止推支承 的英文怎麼說

中文拼音 [zhǐtuīzhīchéng]
止推支承 英文
thrust support
  • : Ⅰ動詞1. (停止; 攔阻) stop; cut out 2. (截止) close; end Ⅱ副詞(僅; 只) only; just Ⅲ名詞(姓氏) a surname
  • : 動詞1 (向外用力使物體移動) push; shove 2 (磨或碾) turn a mill or grindstone; grind 3 (剪或削...
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ動詞1 (托著; 接著) bear; hold; carry 2 (承擔) undertake; contract (to do a job) 3 (客套話...
  1. Proceeding with the support " s force condition is analysed in the static and revolve state, the stress distributions in the contact areas of support and roller are researched by way of hertz theory, the tow - dimensional elastic movement of the contact area is studied by contact mechanics, and the formula and curve of movement regulation are deduced

    從回轉窯靜與運轉時的受力情況分析著手,依據赫茲接觸理論對托輪與滾圈接觸區的壓力分佈進行了分析,並用接觸力學方法研究了接觸區的二維彈性滑動,導出回轉窯軸向下滑計算公式,從而得出回轉窯軸向下滑特性曲線。
  2. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三水準設防、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構非線性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通過收集大量的實橋設計資料,經分析計算,歸納總結出計算上下部結構相對位移的簡便計算方法;並綜合國內外的經驗值,提出梁的長度se的設計原則;同時運用動力學突加荷載的原理,導分析了預應力鋼絞線式(鋼棒連接式)落梁防裝置設計載力的計算方法和設計伸長量s _ f的取值;最後本文通過實橋計算,說明了落梁防系統設計的方法。
分享友人