橫道線 的英文怎麼說

中文拼音 [héngdàoxiàn]
橫道線 英文
street crossing
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  1. The frequency curve of transverse distribution of the wheel track on divided ways reveals that the frazzled damage of highly channelizing expressway cement concrete pavement largely occurs in the peak range of distribution curve of the wheel track

    摘要分車行駛輪跡向分佈頻率曲顯示,渠化程度較高的高速公路水泥混凝土路面磨損破壞主要集中在行車輪跡峰值范圍。
  2. As a result, the horizontal alignment of the cwb cannot be shifted further southward landward

    基於上述原因,繞向定不能再向南移即向陸地方向。
  3. Bus 6, 6a, 6x, 66 or 260 from exchange square bus terminus, central ; li yuen streets east and west central mtr exit c then walkalong des voeux road central towards sheung wan ; upper lascar row, also known as " cat street " sheung wan mtr exit a2, turn right and then left along hillier street, away from the tramlines, turn right at queen s road central, cross at the first " zebra " crossing then up the steps to " cat street " ; and hollywood road one block above upper lascar row

    中環交易廣場巴士總站搭乘6 6a 6x 66或260巴士利源東西街地鐵中環站c出口,沿德輔中往上環方向走摩羅上街,又稱摩羅市集地鐵上環站a2出口轉右,然後左轉入禧利街,朝電車路相反方向走,再右轉入皇后大中,過第一斑馬后沿石階步上,還有著名的荷李活位於摩羅上街之上。
  4. Construction of a single - lane road bridge of 70 m in length across the san tin eastern main drainage channel stemdc connecting an existing unnamed road along the eastern side of stemdc near the vha and tyr

    興建長70米並跨新田東面主要排水的單行車路橋,以連接沿該主要排水東面近車輛輪候區的現有未命名路與淳裕路
  5. Get on yokohama yokosuka road at namiki ic by metropolitan bay shore route. get off at asahina exit and go to kamakura by kanazawa kaido

    從首都高速灣岸出發,走並木ic進入須賀公路,在朝比奈出口停車,經由金澤街進入鐮倉。
  6. The alignment of hk - swc starts from the new reclamation in dongjiaotou at shekou where the boundary crossing facilities are located, stretches across the ecologically highly valued deep bay waters, lands at the north - western part of the new territories at ngau hom shek. the hk - swc connects to yuen long highway via deep bay link

    深港西部通的走始於將設有口岸過境設施的蛇口東角頭新填海區,跨有高生態價值的后海灣而落點于新界西北區的鰲?石,然後經由后海灣干銜接到元朗公路。
  7. Qintai road chengdu second commercial, to treat the modern buildings as the prop, sima xiangru and the rest of the love story of the main line, where most characteristics of a total length of 920 meters, the trans rattled the han dynasty brick, and their brick with a galaxy of china published most of the han dynasty, this brick brought from 160, 000 pieces of natural qingshiling brick surfacing from the simulation such high levels of the cake

    琴臺路是成都的第二條商業街,以漢唐仿古建築群為依託,以司馬相如和卓文君的愛情故事為主,這里最富特色的是全長920餘米、貫整條街的漢畫像磚帶,其磚帶薈萃了中國目前面世的絕大部分漢畫像內容,這條磚帶由16萬塊天然青石磚鋪築而成,模擬程度之高,令人叫絕。
  8. The northern section dbl covered under this contract primarily comprises the construction of viaduct with some at grade sections and cut slopes at the northern end where the road passes through the northern extremity of the tsing shan range. it connects the hk - swc to the southern section near castle peak road

    合約項下的北段后海灣干北段主要包括建造高架路,在北端設有地面路段和削坡,路會在該處過青山嶺北端的山邊,把深港西部通與青山公路附近的南段連接起來。
  9. The system, based on 89c51, has two stages of sampling and holding circuits, which can discriminates positive - going edge and negative - going edge of signals, providing signal peak information

    如果以坐標為信號址、縱坐標為址對應的計數率,可以得到一條核輻射譜
  10. The impact tests were carried out at the mid - span, and internal pressures of ompa, 5mpa, lompa and 15mpa were used in addition to the tests with water. the critical energy of perforation and the ballistic speed was measured, and the various types of rupture were identified from the section of the test specimens. force - time curves and internal pressure - time curves were obtained from experiment

    實驗中記錄了沖擊力時程曲和內壓時程曲,測量了鋼管軸向和周向截面的變形,得到了不同工況下的破壞模態、臨界穿透能量以及彈極限速度,並找到了臨界穿透能量隨內壓的變化規律。
  11. From yokohama, take jr keihin tohokunegishi line, tokyu toyoko line, or yokohama municipal subway line and exit at sakuragi - cho station. for landmark plaza and queen s square yokohama, take the " moving walkway ; " for yokohama world porters and red brick warehouses, take the kishamichi promenade

    往陸標塔購物中心( landmarkplaza )和濱女皇廣場( queenssquareyokohama )方面,走「移動人行」 ;往濱worldporters和紅色磚瓦倉庫方面,穿過電車路。
  12. If the progress chart is in horizontal, is it apply to a bar chart ? interesting point

    如果平放前鋒,適用於圖嗎?有趣的觀點。
  13. Combining operation of new way of safety management in hengdaohezi branch of train affairs, the thesis explains some new methods, such as adding up of a hundred safety marks, check of joint liability and linear management, and analyzes thoroughly management information system of safety statistics for branch of train affairs in analysis on system demand, analysis on system structure and function, and analysis on system data and data process. in the system, data standard of two " two violation " accident of workers and leaders is classified into three levels a, b and c, which is convenient to computer management

    2 、結合河子車務段安全管理新辦法的實施,論述了安全百分累計、連帶考核、性管理辦法的基本思路和內容,從系統需求分析,系統組織結構與功能分析,系統數據與數據流程分析等方面,對車務段安全統計管理信息系統進行了詳細分析設計,將職工、幹部「兩違」事故數據標準分為a , b , c三類,便於使用微機管理。
  14. The analysis of the large - scale synoptic situation shows that strong precipitation is closely related to the explosion of monsoon and the intensification of cross - equatorial flow which bring a lot of vapor and meet with cold masses at the eastern of northwest district on 8th, june causing extremely heavy rainfall ; that subtropical high - level jet at 200hpa, subtropical high at 500hpa and low - level jet at 850hpa are the weather backgrounds favorable to strong precipitation ; that the pattern of eastern highs and western lows and the establishment of a low - level jet and the coupling between upper - and low - level patterns that determine that the rain occurred in the east of the northwest china ( on average, this is the rainy season for the south of china, but not for the northwest china ) ; that water vapor comes from southerly and easterly flow which converge at the eastern of northwest district with convergence mainly in lower levels and pbl ; that the high value of the whole - level apparent heat source < q1 > is near the area of large rainfall in the direction of northeasterly - southwesterly agreeable to shear line very well and the condensation latent heat releasing is main heat source with vertical advection item playing key role in q1 and q2 ; that there is a vertical secondary circulation crossing low - lever jet whose ascending branch is at the area of large rainfall ; that the construction of convection instability and conditional symmetry instability results that there is not only deep thermal instability, but also moisture influx and triggering mechanism of thermal instability causing strong torrential rain

    作為對比,本文還對2002年6月24 - 25日發生在北京地區的強地形雨進行了分析,並討論陜南、北京地區兩地暴雨的異同點以及地形作用的共性和個性,為兩地暴雨預報提供有益的參考,得出了一些很有意義的結果: 1大尺度環流背景分析表明: ( 1 ) 「 02 . 6 」強降水與6月上旬越赤氣流和季風爆發密切相關,攜帶大量水汽的偏南氣流與冷空氣於6月8日交匯在西北地區東部,導致了這次強降水的發生; ( 2 ) 200hpa的副熱帶西風急流、 500hpa副高以及850hpa的低空急流的配置非常有利於本文分析之陜西強降水的發展與維持。大尺度形勢分析表明,東高西低形勢場、低空急流的建立和高低空形勢的配置決定了這場降雨出現在西北地區東部。與暴雨區相聯系,存在一支越低空急流的經向垂直環流,暴雨區處于該垂直環流的上升支; ( 3 )偏南和偏東氣流水汽通在西北地區東部交匯,水汽的輻合積聚主要在對流層低層和行星邊界層內完成; ( 4 )整層的視熱源< q _ 1 >高值區在暴雨區附近呈東北-西南向分佈,與切變走向非常一致,降水產生的凝結潛熱釋放是強降水區大氣的主要熱源。
  15. ( 2 ) respectively by elastic theory analyses and methods of structural mechanics, transverse static analytical equations for flexible pipeline rigid pipeline are established whose outcomes are applied in numerical example to compare those with that by finite element method. ( 3 ) considering interaction of filled soil, pipeline and foundation, with an eye to non - linear soil model, in view of the initial geo - stress field and the effects of interface between soil and pipeline, and by finite element method the calculational model and method are built for transverse stress in pipeline. then, by the great finite element analytical software ansys, those outcomes are applied in calculation example of positive buried pipe to educe the distribution of circumjacent soil pressure and stresses on cross section and to compare it with that calculated by conventional ways before those outcomes are applied in engineering case of positive buried pipe with flexible filled materials to confirm distribution of soil pressures after the measure for reduction and to compare it with measurements. as a result, the model set up in this paper is proved to be applicable after all above - mentioned analyses

    本文基於彈性理論和有限元原理與方法,分析了上埋式地下管向力學計算方法和性狀並探討了上埋式地下管的減荷等問題: ( 1 )在分析現有幾種典型的管垂直土壓力計算方法的基礎上,探討了影響垂直土壓力的主要因素以及改進的方法; ( 2 )分別通過彈性理論分析法和結構力學的方法,建立了地下管柔性圓環和剛性管涵的向靜力計算方程,並應用在算例中,把所得結果和有限元方法所得結果進行對比分析; ( 3 )考慮填土、管和基礎的共同作用、土體的非性特性、初始應力場以及土體和管的接觸面因素的影響,利用有限元的思路,建立了地下管向力學有限元計算模型和方法,並且採用大型有限元分析軟體ansys ,針對上埋式管工程算例,得出了管周土壓力以及管截面應力的分佈狀況和規律,並和理論值進行對比;針對施加柔性填料的上埋式管工程實例,得出了減荷后的土壓力分佈,並和實測值進行了對比。
  16. By the research method, this paper bring up the trunk inland waterway net layout project of the " two vertical and three horizontal " to assist with the some contact line and the trunk inland waterway programming standard, and bring up to for guaranteeing program the project smoothly some suggestions into practice

    通過本文研究方法運用,提出江蘇省干網「二縱三」輔以若干條聯絡干的布局方案合干規劃標準;並提出為保障規劃方案順利實施的一些建議。
  17. Based on the analysis of the lateral acceleration data of vehicles measured in shanghai metro lin, this paper suggests that the lateral oscillation force of the vehicles shall choose 10 % of the vertical load on a single wheel

    摘要根據鐵路車輛及上海軌交通3號上實測車輛向加速度值,建議向搖擺力取軸重的10 % ,按目前承軌合構造,車輛偶然脫軌后可能向偏移左右各1 . 75m 。
  18. Liner 400 / 450mm is auxiliary in road construction activity, used in zebra crossing ( pedestrian crossing ) and entrance and exit to a highway, hand pull marker

    斑馬熱熔劃機是熱熔標施工的輔助設備,它是用來塗敷斑馬(人行橫道線)及高速公路出入口標的,施工方向為拉力方向。
  19. Picasso ' s elongated don quixote ; lengthened skirts are fashionable this year ; the extended airport runways can accommodate larger planes ; a prolonged black line across the page

    畢加索畫的拉長了的唐吉訶德;今年很流行長裙;延長了的機場跑能容納更大的飛機;一條延長的黑過這一頁。
  20. In the higher velocity, especially in the critical velocity, the continuous model is invalidity. 2, in this paper, assume that the track and wheels are ideally smooth and no carriage or wheel - axle bending vibrations occur. invoke the basic hypothesis of the bernoulli - euler theory of beams : namely, that plane cross - sections initially perpendicular to the axis during bending

    2 、在對連續性模型的分析基礎上,假設軌與車輪為理想光滑的、沒有車輛和輪軸激起的振動,引用bernoulli - euler梁理論的假設:即垂直於梁軸截面在彎曲過程中仍然垂直於梁的中性軸。
分享友人