  1. For example, the cost overbudget filter compares baseline costs to currently scheduled costs and then displays or highlights only tasks whose scheduled costs are higher than their baseline costs

    譬如, 「成本超過預算」篩選器將比較基準成本和當前計劃成本,然後顯示或突出顯示計劃成本超過比較基準成本的任務。
  2. Displays baseline dates, work, and costs

    顯示比較基準的日期、工時和成本。
  3. Change baseline information for one or more tasks

    更改一個或多個任務的比較基準信息
  4. To compare baseline estimates to actual data

    如果要將比較基準估計值與實際數據相
  5. To add a task to a baseline or interim plan

    如果要將任務添加到比較基準或中期計劃:
  6. Compare baseline estimates to actual data

    比較基準估計值與實際數據相
  7. Add a task to a baseline or interim plan

    將任務添加到比較基準或中期計劃
  8. List of tasks whose costs will exceed the baseline cost

    成本超出比較基準成本的任務的列表
  9. To save a project file with baseline information

    如果要保存只包含比較基準信息的項目文件:
  10. A baseline is essential for tracking project progress

    比較基準對于跟蹤項目進度非常重要。
  11. List of resources whose costs will exceed baseline cost

    其成本將超出比較基準成本的資源的列表
  12. Fourth, according to the weibull distributing functions of equivalent loads, calculated the max loads by expanded sample method, acquired eight routine loads spectrum of each roads taking advantages of the connover classification method, calculated the respective enhancement coefficient in principle of amended miner linear accumulated fatigue damage rule, by the comparative norm of general tar - paved road, educed the mathematical model of calculating enhancement coefficient of synthesized roads

    利用數理統計的方法得到了各路面的等效載荷的weibull分佈函數。第四,根據各路面的等效載荷的weibull分佈函數採用擴展樣本法求得了各路面的極值載荷,按照connover的分級法得到了各路面的八級程序載荷譜。以一般瀝青公路為比較基準,採用修正的miner線性累積損傷理論,根據前橋的s - n和p - s - n關系式得到了各路面的強化系數,建立了綜合路面的強化系數計算的數學模型。
  13. 2. in the task name field, select the task you want to add to the baseline or interim plan

    2 。在「任務名稱」域中,選擇要添加到比較基準或中期計劃中的任務。
  14. The difference between the baseline and scheduled task or resource information

    日程排定的任務或資源的信息與比較基準之間的差別。
  15. It ' s important to find tasks that vary from the baseline plan as soon as possible, so you can adjust task dependencies, reassign resources, or delete some tasks to meet your deadlines.

    因此盡早發現偏離比較基準計劃的任務非常重要,這樣就能調整任務相關性、重新分配資源或者刪除某些任務來滿足期限。
  16. Your main tracking task is to compare the baseline data with actual, or current, data.

    主要的跟蹤任務是將比較基準數據同實際或當前數據進行
  17. It indicated a mismatch in the lower - level comparison in the air data system, specifically with angle of attack

    這表明在大氣數據系統在比較基準方面有匹配不當的問題,特別是在迎角狀態下。
  18. Because the baseline will provide the reference points against which you compare actual project progress, it should include your best estimates for task duration, scheduling, resource allocation, costs, and the other project variables you want to monitor

    由於比較基準提供了一個參考點,可用於跟實際項目進度進行,因此其中應該包括對任務工時、日程安排和資源分配的盡可能估計,以及其它需要監視的項目變量。
  19. As the project progresses, you can identify cost variances by comparing baseline costs to scheduled costs

    項目進展過程中,可以通過目前規劃成本和比較基準成本來確定成本差異。
  20. Variances in resource information refer to differences between the baseline and scheduled work and costs

    資源信息中的差異,則是比較基準和日程排定工時和成本之間的差異。