水下埋管機 的英文怎麼說

中文拼音 [shuǐxiàmáiguǎn]
水下埋管機 英文
underwater burying machine
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : machineengine
  1. Underwater burying machine

    水下埋管機
  2. Through developing a 2 - dimensions heat transfer model of buried pipe - in - pipe heat exchanger and simulating the process by computer, the author figures out inter - relations of factors which influence characteristics of buried pipe - in - pipe heat exchanger, such as pipe diameter, pipe length, ratio of pipe diameters, flow rate, inlet water temperature, patterns of water inlet and outlet, and material features made of pipe, and proposes some optimizing indexes of buried pipe - in - pipe heat exchanger. the author studies the " heat - - short circuit " phenomenon as well and gives < wp = 5 > some important results

    本文通過建立地換熱器傳熱過程的二維傳熱模型,並藉助計算對分析結果進行解析,弄清了影響換熱器性能的徑、長、徑比、通過流量、進溫度、進出方式以及材等參數的作用,並提出了相應的優化指標,對研究界懸而未決的「熱短路」問題也進行了細致分析,得出了有關結論。
  3. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個工況的測試,即夏季製冷工況的測試、冬季供熱工況的測試、夏?冬過渡季測試和冬?夏過渡季測試;另外在夏季工況的測試中還進行了變流量測試,在冬季工況的測試中還進行了熱平衡測試。本文對測試數據進行了處理,計算出了冬(夏)季工況吸(放)熱量、熱泵空調器供熱量(製冷量) 、熱泵空調器輸入功率、單位長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱泵運行時地一二層進出溫度變化情形,得出地二層換熱能力優于地一層,且換熱很穩定;並分析了過渡季地一二層溫度恢復情形,得出熱泵系統停一周內地溫恢復特別快。
  4. Cathodic protection - external organic coatings for the corrosion protection of buried or immersed steel pipelines used in conjunction with cathodic protection - tapes and shrinkable materials

    陰極保護.于地的或浸於中的鋼外部防腐有塗層.磁帶和可縮材料
分享友人