毛壩 的英文怎麼說

中文拼音 [máo]
毛壩 英文
maoba
  • : hairdownfeatherfur
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. Following a hearty breakfast, we will visit the 770 ft. oroville dam, currently the highest dam in the united states, and enjoy the great view of america s greatest reservoir. we will then take a trip to the orville dam visitor center where you will watch a fascinating documentary and learn all about the construction and maintenance of the oroville dam

    登上高達770英尺的全美國最高水,也是全美最大水之一的黃金水oroville dam ,在水上晨操,呼吸一下異常清新的空氣以外,還可居高臨下,觀賞全美最大人造水庫黃金湖及著名的羽河feather river 。
  2. Isotopic tracing analysis of round - axis flow of karst water in maoba syncline

    毛壩向斜核部巖溶水繞軸徑流的同位素示蹤分析
  3. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  4. According to theory of the environmental isotope tracer and theory of deuterium excess ( d - excess ) parameter with the atmospheric water and the groundwater, the dissertation has comprehensively researched on the regional karst water and the pressure - bearing karst water in deep maoba syncline in virtue of routine geologic and geochemistry investigation

    根據環境同位素示蹤、大氣降水氘過量參數和地下水氘過量參數演化理論,結合常規地質、地球化學工作,對該地區域巖溶水和毛壩向斜段核部深層巖溶承壓水進行了綜合分析研究。
  5. The farther knowledge has been acquired that pressure - bearing karst water in deep maoba syncline is replenished by the atmospheric water from both east wing and west wing of maoba syncline, but which from east wing is more, and it is impossible that the pressure - bearing karst water from west wing rounds to replenish east wing. 3

    得到進一步的認識;毛壩向斜核部的深部承壓水,同時接受向斜東翼和西翼大氣降水的補給,東翼的補給量相對大些;整個深部承壓水不存在西翼繞過核部補給東翼的可能性; 3
  6. In order to relatively hold up mud and sand on the spot and control deposition, we should control head channels, branch channels, main channels on slope surface comprehensively

    通過採用溝頭、支溝、干溝及坡面的綜合治理,實現相對就地攔截泥沙,從而達到控制庫淤積的目的。
  7. However, it is planned afterwards that the borrow areas under the submerged line of the reservoir are to be utilized to the full and the borrow area above the submerged line is not to be utilized to the greatest extent under the consideration of investment saving and environment protection

    出於節約投資和環保等方面的考慮,施工中擬最大限度地利用位於庫區淹沒范圍內的上、叢料場,盡量少用或不用位於淹沒線以上的卡巴料場。
  8. During the construction of the dam for dalong water control project, the anti - seepage earth materials for the main dam filling are from three borrow areas in the original design

    摘要在大隆水利樞紐大施工中,原設計主防滲土來源為卡巴、上、叢三大料場。
分享友人