的英文怎麼說

中文拼音 [qiáo]
英文
名詞1. (橋梁) bridge 2. (姓氏) a surname
  1. The all-welded, a-frame pylon straddles the deck.

    全焊接的A形框架式的塔柱與面叉開。
  2. The sense of responsibility, a sudden abruption after four days ' deep attachment in bridges moves your readers deeply

    丹飛: 《廊遺夢》里體驗出來的責任、四天纏綿之後從此淵別,深深打動了你的讀者。
  3. An area behind the west abutment was utilized as the assembly shop.

    西臺后的一塊場地用作拼裝工場。
  4. Stone bridges consist of pillars, abutments and arches made up of stones held together by mortar.

    由灰漿結合在一起的石頭墩子、臺和拱組成。
  5. Discussion on reasonable structure pattern of u - shaped abutment

    臺構造型式探討
  6. Application of slant let rigid - framed bridge without abutment

    臺斜腳剛架的應用
  7. Control of gravity abutment temperature crevice

    重力式臺溫度裂縫控制
  8. Abutment design passenger dedicated railway line

    客運專線鐵路臺設計
  9. Abutment deformation analysis and foundation treatment

    某大臺變形原因分析及其地基處理
  10. It is required to construct an access bridge over a motorway.

    要求跨過公路建造一座跨線
  11. At anaphase the dicentric chromatid will form a bridge and the acentric a fragment, both of which can be scored.

    在後期雙著綠點染色體將形成一個,無著綠點染色體單體形成一斷片,此兩者均可記錄下來。
  12. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉的發展及其施工工藝,並指出了梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  13. Thus, the complement system act as a link between innate and acquired immunity

    因此,補體是連接機體天然免疫和獲得性免疫( adaptiveimmunity )的「梁」 。
  14. It has been demonstrated that complement activating and cr2 cross - linking on b lymphocytes set up a bridge between innate and acquired immunity. the interaction of c3 and cd21 on b lymphocytes will benefit initiating immune response and regulating primary antibody response. cd21 / cd35 is important in the process of antibody avidity maturing, this is critical to b lymphocyte activation especially in the state of low antigen concentration

    現己證實補體的活化以及b細胞表面crz的交聯在先天和獲得性免疫之間架起了重要的梁,表現為c3與b細胞cdzi的相互作用有利於啟動抗體應答反應,並對初級抗體應答反應有調節作用: cdzi cd35對于抗體的親和性成熟具有重要作用,在抗原濃度低的情況下,對于活化b細胞是至關重要的,而且mlgm (交聯有利於特異的低親和性b細胞對t細胞依賴性抗原和t細胞非依賴性抗原產生免疫應答。
  15. 1 dental acrylic resins for crown and bridge amendment 1

    牙冠和牙用牙科丙烯酸類樹脂
  16. Joey becomes adept at bridge.

    喬艾打牌的門道也精起來了。
  17. It represents russell's first revolt against the hegelism philosophy, of which he was an adherent in his early days at cambridge.

    它說明了羅素對他在劍初期追隨的黑格爾哲學的第一次反叛。
  18. Apply with chemical combination technology. it form nonadhesive film. which can ' t adhibit dust easily. and pollution is easy to clearly to chalk

    應用化合架技術形成非粘著性塗膜,不易粘上灰塵。對粉筆、蠟筆等所沾上的污漬也特容易清洗。
  19. " i purchased this book on recommendation from a fellow adoptive parent

    如此他們放置蘇麗在一梁的旁邊。
  20. A feature of the bridge is its specially designed aerofoil shaped deck

    青馬大的其中一項設計特式是其翼式面。
分享友人