機械化施工 的英文怎麼說

中文拼音 [xièhuàshīgōng]
機械化施工 英文
mechanized construction
  • : machineengine
  • : 名詞1. (器械) tool; instrument 2. (武器) weapon 3. [書面語] (枷和鐐銬之類的刑具) fetters, shackles, etc
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 機械化 : mechanize
  • 機械 : 1. (利用力學原理組成的各種裝置) machinery; machine; mechanism 2. (死板; 刻板) mechanical; inflexible; rigid
  • 施工 : be in the process of construction; be under construction; build; construction
  1. The structure and the construction method of a new type of fascine are introduced herein, of which the advantages are as the follows. ( 1 ) the shortages of the complicated construction process and low construction progress with low efficiency are overcome. ( 2 ) the fascine cage can be industrially made, so as to reduce the working procedure in site. ( 3 ) the heavy construction equipments can be used for the mechanical construction of the single large size fascine cage with high construction speed and intensity. ( 4 ) it is favorable to the environment protection as the amount of the fascine material being decreased

    摘要介紹了新型埽籠埽的結構形式、方法,其優點為: ( 1 )克服傳統埽序復雜、速度慢、效率低的缺點; ( 2 )籠埽可生產,減少現場作業序和作業面后移; ( 3 )充分利用大型進行大體積單個籠埽結合機械化施工,作埽速度快、強度高; ( 4 )減少柳料用量,利於環境保護。
  2. Abstract : this paper analyzes causal factors of flood in the middle reaches of changjiang river. due to neglection of environmental management, soil erosion in the upper and middle reaches of the changjiag river, lake sedimentation, large - scale reclamation of marshes, the flood regulation capacity of the lake was descended, and flood stage was risen and prolonged. consequently more and more river levees and lake dikes were reinforced almost every year to prevent the disasters, which made flood level go up and flood period last for more days. the frequency of flood and waterlogging disasters rose and their damage was enlarged. several proposals for flood prevention including agricultural modernization are put forward

    文摘: 1998年長江大洪水后開始實的「平垸行洪,退田還湖」的土地利用調整方案,從長遠來說應尋求農業安全且收入逐漸提高條件下的土地利用,長江中游地區應積極推進農業現代,提高農業勞動生產率,轉移,減少分蓄洪區的人口,移民建鎮,對區內的土地要促進其規模經營,由優秀的有文的農民經營,平時只有少量的直接從事農業生產的經營管理人員,農忙時則大量地使用季節性合同或實現,大洪水時退田還湖,減輕長江幹流大洪水的壓力,減少分洪與特大洪災時的損失,這樣還可促進避洪、冬季農業等的發展,也有利於長江中上游地區陡坡耕地的退耕還林,還可在糧食充足時進行休耕,在旱災、糧食緊張時擴大糧食生產?
  3. Construction quality control of cement stabilized macadam base

    水泥穩定碎石基層的機械化施工
  4. As the commonly used foundations in the bridge engineering, large - diameter bored piles have many advantages, such as high bearing capacity, good stability, little and homogeneous vertical settlement, facility for mechanician construction and good applicability

    樁基礎是一種常用的橋梁基礎型式,具有承載力高、穩定性好、沉降量小而均勻、便於機械化施工及適用性強等特點。
  5. Asphalt road mechanization construction of yexin speedway

    葉信高速公路瀝青路面機械化施工
  6. Cement stabilized macadam subbase mechanized construction and technical points

    淺談水泥穩定碎石基層機械化施工及技術要點
  7. Road machinery construction mechanization

    築路
  8. This paper deeply analyzed the principal safety accidents and itsreasons which are prone to happen at high - mechanized construction sites. the proposals on management of construction machine safety are presented based on the projects construction stages as follows : the beginning of construction, during the construction and after completion of the constraction

    文章具體分析了建設程度較高的現場最容易潛伏發生的主要安全事故及其原因,參照有關機械化施工方法和建設的管理方式,提出在建設任務開始時、期間、任務完成後如何做好建設的安全管理的建議。
  9. Construction mechanization of qingdao bank of china building

    青島中銀大廈機械化施工
  10. Construction mechanization technique of the oriental plaza project

    東方廣場機械化施工技術
  11. Quality control of the base construction of cement stabilized macadam road

    水泥穩定碎石基層機械化施工方法探討
  12. Mechanized construction of asphalt concrete core of maopingxi earth - rockfill dam

    茅坪溪土石壩瀝青混凝土心墻機械化施工
  13. On construction scheme decision - making of mechanized operation on roadbed in the northwest of china

    西北部路基機械化施工方案的決策研究
  14. July 2005, zheng zhou chuan dao engineering construction co., ltd started to place advertisement in our website

    2005年7月,鄭州川島機械化施工有限公司開始在本網投放網路廣告宣傳。
  15. Furthermore according to the previous construction experience, the existence of auxiliary core limits the use of effective mechanized construction on asphalt concrete and effects the project progress

    另外通過對以往程的經驗,由於副墻的存在制約了瀝青混凝土採用高效的機械化施工條件,影響了程的進度。
  16. Abstract : according to working characteristics of the mechanical construction system of cement concrete pavement, this paper presents the mathematical model of this system by applying the theory of stochastic service system to describe the motion law of the mechanical construction system

    文摘:根據高等級公路水泥砼路面機械化施工藝,利用隨服務系統理論,提出了水泥砼路面機械化施工系統的數學模型,動態地描述了水泥砼路面機械化施工系統運行的一般規律
  17. This article recommends three kinds of criterion on judging whether the hydropower construction design or optimizing is reasonable, that is " schedule, quality and cost ", it describes mathematics mode and optimizing of concrete mechanization construction system and provides a new method of " combined management of schedule, quality and cost ", and founds the relations of distribute quotiety of the working procedure unit, quality unit, and cost. in the field of management, it indicates the localization of parlance " consumer is the god ", and advances the relations of previous and descend working procedure are the relations between consumer and user. their relations are new relations of serve mutually and create con dition for each other ' s

    本文介紹了評價水電系統設計或優合理與否的三種標準為進度、質量和成本,描述了大壩砼機械化施工系統的數學模型及優,提出了「進度、質量、成本聯合管理」的新方法,建立了序單元、質量單元和成本費用之間的分配系數關系,在管理方面,指出「用戶就是上帝」這種說法的局限性,提出了上道序和下道序之間的關系為顧客和用戶之間的關系,它們是互為對方服務,互為對方創造條件的新型關系的觀點和方法。
  18. Tube - making, powder - loading, preparation of wooden or bamboo sticks and plastic ancillary devices are all mechanized and the management of working staff has been computerized on the whole

    基礎設齊全,扯筒、壓藥、竹木扦桿、塑料附件等生產全部、員管理實現電腦
  19. Integrate with construction building and design, municipal and governmental building, steel structure, installation of water, power, heating and rest room, premaking parts, hoist, decoration, fitting and making of aluminum alloy with comprehensive service. the company has power machinery equipment to build

    公司集建築、設計、市政、鋼結構、水電暖衛、裝飾裝修、鋁合金製作安裝等為一體,實行一條龍服務,公司設備力量雄厚,擁有與之配套的各種機械化施工設備。
  20. Rock - fill dam is the one chief type of soil - rock dam, there are much virtue of safety function, adaptability used the local material, be benefit to mechanical building, be short in building time and low in cost, being simple in the building during closure and diversion, etc. it suit the condition of our nation and the environment where the water conservancy works and hydroelectric power plant located, we accumulate the ample practical experience and a series of achievement in scientific research and become a model of having ample competition in the construction and development of piled rock clam

    堆石壩是土石壩的主要壩型之一,它具有適應性強,就地取材,便於機械化施工期短,造價較低等優點,在水利樞紐設計中被廣泛應用,而且已經積累了豐富的實踐經驗和成套的科研試驗成果,在水利樞紐的壩型選擇中具有很強的競爭力。就堆石壩而言,根據築壩方式和築壩材料的不同,也有多種壩型。
分享友人