橫肋梁 的英文怎麼說

中文拼音 [hénglèiliáng]
橫肋梁 英文
gate beam
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : 肋構詞成分。
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  1. The main components of the latter are multi - rib sandwich panels, including floor slabs and wall slabs. reinforced concrete conformation columns are set where the longitudinal walls and latitudinal walls intersect and copulative beams are set where floor slabs and wall slabs intersect. they play a role of linking and transferring loads, bearing a small part of loads at the same time

    無骨架體系的主要承重構件是密夾芯板(包括樓板和墻板) ,縱、墻相交處設鋼筋混凝土構造(連接)柱,墻板和樓板相交處設連系(圈),連系和柱主要起連接和傳遞荷載作用,也承擔少部分荷載。
  2. The main girders support i-section transverse ribs.

    支承著工字
  3. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除拱頂面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度要求; ( 2 )從承載力方面看,在風荷載、地震作用下,拱基本滿足要求,個別排架不滿足要求,拱連系普遍不滿足要求;計入水平槽向地震作用的工況為設計控制工況。
  4. The prestressed continuous beam - arch composite bridges are a special structural system where the horizontal thrust of the arch rib is absorbed by a prestressed tie at deck level. in some cases, this type of structure is preferable because it does n ' t have the large thrust at the spring hi traditional arch bridges and the somewhat large bending moment and shear force in traditional beam bridges. as a result, the performances of the prestressing reinforcement can be efficiently utilized

    它利用拱承擔壓力,系預應力束抵抗拱端推力,吊桿及縱橋面系結構承受橋面荷載,既克服了傳統拱橋巨大的拱端推力,又改善了連續橋較大的彎矩和剪力的受力狀況,最大限度地發揮了拱混凝土和預應力鋼筋各自的特點,經濟效益顯著。
  5. What welding methods do you use in connecting the plates, frames, and beams

    在焊接鋼板,骨,甲板時,你們用什麼焊接方法?
  6. Reasons : firstly, sectional dimension is so little that torsional stiffness of single - beam is n ' t enough. secondly, protective layer thickness is too thin to protect concrete reinforced bar and reduce durability. lastly, each main beam is joined by cross girder and the more rigid of cross girder the more entirety of bridge

    局部損壞較嚴重,主要原因是主截面尺寸過小、板過于薄弱,造成單抗扭剛度不足;保護層厚度不夠導致鋼筋外露引起銹蝕,降低了橋的耐久性;各主採用連接成整體,的剛度越大,橋的整體性越好,但調查結果顯示,實際情況中並不能達到理想的整體剛度。
  7. To raise the critical stress of the web, we always lay some transverse stiffeners on the web, and also lay some longitudinal stiffeners sometime

    為了提高腹板的臨界應力,通常都設有腹板向加勁,有時還在中段加設縱向加勁
  8. At present, there are no information or specification on studying the transverse stiffener of the thinned - web beam systemically. and there are a small few literatures related on load - bearing ability and laying of the transverse stiffeners of the thinned - web beam

    目前,只有極少資料簡單介紹了薄腹板向加勁的受力及設置等問題,尚未見薄腹板向加勁的系統研究文獻。
  9. In this paper we study the transverse stiffeners of the thinned - web beam bearing several concentrated longitudinal strain actions. thinking of using post - buckling strength of web plate, we study some facts about tran sverse stiffeners including strain ability, condition of breaking, calculation of strength and stabilization of the stiffener bearing regional load action

    本文對受多個集中荷載作用的薄腹板向加勁進行了研究,分析了利用腹板屈曲后強度時,向加勁的受力狀態、破壞機理,以及加勁局部承壓的強度計算公式和穩定計算方法。
  10. Because the intervals of two side girders are relatively large in the structure of the floor, it is not even and some and out of shape that its bridge of panels must be produced at the same time horizontally and crookedly and vertically except deforming wholly, level analyse can receive the satisfied result already at this moment, is it is it accord with floor structure real work state, girder of cable - stay bridge just to analyse with whole out of shape relevant non - linear space of function while being out of shape while being above - mentioned to consider only, but about this research rarely seen to report bridge worker is it understand their receive strength characteristic in an all - round way to need badly publicly

    由於板結構中兩個邊主的間距較大,其橋面板除整體受力變形外必然同時產生向彎曲和縱向不均勻局部變形,此時平面分析已不能得到滿意的結果,只有考慮上述變形與整體變形相關作用的非線性空間分析才符合板結構主斜拉橋的實際工作狀況,但有關這方面的研究鮮見公開報道,橋工作者急需全面了解其受力特性。
  11. Therefore, it might be very essential to study the cable stayed bridge of the super breadth composite beam. additionally, the main problems of the study are as follows : 5 、 the distributing for stress of lengthways and transverse in transect ; 6 、 discussing the change of stress of lengthways and transverse, while the breadth of bridge is changing ; 7 、 in the cable stayed bridge of the super breadth composite beam, the lengthways reinforce rib and rigidity crossbeam exert influence on stress of bridge board ; 8 、 while tower and beam are concretion, main tower affects bridge board

    鑒于目前關於此類橋型研究成果不多,就此作了下列若干問題的研究: 1 、超寬疊合斜拉橋斷面上縱向應力分佈和向應力分佈特點的研究; 2 、對超寬疊合斜拉橋隨著橋寬變化時,上述兩種應力分佈變化規律進行探討; 3 、在超寬疊合斜拉橋中,縱向加勁對橋面板受力的影響;尤其是剛性在橋面板受力中所起的作用; 4 、塔固結時,主塔對橋面板的作用。
  12. Based on experience coefficient method, eccentric - pressed method and modified eccentric - pressed method, a new simplified calculation formula of the eccentric - loaded coefficients was presented according to the actual load transverse distribution on the rib

    摘要基於經驗系數法、偏心壓力法以及修正的偏心壓力法等幾種偏載系數的簡化演算法,提出了按實際向分配系數來計算偏載系數的簡化公式。
  13. After comparing between the finite - element analysis and experimental results, the author verified the fem. then according to the chinese code, the nonlinear finite model of the beam - to - column is established which are made of different size components. the responses of beam - to - column web moment connections which are made of different size components are compared and analyzed from three facets, and the conclusions about the joints behavior are drawn : thicken the connection plate, lengthen the connection plate or use a back - up stiffer can improve the connection behavior, consist of improving the behavior of load - supported and reducing the stress convergence in the flange moment plates

    本文根據我國規范的有關規定,自行建立了12個不同構件尺寸的樑柱腹板連接的三維有限元模型,對不同構件尺寸的樑柱腹板剛性連接節點在單向荷載作用下的反應進行了研究,從結構的mises應力等值線示意圖、端加載處的荷載? ?位移曲線、翼緣連接板兩端的mises等效應力以及翼緣連接板與柱相連接的三邊的mises應力等值線示意圖四方面進行了比較與分析,從而得出了不同構件尺寸的樑柱腹板剛性連接的在受力行為上的結論:增加翼緣連接板的厚度、增加翼緣連接板的長度以及採用柱的向加勁均可以改善節點的受力性能:提高節點的承載能力;減小翼緣連接板內部與柱翼緣邊的的應力不均勻現象,從而避免試件過早地發生破壞。
  14. According to the result of the internal force calculation, this paper introduces detailedly the design of tied frame prestress reinforcement, the checking calculation of section stress and intensity of arch and tied frame, also it provides some result files > arrangement drawings and main structure design drawings

    利用內力計算結果,本文還詳細介紹了系預應力配筋設計,拱和系截面應力和強度驗算及設計計算,並提供了部分計算結果文件、總體布置圖和主要結構設計圖紙。
分享友人