水下填土 的英文怎麼說

中文拼音 [shuǐxiàtián]
水下填土 英文
underwater fill
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  1. The intense eluviation and weathering of soil with groundwater and run - off result in the enhancing of capacity of transference of some elements, such as si, al, fe, mn. the chemical reactions of the colloid particles in the soil water make those crannies or holes filled by some epigenetic clay minerals and quartz. then a great deal of white reticulate clay comes into being in the quaternary laterite of the dongting basin

    和地表強烈的淋溶作用使壤中硅鋁鐵錳等元素的遷移能力增強,壤膠體粒子之間的化學反應,使得這些孔隙空間在後期逐漸被次生黏礦物和石英所充,最終,在洞庭盆地第四系紅地層中形成大量的蠕蟲狀和根狀白色網紋。
  2. Seepage from land fills can pollute ground water or surface water.

    的滲漏可能污染地和地面
  3. In special cases very considerable quantities of waste gypsum from phosphoric acid plants are used to reclaim land after flooding of the sea.

    在特殊的情況,磷酸廠產的大量廢石膏用來築被海泛濫過的地。
  4. Based on the theory of unsaturated soil mechanics and the properties of compacted expansive soil, this paper takes the northern part k12 + 840 - k12 + 920 of nanning urban highway as an example to studies some aspects of lime improvement of expansive soil and the technology of construction. the chief content of this paper is : the lime improvement mechanism of expansive soil ; confirm the technical parameters of lime mixed from the results of test in laboratory ; the scale - down test to define the maximum effective grain size of expansive soil when it is improved by lime ; by building bank slope model and making use of finite element seepage flow program of saturated - unsaturated to calculate the examples, this paper simulates the humidity site in order to checkout the effect of lime improvement ; studies and proves that it is feasible to mix blocky expansive soil and pulverous lime, and to fill roadbed by common construction machines etc.

    本文研究的工作就述幾個方面展開:用石灰改良膨脹的機理;通過室內試驗確定摻灰的技術指標;在室內進行膨脹摻灰的最大有效粒徑的模擬試驗,即鈣離子試驗,由此總結出「粉?塊」灰?攪拌工藝的有效性、合理性和可行性;用數值方法對路堤使用期的濕度場進行模擬,並與路堤的強度?變形的計算域耦合,以檢驗性改良的效果,從而探索一種描述改良膨脹路堤運行工況的數值方法;用現有最常用的且費用最低的施工機具,對灰?進行「粉?塊」攪拌摻和及路基的築施工等。
  5. Descending into the grotto, he lifted the stone, filled his pockets with gems, put the box together as well and securely as he could, sprinkled fresh sand over the spot from which it had been taken, and then carefully trod down the earth to give it everywhere a uniform appearance ; then, quitting the grotto, he replaced the stone, heaping on it broken masses of rocks and rough fragments of crumbling granite, filling the interstices with earth, into which he deftly inserted rapidly growing plants, such as the wild myrtle and flowering thorn, then carefully watering these new plantations, he scrupulously effaced every trace of footsteps, leaving the approach to the cavern as savage - looking and untrodden as he had found it

    然後,走出洞來,把那塊石頭蓋回原處,在上面堆了些破碎的巖石和大塊的花崗石碎片,又用泥滿石縫,移了幾棵香桃木和荊棘花種植在這些石縫里,並給這些新移種的植物澆些,使它們看起來象是很久以來就生長在這兒的一樣,然後擦去四周的腳印,焦急地等待他的同伴回來。他並不想整天地去望著那些黃金和鉆石,或留在基督山島上,象一條似的守護著那些沉在地的寶藏。
  6. It is also the key factor to improve the highway grade in these areas. the sand harm usually happens and the roadbed is obviously influenced by the sand foundation stability condition and the groundwater if the roadbed earthfill height is low. on the contrary, the wind erosion usually happens if the height is high

    公路路基的合理高度是保證沙漠公路不產生沙害的主要因素之一,同時是提高沙漠地區公路等級的關鍵,沙漠公路路基高度低,則易出現沙埋病害,路基受沙漠地基穩定狀況及地的影響顯著,反之,則易出現風蝕病害,並存在高方路基和穩定性問題,工程造價相應增加。
  7. This paper discusses the train of thought for sea reclamation planning at the estuary district of the pearl river delta based on the research on sea reclamation, combining concrete conditions of the sea area at the estuary district, surrounding circumstances of resources, as well as the state of land utilization, and from the view of protecting the existing establishments near this district, and promoting the formation of favorable ecological environment at the district and implementation of the thought step by step under current policy

    摘要通過對海工程的相關案例研究,結合珠三角河口地區海域的具體情況、周邊資源條件及地利用情況,從有利於保護周邊現有生產生活設施、有利於形成新的岸生態環境、有利於在現行政策環境分步推進等角度出發,探討在珠三角河口地區進行海造地工程的規劃思路。
  8. It was indicated that the density of the filled soil and the drainage condition of the slope were the major factors controlling the deformation and failure of slope caused by the rise of ground water level

    分析結果表明:密度和斜坡排條件是影響斜坡因地位上升而變形和破壞的重要因素。
  9. According to the results of the compaction test and hearing ration test, it is discovered that the filled soil also has the swelling property after being compressed, which may result in the crack of the subgrade with the change of the water contents

    通過對路基的擊實試驗和承載比試驗表明,壓實之後具有一定的膨脹性,在含量變化差異性影響的脹縮變形可能導致路基開裂。
  10. The test obsvervation include air temperature, ground temperature, foundation moisture, freeze depth, freeze capicity, freeze residual capicity, groundwater table and shape transform of canal lining, etc. throught systemic observation, analysis of impact about each factor on fundation freeze capicity, evaluate effect on anti freeze of various canal lining, comparison on technology and ecnomic of different method, a kind of main canal lining format is been recommended to engineering practice with siutable to ningxia local feature, fufilling the need of main canal safey i application, economic and practical, that is using polystyrene plate laying under concrete slate and grit taking replace of filling layer and optimizing design

    試驗觀測內容包括氣溫、地溫、基量、凍深、凍脹量、凍脹剩餘量、地位和砌體外觀變化等項目。通過系統的觀測,分析各因素對基凍脹量的影響,評價各種襯砌型式的防凍西安理工大學工程碩士專業學位論文脹效果,並進行技術和經濟綜合分析比較,推薦出了適合我區特點、滿足乾渠安全運行、經濟實用、防凍脹效果好的乾渠防滲襯砌型式,即混凝鋪設聚苯乙烯板和砂礫石換層結構型式,加以優化設計,用於工程實踐。
  11. Through analyzing the structure of open caisson, and according to sinking stress principle, the paper introduced in the open caisson construction process sinking, correcting error, survey control as well as peculiar circumstance processing technical measure, such as in open caisson construction the inner - mold for sanding, framework supporting and steel binding, and concrete casting ; in open caisson sinking - control the sand in edge foot inner - mold, sand - pumping sinking, and pressure hydraulic monitor breaking and pressure - blowing sinking by air pressure blower etc

    摘要根據沉受力原理,分析了沉井結構,介紹了沉井施工過程中的沉、糾偏、測量控制以及特殊情況處理的技術措施,如沉井製作中的沙內模,模板支設和鋼筋綁扎,混凝澆注;沉井沉控制中的刃腳內模沙,抽沙泵抽沙沉,高壓槍破壓、空壓機吹壓沉等。
  12. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉井充、錨體澆築、主纜架設、箱梁吊裝、橋面鋪裝以及通車運營)的施工過程作了模擬,全面揭示了各工況錨碇沉井基礎與地基的變形變位規律,著重分析了影響散索鞍平位移的因素以及不同工況沉井前測地基平向抗力變化規律,並提出了不同深度地基平向抗力與平位移間的擬合關系。
  13. Through discussion of numerical solution, the author get the effect of height of filled soil, size of culvert, width of valley, property of filled soil, construction procedure and techniques on soil stress of the culvert top ; 3. through the centrifuge test, the paper validates the reliability of numerical calculating on high - stack soil ; 4. the paper puts forward the simplified calculating method of soil stress of the culvert top on the foundation of numerical simulating and centrifuge modeling

    通過對數值解的討論,得到高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,築體性狀,施工速度,地對豎向位移場及涵洞頂部壓力的影響情況; 3通過離心機的模擬試驗,驗證了數值計算對高路堤的計算結果的可靠性; 4在數值模擬和室內離心機模型試驗的基礎上,提出了高方涵洞頂部壓力簡化計算方法。
  14. He actually purchased the farm my father was raised on. there was a large gorge that ran through this farm. the river had changed course and taken all the dirt away and then when it changed course, it created a huge island and there were several acres of soil that could be planted and harvested, but there was this incredible crevasse which kept them from doing that

    伯伯在農場會做的一件事,事實上那農場是他向祖父買來的,爸爸也在那兒長大祖父決定要把橫跨農場的一條溝平,河流改道導致巨大河谷峽谷形成,裏面沒有泥,河把泥都帶走了,它改道時形成了一個巨大島嶼,那裡有好幾
  15. Firstly, gravel piles in soil were laid for compacting and consolidating soil, then gravel composite foundation was treated with dynamic compaction in order to form three - level soil that is gravel composite soil and high replacement ratio composite foundation and dense composite foundation

    該法先在層中設置好碎石樁體,利用擠密和排固結的作用使其得到初步加固,然後對荷載影響深度范圍內的復合體進行低能強夯處理,迫使樁體碎石沿徑向擴散,形成上部為密實的碎石二合層、中部為擴徑后高置換率復合地基、部為整體夯密復合地基的三層結構。
  16. The culvert is the works buried under the fillings, which is often used in hydraulics, communication, and water supplying engineering

    涵洞是埋設在的輸建築物,它在利、交通、供排工程中被廣泛使用。
  17. By using the constitutive model, we can establish the creep and consolidation model, the variation trend of super pore water pressure and the development of viscoelastic settlement and viscoplastic settlement. at last forecasting the long term creep settlement in the metallurgy industrial estate at the backward position of haihe river in tianjin

    並利用此本構關系建立蠕變與固結模型,計算出層在大面積作用超靜壓力發展趨勢,同時得出其粘彈性、粘塑性沉降發展趨勢,最後對冶金工業區軟長期蠕變沉降作出預測。
  18. It is shown that the bruises of geogrid are decreased if sheep - foot roller is used when lay - down thickness deeper than 30cm. the deformation of geogrid mainly comes of construction. the infiltration of rainwater is disadvantage for the stabilization of geogrid reinforced embankment

    研究表明:在虛鋪厚度大於30cm的情況,採用羊腳碾壓路機碾壓能有效減小工格柵的損傷;實際工程中工格柵的變形主要來源於施工的影響;雨的入滲對工格柵加筋路堤的穩定性極為不利;是經濟合理的坡面防護措施。
  19. In addition, the department investigated a total of 510 filled slopes and issued nine orders requiring the owners concerned to investigate and repair the buried water - carrying services which might affect slope safety

    此外,該署總共勘測了510個斜坡,並發出九份命令,令業主勘測和維修影響斜坡安全的地設施。
  20. This paper analyzes the influences of rainfall on soil nail support system, and reveals stabilization characteristics of earth fill prototype body in supporting or non supporting not related to the conditions of rainfall but be controlled by velocity increment of bulging and its critical value

    分析了降雨與非降雨條件對釘支護體系的影響,並揭示了體在無支護或支護情況的穩定性不與降雨條件有關,而是受控于滲速率增量及其臨界值。
分享友人