正龍六線 的英文怎麼說
中文拼音 [zhēnglóngliùxiàn]
正龍六線
英文
ldn-ii-
The first stage of electrification was completed with the start of an inner suburban service between kowloon and sha tin on 6 may, 1982
首階段的電氣化工程於一九八二年五月六日完成,九龍至沙田近郊線電氣化列車正式啟用。The two railway corporations are currently working on six projects - west rail, the mtr tseung kwan o extension, the ma on shan line, the kcr extension to tsim sha tsui, the penny s bay rail link and the sheung shui to lok ma chau spur line. these projects are due to be completed in stages between 2002 and 2007 at a total cost of about $ 100 billion
兩間鐵路公司正在落實六項鐵路工程,即西鐵、地鐵將軍澳支線、馬鞍山鐵路、九龍尖沙咀支線、竹篙灣鐵路線和上水至落馬洲支? 。各項工程預計在二零零二至二零零七年間分階段完成,總投資約一千億元。Shortly before 6 pm, a container truck was travelling along the slow lane of tsing long highway towards kowloon. when reaching near ting kau bridge, the vehicle stopped at a lay - by area and was reportedly rammed by a light goods vehicle ( lgv ) travelling on the slow lane from behind
下午約六時,一輛貨櫃車正沿青朗公路九龍方向的慢線行駛,當駛至近汀九橋時,貨櫃車停於一個避車處,據報被一輛沿慢線尾隨的小型貨車撞向車尾。
分享友人