正龍六線 的英文怎麼說

中文拼音 [zhēnglóngliùxiàn]
正龍六線 英文
ldn-ii
  • : 正名詞(正月) the first month of the lunar year; the first moon
  • : Ⅰ名詞1 [動物學] (古代傳說中的神異動物) dragon2 (古代巨大的爬行動物) a huge extinct reptile:恐...
  • : 六名詞(姓氏) a surname
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  1. The first stage of electrification was completed with the start of an inner suburban service between kowloon and sha tin on 6 may, 1982

    首階段的電氣化工程於一九八二年五月日完成,九至沙田近郊電氣化列車式啟用。
  2. The two railway corporations are currently working on six projects - west rail, the mtr tseung kwan o extension, the ma on shan line, the kcr extension to tsim sha tsui, the penny s bay rail link and the sheung shui to lok ma chau spur line. these projects are due to be completed in stages between 2002 and 2007 at a total cost of about $ 100 billion

    兩間鐵路公司在落實項鐵路工程,即西鐵、地鐵將軍澳支、馬鞍山鐵路、九尖沙咀支、竹篙灣鐵路和上水至落馬洲支? 。各項工程預計在二零零二至二零零七年間分階段完成,總投資約一千億元。
  3. Shortly before 6 pm, a container truck was travelling along the slow lane of tsing long highway towards kowloon. when reaching near ting kau bridge, the vehicle stopped at a lay - by area and was reportedly rammed by a light goods vehicle ( lgv ) travelling on the slow lane from behind

    下午約時,一輛貨櫃車沿青朗公路九方向的慢行駛,當駛至近汀九橋時,貨櫃車停於一個避車處,據報被一輛沿慢尾隨的小型貨車撞向車尾。
分享友人