橋梁靜載試驗 的英文怎麼說
中文拼音 [qiáoliángjìngzǎishìyàn]
橋梁靜載試驗
英文
bridge static loading test- 橋 : 名詞1. (橋梁) bridge 2. (姓氏) a surname
- 梁 : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
- 靜 : Ⅰ形容詞1. (安定不動; 平靜) still; calm; motionless 2. (沒有聲響; 清靜) silent; quiet Ⅱ名詞(姓氏) a surname
- 載 : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
- 試 : 名詞(古代占卜用的器具) astrolabe
- 驗 : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
- 橋梁 : bridge; approach
- 試驗 : trial; experiment; test
-
Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation
本文針對滇西山區大直徑灌注樁豎向承載力確定存在的問題,進行了5根試樁的靜載荷試驗,分析了區域地質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;地下水對樁承載力的影響程度;各種外部因素影響下,樁的施工工藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。The basic theory and step of whole process analysis of reinforced concrete beam section flexural rigidity is stated, the realization program is worked out and the academic example is analyzed. 4. based on the static - state load test result of two practical projects, the application of the reinforced concrete beam system bridge structure disease examination and structure damage evaluation method is stated, and satisfaction result is gained
1 、綜述了當前混凝土橋梁結構檢測及損傷識別的各種方法體系,並簡要評價了各方法體系的應用與不足; 2 、論述了基於靜載試驗的梁分段剛度系統識別的基本原理,編制了實現程序,並進行了數值算例分析,提出基於本原理的梁橋結構損傷識別與結構評價方法體系; 3 、闡述了鋼筋混凝土梁截面抗彎剛度全過程分析的基本原理和方法步驟,編制了實現程序,並進行了相關算例分析; 4 、結合兩片工程實例梁的靜載試驗,詳述了梁橋結構損傷識別與結構評價方法的應用過程,得到了預期的效果。In this paper , static load experiments are illustrated and the reliability of cfrp reinforcement technology , used for reinforcing beam slab structure of large span bridge , is discussed
文章結合對大跨度橋梁的梁板結構加固處理前後的靜載試驗,探討了大跨度梁板結構應用粘貼碳纖維加固處理技術的可靠性。Static test research of long - span continuous box - girder bridges
大跨徑連續箱型梁橋靜載試驗研究Confirming bridge static load test disposal with beam3 element inodel
3單元建模確定橋梁靜載試驗布載的研究Analysis system for bridge test ( qljc in chinese ) is an application software specially designed for bridge test to build spatial fem model of bridge structure with beam elements or solid elements, analyze the static and dynamic character of bridge structures, calculate efficiency ratio of load test, pick up the results of observation points and so on
摘要橋梁結構檢測分析系統qljc是針對橋梁檢測試驗分析開發的專用軟體,能夠建立橋梁結構空間有限元模型,運用實體單元法和空間梁格法進行靜動力試驗分析、試驗荷載效率計算,查取測點位置理論計算值等。Post - tensioned pre - cast concrete simple - supported girder for railway bridge pro - stress
預應力混凝土鐵路橋簡支梁靜載彎曲試驗方法及評定標準Dynamic and static tests are needed in order that the construction characteristics and forced conditions must qualify for the requirement of designing standard and safe run, at the same time, the test can give a reference of the bridge designing
檢驗橋梁結構特性及其工作狀態是否符合設計標準和使用要求,以保證橋梁今後的安全運營,需要對已建成橋梁進行動靜載荷載試驗。通過動靜載荷載試驗為橋梁結構設計提供參考依據,是橋梁建設中必不可少的一個重要環節。The paper sums up the construction technique of qinjiatuo super bridge in all : consolidating the soft ground foundation with vibrating & impacting macadam piles ; constructing the bored cast - in - place piles under the complex geological condition ; developing and researching cable - stayed handling basket with the bearing capacity of 3000kn ; beam construction ; construction technique of the new type bridge deck and dynamic & static load test
本文全面總結了覃家沱特大橋施工技術:振沖碎石樁加固軟弱地基、復雜地質情況下鉆孔樁施工、承載力3000kn斜拉式掛籃開發與研製、梁部施工、新型橋面鋪裝層施工技術及動靜載試驗。In this thesis, precasting and erection techniques and static load test of 40m ppc box girder of wuhu yangtze river bridge are introduced systematically. also, the designation and manufacture method of a new style bridge girder erection machine is presented
本文較為系統地介紹了蕪湖長江大橋鐵路引橋40m部分預應力混凝土箱梁的預制工藝、靜載試驗及架設工藝,同時也介紹了一種新型架橋機的研製。Experimental studv of pile - soil load transfer behavior of self - balanced pile
橋梁大噸位樁基新靜載試驗方法的工程應用The girder of the south bridge of changchun city highway was strengthed and tested for statical load owing to defects found in the beams
摘要長春環城高速公路南段橋主梁在施工時發生梁體缺陷,加固補強后對其進行靜載試驗。The project is completed in the collaboration of the transportation college of jilin university and transportation science institute in jilin province. the paper mainly studies the characteristics and mechanical performance of small size member of bridge, the problems of concrete dense degree and shear lag effect of wide flange. the static load test and supersonic nondestructive test of four pieces of prestressed i - girder with varying section are carried out in bridge structure laboratory of jilin university
本文針對橋梁構件局部尺寸較小部位的混凝土密實度問題,進行了2片腹板寬度為14cm , 2片腹板寬度為16cm的變截面預應力工字梁的靜載試驗和超聲無損檢測試驗,提出密實度系數的概念,對試驗梁的密實度進行定量評定,推導了工字梁的塑性系數公式,基於塑性理論給出了試驗梁的開裂荷載和極限承載能力計算公式,分析了試驗梁的密實度對其開裂荷載和極限承載能力的影響。分享友人