模板拉桿 的英文怎麼說
中文拼音 [móbǎnlāgǎn]
模板拉桿
英文
form tie- 模 : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
- 板 : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
- 拉 : 拉構詞成分。
- 桿 : 桿名詞(桿子) pole; staff
- 模板 : [土] formwork; mould; shuttering; follow board; form board; match board; match plate; mother plat...
- 拉桿 : bar; straining beam; drawbar; dog iron; stake pole; queen bolt; tie rod; pull rod; drag link; ten...
-
The static analysis of the long span plate - truss composite cable - stayed bridges. first, the cr formation on the geometric non - linear structural analysis is introduced. next, the structural discretization of cable - stayed bridge, the stiffness matrix the formation of nodal force and the simulated construction system are introduced
首先介紹了本文採用的桿系結構幾何非線性問題的分析方法? cr列式法,其次介紹了板桁結合斜拉橋的結構離散及桿單元、梁單元的剛度矩陣以及節點力的形成方法,然後介紹了斜拉橋施工模擬體系的形成。Firstly, for the system of moulding board and support frame in construction the side pressure and screws are analyzed. the material and structure form of support frame are discussed. the design of support frame uses the method of limited state, and also it analyses the integer stability, part stability, and single stability, and then proposes the load analysis of multi - level support frame
首先,針對轉換層梁模體系及支撐架施工,重點分析了轉換層結構現澆混凝土對模板側壓力值及模板對拉螺桿的計算;討論了轉換層支撐體系的形式及構造,詳細論述了基於極限狀態設計的支撐架計算方法,包括縱橫向水平桿的強度驗算、立桿的整體穩定性、局部穩定性、單肢桿件穩定性等驗算,並提出了多層支撐架的施工荷載計算方法。The model considers the torsional deformation of transmission axes, bending and longitudinal deformation of links, geometrical nonlinearity of guiding leaf springs, and the elastic nonlinearity of balance springs
該模型考慮了傳動軸的扭轉變形,連桿和導向板彈簧的彎曲和拉伸變形,導向板彈簧的幾何非線性及平衡彈簧的非線性等因素的影響。During construction procedure, the stressing of diaphragm beams " tendons and the tensioning of cables interact, the contacting nonlinear issues between girder and form plate etc, which require detailed analysis, arrange the orders and quantities of the stressing of the cables and tendons properly, and guide the construction. the paper, by making plane model and spacial model of yongan bridge, calculated the pre - closure cable forces ( aim forces ) with plane element program, with the help of applied structure analysis program - ansys, acquired the reasonable construction steps of tensioning of tendons and cables
本論文採用自編平面桿系施工裝配計算程序和大型結構分析程序- ansys ,通過分別建立該橋的平面和空間模型(含模板的作用模擬) ,由平面桿系程序倒拆出斜拉索合攏前的索力(目標索力) ,利用ansys結構分析程序,經過多次的施工過程模擬計算之後得出達到目標索力的合理的施工步驟。分享友人