水下側面 的英文怎麼說

中文拼音 [shuǐxiàzhāimiàn]
水下側面 英文
lateral plane
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : 側形容詞[方言] (傾斜; 不正) slant; sloping
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 側面 : side; flank; profile; lateral; side face; sideview; sideways
  1. I looked up through the smoke of my cigarette and my eye lodged for a moment upon the burning coals, and that old fancy of the crimson flag flapping from the castle tower came into my mind, and i thought of the cavalcade of red knights riding up the side of the black rock

    我透過香煙的煙霧望過去,眼光在火紅的炭塊上停留了一,過去關于在城堡塔樓上飄揚著一鮮紅的旗幟的幻覺又浮現在我腦際,我想到無數紅色騎士潮般地騎馬躍上黑色巖壁的坡。
  2. The upper of the east model boundary remains constant head and the at the lower of it, there might exists a diffluent interface. so the east and west sides of the diffluent interface are respectively the drainage area of east and west karst - groundwater of yellow river

    模型東界上部以黃河位為第一類頭已知邊界,部必存在一個分流,分流東西兩分別是黃河東西兩塊巖溶的排泄區,該分流可視為零流量邊界。
  3. A rabbitry and fowlrun, a dovecote, a botanical conservatory, 2 hammocks lady s and gentleman s, a sundial shaded and sheltered by laburnum or lilac trees, an exotically harmonically accorded japanese tinkle gatebell affixed to left lateral gatepost, a capacious waterbutt, a lawnmower with side delivery and grassbox, a lawnsprinkler with hydraulic hose

    一座養兔場和養雞場,一座鴿棚,植物的溫室,一對吊床太太用的和先生用的,金鏈花樹或丁香花樹遮蔭並掩蔽的日晷,裝在左邊大門柱上的日本門鈴奏著異國情調的悅耳玎玲聲,巨大的雨桶,有著排出孔和接草箱的刈草機,附有膠皮管的草坪灑器。
  4. A double falciform ejection of water vapour from under the kettlelid at both sides simultaneously

    從壺蓋同時向兩噴出兩股鐮刀形狀的蒸氣。
  5. When water reaches the saturated zone beneath the water table, it oozes slowly downward, and laterally.

    到達潛的飽和帶時,它就緩慢地向向滲透。
  6. According to their space position, the seismic features of shallow gas in this region can be divided into three groups : ( 1 ) features in the stratum : acoustic blanket, acoustic curtains, acoustic turbidity, irregular strong top reflection boundary, and phase pull - down in both flanks ; ( 2 ) features of the seabed : seabed pockmark and giant sunken pit ; ( 3 ) features in the seawater column : acoustic plumes, cloudy turbidity and point - line - type reflection

    該區的淺層氣地震特徵按空間位置分為3大類: ( 1 )地層中的特徵:聲學空白、聲學幕、聲學擾動、不規則強反射頂界、兩相位拉; ( 2 )海底的特徵:海底麻坑、大型塌陷坑; ( 3 )海層中的特徵:聲學羽流、雲狀擾動、點劃線反射。
  7. On top of one of the fast - opening ends that closed to the pig receiver & launcher shall assemble vent valve, safety valve and pressure gauge, and at the bottom shall assemble drain valve, sideway inlet and vent valve to take out medium from the main pipe as the power of forcing pig and conveyance medium

    靠近收發球筒快開盲板一端上部應設防空閥、安全閥及壓力表、部設排污閥、設進、出油(氣、)閥,以便從干管中取介質作為驅動清管器的動力及輸出介質。
  8. As the water settled, i could see him lying huddled together on the clean, bright sand in the shadow of the vessel s sides. a fish or two whipped past his body

    恢復平靜后,我看見他躺在船身,在澄凈的沙底上縮成一團,有一兩條魚從他身旁游過。
  9. There are four characteristics of the evolution of tidal creek as follows : ( 1 ) in the initial stages, tidal creek develops by continuous eroding trace to the source and depriving of the top of other tidal creeks. ( 2 ) the transverse moving of tidal creek occur mostly in the lower part, the middle part and the outlet take second place, and the upper part is more stability. ( 3 ) the different level branches of tidal creek transform into each other in the whole evolution course

    潮溝的演變具有以特點: ( 1 )潮溝在形成初期,不斷進行溯源侵蝕和襲奪以擴大集積而發展壯大, ( 2 )潮溝的向移動主要發生在潮溝的段,中段和口門次之,上段最為穩定( 3 )不同級別的支潮溝之間處在不斷地相互轉化過程之中。
  10. A new bridge structure cooperated by the single - towered cable - stayed structure and the rigid frame structure was presented. many aspects of jinma bridge are researched and analyzed, such as the design method, configuration of the superstructure, section choice of the tower, design and construction methods of the deep - water bases, the stiffness of the cooperated rigid frames, strengthening way in the tower. it is concluded that this new structure is the economical, aesthetic and suitable project for the large - span situation

    主要內容和結論如: 1 、提出了獨塔斜拉橋與兩剛構相連接的新型協作體系斜拉橋結構形式,並對該橋的方案比選、設計思路、橋系結構形式、塔柱截設計、深基礎的設計及施工方法、協作剛構的剛度選取、塔柱的直束加固等方作了詳細地計算分析和比較。
  11. Through the analysis and calculation the conclusion can be made that during the process of the timbering of excavation, the magnitude of soil stress decreases with the increase of the displacement on the base of the still earth pressure, and the earth pressure distribution varies from the triangular distribution of the still earth pressure to other distribution with the displacement of the timbering structure. the thesis introduces the bedding coefficient in the horizontal direction varying with the soil displacement from soil - structure interaction mode, therefore calculation can be made to get more rational calculation result using elastic foundation finite element method which is the same to timbering structure both upwards and under excavation surface

    通過分析計算可以得出,在基坑支護過程中,土壓力的大小在靜止土壓力值的基礎上隨支護結構向坑內位移增大而減小;土壓力的分佈由靜止土壓力的三角形分佈隨支護結構位移變化成其它分佈;由土-結構共同作用模式引入隨土體位移變化的平向基床系數,使支護結構在開挖以上部分同以部分一樣,均可採用彈性地基有限元法進行計算,得出更為合理的計算結果。
  12. Based on the test results and bearing formula for djcm pile composite ground under rigid foundations, it raises the design formula for the bearing capacity of djcm pile composite ground under flexible foundations. secondly, taking material nonlinear especially the glide between pile and soft soil into account, some tentative analysis and numerical analysis have been done by finite element software - ansys. it summarizes some basic regularity of the pile - soil stress ratio load transferring and variation along depth, deformation characters etc.

    其次,本文還應用大型有限元分析軟體ansys ,考慮泥粉噴樁復合地基中樁-土材料的非線性特性,並特別考慮了樁和樁土之間有相對滑動的實際情況,對柔性基礎泥粉噴樁復合地基的力學性狀作了初步的數值模擬分析,總結出柔性基礎泥粉噴樁復合地基中樁土應力比、荷載沿深度的傳遞特性和復合地基的變形特性等方的基本規律。
  13. Based on analysis of the characteristics of the composite soil nailed wall, simulating the soil nail, concrete layer, deep mixing pile and step excavation, a model is established to calculate the deformation of the wall, compiled simple and applied program of one dimension fem ; according to the field test data and the calculated data by the fem software this paper has developed, the design method and deformation of the wall in xi ' an area is discussed. the shape of destructive sliding surface of the wall in loess strata in xi ' an area with deep groundwater is gotten. finally the lateral deformation distribution and the experiential formula to predict maximal horizontal displacement of the composite soil nailed wall are given

    針對復合土釘墻構造的特點,建立了模擬復合土釘墻受力變形的一種計算模型,該計算模型可對土釘、層、深層攪拌樁以及分層開挖等進行簡化模擬;編寫了簡單實用的桿系有限元程序;結合工程實測資料及有限元法分析的結果,探討了西安地區的土釘設計以及復合土釘墻的變形規律,得出了西安地區一般黃土在無地時的破壞滑動形狀,復合土釘墻的向變形曲線以及計算復合土釘墻最大平位移的經驗公式。
  14. For example, after the collapse of ditong dam in idaho, may 5, 1976, it was found that it was not impervious very well, the impervious curtain was built poorly. when the seepage went through the impervious curtain, the exit water from the pervious material of the downstream or the right side of dam through the foundation or certain line between the foundation and the dam caused contact scour and piping

    如美國愛得華州提堂壩於1976年5月5日潰決,事後調查分析,因壩基透性大,防滲帷幕施工質量差,滲流穿透帷幕,經地基或地基與壩的接觸從壩體料區逸出或從右壩肩繞滲經游壩體逸出,出逸的流引起了接觸沖刷和管涌,導致潰壩。
  15. ( 4 ) wavy distribution of soil water along hillslope resulted from the fluctuation of runoff, upslope runoff infiltration, lateral downslope flow, and the difference of infiltration rate and evapotranspiration

    ( 4 )土壤分沿坡呈「波浪形」分佈是坡徑流的波動性、上方來(徑流)的沿程入滲、向沿坡向流以及坡各處入滲性能和蒸發蒸騰作用的差異等綜合作用的結果。
  16. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內邊坡為覆蓋層邊坡,坡體部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的荷載挖除,對于陡坡的坡可以將坡削緩,則效果會更好。
  17. This thesis used along caldwell ' s direct calculation method of the ultimate strength of ship hull girders, considered the double bottom and upperwing tank to ship ultimate strength contribution, first defined the stress distribution of the whole section of the ship girders. that is : in the sagging condition, deck and side shell of nearby deck remain the ultimate bucking strength, double bottom remain the yield stress. and the other parts keep elasticity

    本文沿用caldwell等人直接計算船體極限強度的思想,考慮雙層底和頂邊艙對船體極限強度的貢獻,首先將船體梁整體破壞時剖應力分佈確定為:在中垂狀態,甲板及甲板附近的舷均屈曲,雙層底區域則均屈服,其他部分保持彈性狀態;在中拱狀態,雙層底及之間的底舷均屈曲,甲板及頂邊艙區域均屈服,其他部分則保持彈性狀態。
  18. On the basis of the monitoring results of land subsidence and calculation of deep groundwater resources by using water balance method, it is shown that the leakage recharge from its upper shallow groundwater account for approximately 38. 2 %, drainage of the clay layers, about 41. 3 %, water release from the aquifers, around 5. 6 % and lateral inflow, some 14. 9 %, of the total groundwater resources

    摘要根據天津平原地沉降監測結果,採用量均衡法,計算出深層地開采量中,淺層地越流補給量佔38 . 2 % ,粘土性壓密釋量佔41 . 3 % ,彈性釋量佔5 . 6 % ,向流入量佔14 . 9 % 。
  19. The different drawbacks in the original design and construction of the emergency gate slot of the releasing tunnel of zhelin hydropower station in jiangxi province resulted in the disjunction of most slot corner plates under the parapet walls of two sides of the left hole and the damage of the second - phrase concrete in these slot corner plates, after the gate is closed and under the action of seepage water pressure

    江西省柘林電站泄空洞檢修門槽,由於原設計和施工均存在不同的缺陷,致使閘門關閉后,在滲透壓作用,造成左孔兩胸墻以大部分門槽護角板被擠壓脫開,護角板裏的二期混凝土損壞。
  20. Rms titanic, on her maiden voyage from southampton, england, to new york city, had sideswiped an iceberg 2. 5 hours earlier, popping rivets and buckling the hull ' s iron plates deep below the waterline

    英國郵船泰坦尼克號正在進行從英格蘭的南安普敦到紐約市的處女航,在沉沒前的兩個半小時,它從撞上了一座冰山,鉚釘砰砰地斷裂,吃的船身鐵板彎曲變形。
分享友人