橫向管道 的英文怎麼說

中文拼音 [héngxiàngguǎndào]
橫向管道 英文
cross-duct
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 橫向 : broadwise; infeed; crossrange; abeam;transverse; transverse direction; cross; crosswise; lateral;...
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  1. Standard specification for storm drain resilient connectors between reinforced concrete storm sewer structures, pipes, and laterals

    加筋混凝土暴雨排水溝設施排水溝間的排水溝回彈性連接件的標準規范
  2. Standard specification for storm drain resilient connectors between reinforced concrete storm sewer structures, pipes, and laterals metric

    加筋混凝土排暴雨污水結構排水溝間的暴雨排水溝彈性連接件標準規范
  3. Based on results of a lot of practical investigations, academic researches and comparisons of situations of real estate industry in changsha with that in other cities, this paper analyzes the present situations and existing problems of changsha ' s real estate industry and points out that the competition of foreign enterprises, the low degree of openness in renting system, the inefficiency in management, the conflicts of administration and practice, the lack of legal consciousness for agent serv ices, the nonstandardization of real estate management companies and the distemperedness in supervisory systems pose the outside threats ; ill managerial system, low technical level, small scales of companies, few measures for financing and marketing, poor quality and high prices of products pose the inside problems

    本文在大量調查和理論研究的基礎上,分析了長沙市房地產業的現狀和問題,提出了長沙住宅市場需求量預測模型,並對2002年長沙住宅市場需求量進行預測,對長沙房地產業發展進行縱比較,論述了外國企業進入中國房地產市場指日可待,論述了我國目前土地出讓制度不透明,政策理手段繁雜、效率不高,規劃部門與房地產業的滯后與沖突,中介服務機構缺乏法律,物業理公司無法可依,監控體系不健全等外部環境問題;論述了我國目前房地產企業規模偏小,理體制乏力,技術力量薄弱,融資渠狹窄,產品質量不高,產品規格不齊,價格偏高,以及營銷手段落後等內部環境等問題。
  4. This paper deals with seismic analysis of an immersed tunnel using the travelling wave method the objective of the analysis is to obtain the maximum stresses in the tunnel body and the relative displacements at the joints for design purpose in analysis , the axial and transverse input waves are treated as two independent waves with different amplitudes and periods the method has been found to have the advantages of simplicity and clearness in physical concepts however , reasonableness of the prediction by the method depends largely on the input data , such as the wave amplitude , the wave length , the propergation speed of the travelling wave as well as the reaction coefficient of the ground thus , determination of the input data is discussed in detail finally , the method is applied to analysis of huangsha - fangcun immersed tunnel across the pearl river in guangzhou

    將行波法應用到剛度較大、分段較多的水下沉的地震分析中,提出把軸兩個輸入波處理為兩個獨立的行波的方法行波法是否符合實際,與輸入地震波的有關參數及地基系數選取有很大關系,作者對此進行了比較深入的討論,使輸入參數的選取簡單、明確,便於對計算結果進行分析與判斷最後應用此法對珠江水下隧的工程實例進行了計算
  5. Here the author puts forward that it should follow four principles. they are the principles of vertical authorization, horizontal combination of lines and blocks, a combination of government ' s administrative conduct and social conduct, a combination of management and service. based on these principles, we should build a structure of three administrative sub - systems, which is called the system of party and administrative leadership, the system of department execution, the system of support and supervision

    文章第四部分提出在遵循縱層層授權、條塊結合、政府行政行為與社會自主行為相結合、理與服務相結合這四條原則的基礎上,構築新型的街藝巴八碩士學住論文wmasthr 』 sthesis社區理組織,它應包括三個理子系統? ?黨政領導系統、專業執行系統、支持監督系統,分別履行制定政策、執行政策、反饋和監督政策功能。
  6. The impact tests were carried out at the mid - span, and internal pressures of ompa, 5mpa, lompa and 15mpa were used in addition to the tests with water. the critical energy of perforation and the ballistic speed was measured, and the various types of rupture were identified from the section of the test specimens. force - time curves and internal pressure - time curves were obtained from experiment

    實驗中記錄了沖擊力時程曲線和內壓時程曲線,測量了鋼和周截面的變形,得到了不同工況下的破壞模態、臨界穿透能量以及彈極限速度,並找到了臨界穿透能量隨內壓的變化規律。
  7. This paper deals with seismic response of a tunnel - soil system immersed tunnel , as an underground structure , must be compatible with the deformation of the surrounding soil thus the simplified model for a tunnel - soil system is established through two steps at the first step , an mdof system is developed for modeling the foundation soil to this end , dynamic behavior of the foundation soil is analyzed a typical section of the foundation soil simplified as a single mass - spring system on the basis of some equivalent criteria those mass are linked longitudinally by elastic springs to form an mdof system at the second step , the tunnel is treated as a beam on elastic foundation ; that is , the tunnel is connected with the soil massed to form a tunnel - soil system this model has been applied to the seismic analysis of huangsha fangcun immersed tunnel across the pearl river in guangzhou design recommendation is proposed on the basis of this analysis

    研究沉在地震條件下整體受力的分析方法分兩步建立計算模型第一步通過分析場地地基土切片的動力特性,根據等效原則將其化為等效單質點體系,然後在縱用等效彈簧連接而成為多質點體系的地基土計算模型;第二步將隧看作彈性地基梁與上述多質點體系通過等效彈簧連結而得到土隧體系的計算模型本文結合廣州黃沙芳村珠江水下隧工程實例建立了具體的計算模型並對多種不同的約束條件,進行了縱地震響應時程分析,為該隧的抗震設計提供依據
  8. ( 2 ) respectively by elastic theory analyses and methods of structural mechanics, transverse static analytical equations for flexible pipeline rigid pipeline are established whose outcomes are applied in numerical example to compare those with that by finite element method. ( 3 ) considering interaction of filled soil, pipeline and foundation, with an eye to non - linear soil model, in view of the initial geo - stress field and the effects of interface between soil and pipeline, and by finite element method the calculational model and method are built for transverse stress in pipeline. then, by the great finite element analytical software ansys, those outcomes are applied in calculation example of positive buried pipe to educe the distribution of circumjacent soil pressure and stresses on cross section and to compare it with that calculated by conventional ways before those outcomes are applied in engineering case of positive buried pipe with flexible filled materials to confirm distribution of soil pressures after the measure for reduction and to compare it with measurements. as a result, the model set up in this paper is proved to be applicable after all above - mentioned analyses

    本文基於彈性理論和有限元原理與方法,分析了上埋式地下力學計算方法和性狀並探討了上埋式地下的減荷等問題: ( 1 )在分析現有幾種典型的垂直土壓力計算方法的基礎上,探討了影響垂直土壓力的主要因素以及改進的方法; ( 2 )分別通過彈性理論分析法和結構力學的方法,建立了地下柔性圓環和剛性涵的靜力計算方程,並應用在算例中,把所得結果和有限元方法所得結果進行對比分析; ( 3 )考慮填土、和基礎的共同作用、土體的非線性特性、初始應力場以及土體和的接觸面因素的影響,利用有限元的思路,建立了地下力學有限元計算模型和方法,並且採用大型有限元分析軟體ansys ,針對上埋式工程算例,得出了周土壓力以及截面應力的分佈狀況和規律,並和理論值進行對比;針對施加柔性填料的上埋式工程實例,得出了減荷后的土壓力分佈,並和實測值進行了對比。
  9. Train operation safety management module can be transversely divided into operation, locomotive, maintenance, electricity, vehicle and vertically into stations, railway administrations, the ministry of railways

    行車安全理模塊,從上劃分為運部分、機務部分、工務部分、電務部分和車輛部分;從縱上分為站段、路局、鐵部。
  10. At the last part, the author introduces methods of employee flow management. first, hr manager should hold the pass of job application ; second, she or he should establish scientific promotion system and job rotation system to stimulate flow within enterprise ; finally, the company should try the best to retain ability employees and cut off redundant personnel. using these specific measures, the problems in state - owned enterprises will be improved

    國有企業人力資源部門應當從企業員工招聘環節開始把關,真實評估應聘員工的職業發展潛力,作出真實職位預觀,並做好試用期理;同時應當做好員工內部流動理,採用科學的晉升制度和內部輪換制度,疏通職業通,使企業內部流動和縱流動均暢通無阻;企業還要做好員工流出理,包括員工辭職理和裁員理;除此之外,企業還要樹立正確的人才流動觀念,創造吸引人才的機制,防止人才流失。
  11. By use of grid - shaping skill and multi - grid solver, the flow - induced vibration of the fluid - conveying pipe in water is studied. the vibration mechanism of the fluid - conveying pipe in water is analyzed, the lift and drag acting on pipe in water are calculated. the results obtained are analyzed and compared to the experimental data referred to

    首先對水下輸液繞流渦激振動的機理進行了分析,然後,利用網格生成技術及多重網格法求得了輸液在不同來流條件(雷諾數)下的升力系數及縱阻力系數,最後對計算結果進行了分析,並將其與已有的間接實驗結果進行了對比。
  12. Then they made a concrete box to collect the water that bubbled forth, and built concrete pillars to support the pipes over the first, and deepest, ravine

    然後他們做一個混凝土箱來盛接上冒出的泉水,並且建造混凝土柱來支撐水,讓它們跨第一、也是最深的一深谷。
  13. By analysis the results of in - situ monitoring in the process of pipe jacking, the law of surface deformation perpendicular to pipe axis and along pipe axis, the sub - surface movements perpendicular to the axis of pipe and along the axis of pipe are studied

    通過對頂工程現場測試數據的分析,研究了頂施工引起的周圍土體的移動規律,包括地面截面和縱截面變形規律、深層土體沿軸線方和垂直於壁方移動規律。
  14. Although the canal conduit capacity does not change very much than design discharge, the canal erosion due to many years scour already damaged the canal stability. therefore, taking efficient measures should protect the canal

    然而對于北部引嫩渠來說,盡大部分渠在設計流量下輸水能力並沒有什麼明顯的損失,但渠坍塌拓寬已危及堤岸的安全,應及時採取防治措施加以治理。
  15. And the conclusion is that vita method is a more reasonable method in burst detection when the threshold value is between 0. 7 to 1. 0. in order to investigate the influence of transverse curvature of the wall, the direct numerical simulated data bank of turbulent channel flow is also analyzed. the mean velocity profile in pipe and channel flow is compared

    本文還對圓和槽內的猝發事件進行了分析,得到的圓和槽內的猝發周期大致是相同的,但是在猝發的強度上槽要大於圓;並且進一步的分析表明猝發強度的差別主要在於徑速度的差別,這說明壁面曲率對于徑的流動影響較大,而對流流動幾乎沒有影響。
  16. 2 it can made horizontal, acial and angular displacement when being installed. it can t be restricted by the obstruction of pipe and the non - parallel of flange

    2安裝時可產生位移,不受不通心,法蘭不平行的限制。
  17. For the sake of exalting the safety of flight, enlarging the air traffic flow of the beijing international airport, and solving the flying conflict, the capacity of runway in beijing international airport should be increased to adjust to the development of the future. there are various factors that influence the capacity of runway, such as the movement methods of the parallel runway, the results of approach and departure procedure and the methods of air traffic control etc. the design of flight procedure is restricted by airspace

    為了提高飛行安全,增大首都機場空中流量,解決飛行矛盾,以順應未來的發展需求,首都機場跑容量必須增加,機場跑容量受多方面因素的影響,如機場平行跑的運行方式、進離場程序的優劣和空中交通制方式等,而飛行程序的設計又受到空域的限制,因此,要增加機場容量既要考慮縱因素又要考慮原因,最終目標是統一規劃北京終端區的空域,做到終端區的空域統一又協調,才能獲得最大的機場容量。
  18. Analytic results indicate that the calculation results with simple boundaries is larger than those with viscous boundaries, that it is adequate that the transverse calculation range is taken as six times of the diameter of the tunnel with simple boundaries, that it is accurate enough to analyze the transverse seismic response with planar models, that the seismic response of immersed tunnels increases with the increasement of depth and it is great in hard rock, and that the coupling of water and structures has a little influence on the seismic response of immersed tunnels

    分析結果表明,與採用粘性邊界相比採用簡單邊界計算的結果是偏大的;採用簡單邊界時計算范圍取六倍洞寬就足夠了;在對沉進行斷面地震分析時採用二維分析就行了。沉的地震反應隨著埋深的增加而增加;在硬巖中沉的地震反應要大些;水與結構的耦合對沉的地震反應影響不大。
  19. So the framework chanmical way was adapted to study the character of the pipelines ' response under trigonometric function traffic loads ; then the randomicity of the parameters were taken into account, the paper uses the perturbation theory to describe the random character about the changing parameters of the pipelines. the calculate formula and simply resolution of response character of pipelines under random loads was educed. the technique of numerical value can stimulate the complex actual situation effectively

    應用數值技術可以有效的進行實際復雜情況的模擬,因此,文中對在恆定交通荷載和簡諧荷載下的縱以及受力特性進行了數值模擬計算,主要採用比較適合於土體計算的abaq二軟體進行,同時也對其各影響因素作了相關敏感性分析。
  20. The mechanisms of flow - induced vibrations of the fluid - conveying pipes on offshore platform and in water are analyzed, the physical models and mathematical models of flows in pipes on offshore platform and in water are established, with the programs of numerical simulation, the flow of vibrating pipe, the force of flow - induced vibration in pipe on offshore platform and the lift and the drag of flow acting on the fluid - conveying pipe in water are solved, and the linear solution for equation of vibrating fluid - conveying pipe in water with the fixed supports in two ends is derived

    分析了海洋平臺及水下輸液的流體激振機理,建立了相應條件下的物理模型及數學模型,應用matlab軟體編制了計算程序,對海洋平臺輸液內流流場、所受流體激振力及水下輸液繞流受力(升力及縱阻力)分別進行了求解,並推得了兩端固支條件下水下輸液強迫振動方程的線性解。
分享友人