數優化選擇的具體方法。
  3. G ) the convertion of si 1126 data into ktva input data file : ktva ' s values, definition, unit and format are tested many times. h ) the result of simulation computation is visualized and analyzed, i ) the study on sll 126 parameters ; by altering the ajustment data, their performance changes are studied

    本文首次應用kiva模擬平臺,對s11126柴油機進行了模擬;通過主要參數(噴油量、轉速、噴嘴安裝度等)的改變,分別計算出多項主要性能指和圖形,並對其進行分析,從而總結出以上參數的改變對性能的影響,驗證了kiva模擬平臺的強大功能。
  4. Resurvey the column axis and elevation line, and mark out the column form line, 1 : 2 cement mortar will be used to leveling at the column bottom. “ 井 ” shape rack will be set around each column, and mark elevation control line on it

    將柱軸標高線復測投點,彈出柱支模,將柱腳支模處用1 : 2水泥砂漿找平,每根柱周圍搭設井字架,在井字架上抄測控制
  5. The thesis built the relation between containing water and the properties of trail dam ' s soil by geomechanical properties of trail dam ' s soil ; analysed the seep rule of water in the trail dam ' s field and the change of soakage line. the thesis applied the limited element to analyze the trail dam of baogang by the engineering item in production. it calculates the dynamic and static response about the dam using the numerical simulation method

    本文通過大量的尾礦土物理力學性質試驗資料,建立了含水量與尾礦土性質之間關系曲;分析了水在尾礦壩區的滲流規律和不同時浸潤的變化情況,為分析尾礦壩的穩定性提供依據;結合生產上的工程項目,從包鋼尾礦壩的穩定性研究入手,應用有限元法,通過數值模擬分析了水對尾礦壩的靜力、動力穩定性影響。
  6. Compared grid routing and gridless routing, an efficient and fast gridless line - search routing algorithm - target - oriented line search routing method for automatic circuit layout - is proposed

    通過比較有網格自動布和無網格自動布的優缺點,本文確定採用一種效快速的無網格探索布演算法?朝向目探索法。
  7. Test conditions for numerically controlled turning machines and turning centres - evaluation of contouring performance in the coordinate planes

    數控立式車床和轉向中心的試驗條件.坐平面上等特性評價
  8. Standard guide for use of coal combustion products for surface mine reclamation : re - contouring and highwall reclamation

    表面礦山改造用煤燃燒產品的使用準指南:重新沿等修築和改造
  9. Asymptotic behavior of higher - order nonlinear equations on time scales

    階時性動力方程的漸近性
  10. 415 what is the installation elevation of this pipeline

    這條管的安裝是多少?
  11. All deck elevations are on the top of structural beams

    所有甲板標高線均指結構梁頂
  12. According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler, increasing amount of cable tension during casting concrete was computed, and under every key operating condition of casting concrete, traveler ' s frontend elevations were educed. we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method, which assured that the bridge ' s construction went on successfully. and then, it was discussed how to simulate the effect of prestressing force in spatial analysis

    根據掛籃前端牽索錨固點處的變形協調條件建立了掛籃上混凝土澆築過程中牽索索力的增加量,並推導了掛籃上混凝土澆築過程中的各主要工況下掛籃前端的計算公式,對文暉大橋掛籃上混凝土澆築過程中的牽索索力和掛籃前端進行了細致地控制,確保了混凝土澆築的順利進行,為整個主梁形和索力的雙控打下了良好的基礎。
  13. This is the second bifurcation of the rotor, leading to low frequency movement at about 1 / 6 rotary speed. ( 3 ) in the third part of the paper, we focus on how to establish a rotor model with multi. span and multi. disk including main linear and nonlinear stimulations on the rotors system. the rules for establishing this kind of rotors model are put forward at the beginning of this part

    ( 3 )提出了轉子大系統的理論建模準則,考慮非性油膜力、聯軸節剛度及等因素的影響,建立了一個16dof兩跨四盤四支撐不平衡彈性轉子模型,並提出了大型汽輪發電機組全軸系的48dof理論模型,建立了考慮陀螺效應時的復數形式的非性動力學模型。
  14. The fractal dimensions of elevation isolines in 6 studying sections from 3 different types of geomorphological zones, including high mountain, low - moderate mountain and catchment basin, are computed by using successive coarsening method. the results show that all the studied isolines are statistical fractals, and the fractal dimensions take on different characters for different geomorphological types and scale ranges

    在0 . 1 - 10km度范圍內,等分維值總體表現為最新隆起區(中低山區) >強烈隆起區(山區)沉積凹陷區(盆地區) ;在5 - 200km度范圍內則表現出強烈隆起區最新隆起區沉積凹陷區。
  15. Meanwhile, we built models of data collection, soeciai point ' s altitude handling, grid point ' s altitude handling, designed a method which can rapidly collect and process terrain data by descripting the contour line with mouse, and designed corresponding software by c + + builder5. 0. therefore, military digital maps can be facilitly and quickly made and computer - aided terrain analysis can be realized, thus the system can effectively help the commanders or staffs make their decision

    同時建立了數據採集、特殊點程處理、網路交點程處理等模型,設計了一種可通過鼠器描繪等而實現地形數據的快速採集、處理和賦值的方法,運用c + + builder5 . 0設計了相應的軟體,能夠方便、快捷地生成數字化軍用地圖並進行計算機輔助分析地形,從而能夠有效地幫助指揮員或者參謀人員進行決策。
  16. This dissertation is focused on the study of adaptive digital beam forming ( dbf ), two - dim spectrum estimation and the determination of the highness of the object. main work include : 1 a method of adaptive dbf in received antenna array

    本文圍繞著自適應接收波束形成、時-空二維譜估計和對目度判定等方面進行研究,主要研究工作包括以下幾個方面: 1討論了在接收陣列天中,自適應數字波束形成( dbf )的方法,引入了采樣梯度矩陣演算法。
  17. Subsequently, the communication of wireless is introduced as well as the key points of receiver ’ s rf front end. then, the design methods of receiver with high linearity and high dynamic range are recommended too. also, the blue print of the receiver, the achievement of function guide line and the problems in real debugging are discussed in detail

    本文先介紹了當代無電導航的狀況以及發展趨勢和無電的傳播,然後對接收機射頻前端的關鍵技術指進行了深入分析,還介紹了系統在大動態范圍,性實現的一些設計方法,之後詳述了本項目採用的方案、具體功能指的實現以及在設計與實現中應該注意的問題,最後給出系統的測試結果。
  18. Based on polymerization reaction of the nylon - 6 rubberized cord fabric production of distributed control system in yangzhou organic chemical plant computer integrated manufacturing system ( yh - cims / dcs ), the multiple stepwise regression method was used to build the statistic mathematical models of the molecule weight and the monomer quantum of casting slice belt. then the optimization model of polymerization reaction was presented, which was solved by using simulation annealing algorithm to obtain the best techniques parameters. the improved hybrid genetic algorithm and back propagation algorithm are combined to train neural network, brought out the neural network prediction model of casting slice belt ' s average molecule weight to guide the technologist on - line

    提出了流程工業生產過程操作優化策略和應用實施方法,包括生產過程離優化策略、非性問題求解策略、在優化模型及學習策略;結合揚州有機化工廠計算機集成製造系統集散控制系統( yh - cims dcs )的實施,針對錦綸? 6浸膠南京理工大學博士學位論文摘要簾于布生產中己內酚胺聚合反應過程優化控制這一工程實際問題,採用統計建模方法,建立了聚合反應過程的優化模型;為求解所得的優化模型,提出了種改進的有約束條件下的模擬退火演算法,該演算法能避免陷於局部最優解,有效地提了所求解的全局性和可靠性:提出了基於改進的ga演算法和sp演算法相結合的混合學習演算法,建立了基於神經網路的聚合反應過程生產目預測模型,該演算法和模型滿足了生產中的實時性和實用性要求。
  19. Another hidden danger is the weakening of the impervious ability of the dam resulting from the closeness of the height of line seepage of the reservoir water level to the contact plane between the residual solum, talus solum and basement rocks

    水庫水位浸潤和殘坡積土與基巖接觸界面較接近,而使此程的防滲能力更加薄弱,這也是此壩體的隱患之一。
  20. The intersection design is very important. but in the vertical design, the designer could n ' t use the form of contour lines to express accurately his design intension. he could only write few elevations of the pavement board corners because of the complexity in design progress and the bother in calculation

    平交口立面設計,由於其設計過程復雜和計算麻煩,設計者很難以等等形式來準確地表達設計意圖,只能是稀疏地手工計算注若干程式控制制點,設計成果對施工的指導及約束作用遠不能滿足要求。
分享友人