水下排水量 的英文怎麼說

中文拼音 [shuǐxiàbèishuǐliáng]
水下排水量 英文
submerged displacement
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : 排構詞成分。
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 排水量 : displacement; withdrawal; tonnage; water discharge; water displacement
  • 排水 : drain off water; drain away water; dewatering
  1. The experimental results showed that in the condition of this experiment four algaecides all had strong removing rate on algae, and their removing rate increased with dose increasing, and decreased with algae density increasing. according to the removing rate on algae and cost value or so, the sequence of four algaecides from good to bad were potassium permanganate, copper sulfate, hydrogen peroxide and sodium hypochlorite. in the condition of this experiment, the suitable dose of potassium permanganate was 0. 8mg / l, the algal removing rate was beyond 90 % and the cost of this algaecide was only 0. 0068 / m3. the efficiency of algae removal by four algaecides for huanghe river water was studied. the results showed that the majority of huanghe river water was bacillaroiphyta, and the dominant genera was melosira, which reached 78 % ~ 94 %

    結果表明,在實驗條件,四種殺藻劑均具有一定的殺藻效果,藻類去除率均隨藥劑投的增加而提高;原藻類數影響殺藻劑殺藻效果,四種殺藻劑的藻類去除率均隨原藻類數的增加而降低;通過殺藻效果、經濟性以及安全性等方面的綜合比較,對于以有毒藍藻為優勢藻屬的引灤,四種殺藻劑的優劣程度從優到劣序為:高錳酸鉀硫酸銅過氧化氫次氯酸鈉;在實驗條件,高錳酸鉀適宜投加為0 . 8mg l ,藻類去除率高於90 ,所需的藥劑費用僅為0 . 0068元m ~ 3 。
  2. This paper analyzes the groundwater discharging course using fluidics theory and combining quay structure construction ; sets up the method of fast drainage by the dint of pipeline and blind ditch of fragment stone ; and gives the computational mathematical model for quay drainage and calculation formula for drainage process according to the principle of conservation of mass and underground percolation, which have been applied for quay ' s stability design and calculation

    應用流體力學理論結合碼頭結構建設,分析了地泄過程,藉助管道和碎塊石盲溝建立了港口碼頭快速與擋墻基床的方法;運用質守恆定律和地滲流原理,建立了港口碼頭計算數學模型和過程計算公式,並用在了碼頭的穩定設計計算中。
  3. Treating combined sewage effluent from a secondary treatment plant, the process achieved 94. 5% cadmium removal for the trace quantities present.

    用這種方法處理二級處理廠出的綜合,可除去中含鎘的94.5。
  4. The upper of the east model boundary remains constant head and the at the lower of it, there might exists a diffluent interface. so the east and west sides of the diffluent interface are respectively the drainage area of east and west karst - groundwater of yellow river

    模型東界上部以黃河位為第一類頭已知邊界,部必存在一個分流面,分流面東西兩側分別是黃河東西兩塊巖溶泄區,該分流面可視為零流邊界。
  5. From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound

    但是由於夏季久旱,再加上每天供一千二百五十萬加侖,位已降到低於口。都市監察官兼道局技官土木工程師斯潘塞哈蒂奉道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的,除了飲用外,令一律禁止使用市裡供應的自來。尤其是南都柏林濟貧院,盡管限定用六英寸的計器,每個貧民每日配給十五加侖,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督,經查表證實,每夜要浪費兩萬加侖,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。
  6. During the adjustment. it decided the amount and the rate of humidification. the system can test the states of water level by water lever sensor, thereby the main control module can control the entrance and drain of water and give warnings ; as its good man - machine interaction, the system can expediently set the humidity and the amount of humidification and control water - in valve and leading winds through control panel. the system can communicate with computer thereby the net supervise is enabled

    本系統主要能夠完成以功能:採集空氣中的濕度狀態,並送入主控模塊,主控模塊根據現有的濕度判斷是保持原來狀態還是進行加濕以及加濕的大小和加濕速度等;能夠通過位傳感器測試位的狀態,從而通過主控模塊控制進、預報警、報警等;具有良好的人機交互性,能夠通過控制面板比較方便地進行濕度設定、加濕設定、進閥的控制、導風的控制等;能夠和上位機進行通信,從而實現網路監控。
  7. Abstract : based on the technical framework of atv ( abwasser technik verein ), the author introduces the evaluation idea of the influence for surface water due to pollution factor carried by rainwater and emphasizes the importance of the evaluation of the pollution factor by rainwater in the city drainagesystem planning, the calculation method of the pollution factor by rainwater and the treatment effect of the rainwater treatment facilities are brought and analyzed same time

    摘要:本文介紹了在德國atv規范框架對雨攜帶的污染負荷對體的影響的評價思路,闡述了在進行城市系統規劃時對雨污染負荷進行評價的必要性,並提出雨攜帶的污染負荷對體的影響以及雨處理設施的處理效果的化評價方法。
  8. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高頭、大泄流情況時存在的一些力學問題進行了研究和探討,取得以主要成果:一、結合小灣工程導流洞改建,對高頭( 252m ) 、大泄流( 1400m ~ 3 s )條件旋流式豎井中的流運動特徵進行了比較全面的測,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井流總摻氣估算方法,為導流洞氣方案的設計提供了參考依據;六、在高頭、大流條件,豎井空腔段部流速很高,盡管流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  9. Through investigating the statistic data of supplying and utilizing water past years, the actuality of supply engineering, the actuality of drain engineering and waste water disposal in tangshan urban, this study analyses the available water quantity cisborder and outside and water environmental actuality in order to afford basic data for the optimization distribution of limited water resources in cantonal city

    如何使得有限的資源發揮最大效益即稱為亟待研究的關鍵問題,因此本論文針對唐山市資源優化配置做了如研究。通過調查唐山市歷年供用統計資料,給工程現狀、工程現狀以及污處理情況,分析市區可利用的境內外資源總環境現狀,為市區有限資源的合理規劃配置提供現實基礎。
  10. According to the distribution peculiarity of the two characteristic moments, the accessibility of water quality in taizhou source of yangtze river has been analyzed based on the maximal contamination zone of entire tide and the relationship between the length of contamination zone and the pollutant load. simultaneously, every project has been analyzed and compared by using the model in wuli lake water environmental renovation for getting some theoretic gist and technical supports for the engineering

    在此基礎上進行泰州江段質數值模擬,建立污混合帶范圍與關系曲線,並對泰州江段供源地質可達性進行了分析;將模型應用於五里湖環境治理工程中,預測各引方案湖體質狀況並進行各方案分析,從而為工程實施提供一定的理論依據和技術支持。
  11. Fuzzy comprehensive assessment of the underground watercontaminated by the leaching water of dumping area of open pit coal mine

    露天煤礦土場地環境質影響的模糊綜合評價
  12. They are moderately well drained with a fluctuating water table and contain low amounts of organic matter, phosphorus and potassium and

    受地位波動影響,土壤程度中等,有機質、磷和鉀含低(表2 、 3 ) 。
  13. The finite element analysis of 3d seepage field for surrounding rock mass of cavern groups of underground powerhouses was performed based on the nodal virtual flux method for solving the non - pressure seepage field and the improved drainage substructure technique for accurately simulating the complex seepage behaviors of densely distributed drainage holes, with emphasis placed on the seepage properties of the anti - seepage concrete curtain and drainage curtain in the anti - seepage and drainage system

    摘要在求解無壓滲流場結點虛流法的基礎上,結合可精細模擬密集孔復雜滲流力行為的改進子結構技術,付某地廠房廠區洞室群圍巖區三維滲流場進行了有限元求解分析,著重研究了防滲系統中的帷幕和幕的滲流特性。
  14. This system can be used to monitor the change in the underwater ground profiles during the geotextiles - laying process. all the data related to the process is recorded by the system. the system can predict and analyze the ground sections that have potential impact on the geotextiles - laying, and improve the quality of the geotextiles - laying

    通過深監視系統,操作人員可以掌握鋪過程中地形的變化情況,對可能影響鋪效果的地段作出前期的預測和處理,提高鋪的質,並且記錄鋪過程中的各種數據,作為檢驗鋪和施工效果的依據。
  15. Analysis of spatial variability of soil characteristics and crop yield under subsurface drainage

    暗管條件土壤特性和作物產的空間變異性分析
  16. This paper evaluates the underground water resources and its safe levels of miming, and then studies the availability of molepipe drainage, a kind of practical underground water regulation technique. starting with the elevation of underground water resources and a safe level of mining through variable system theory, this paper analyzes the conditions of underground water resources based on the well - studied determination method of determining the two hydrographical coefficients : rainfall infiltration replenishment rate and irrigation replenishment rate. then considering irrigation, rainfall, drainage and other related factors, a mathematical model is set up for the calculation of underground water storage, exploitation on water regulation

    論文從灌區的地資源及其可開采評價分析方面入手,在對兩個主要的文地質參數即降雨入滲補給系數、灌溉入滲補給系數確定方法研究的基礎上,對灌區的地資源狀況進行分析,依據灌區的灌溉、降雨、條件及各種現狀因素,建立了地資源計算的數學模型,西安理工大學工程碩士專業學位論文計算得到青銅峽灌區地的最大補給和可開采;另外對在開發利用地資源過程中的地位的調控進行了初步的探討,在銀北灌區開展對暗管調控地位的試驗研究。
  17. Wastewater collected from canteen kitchens, including that from basins, sinks and floor drains shall be fitted into foul sewer via grease traps capable for providing at least 20 minutes retention during peak flow

    來自食堂廚房的廢,包括來自池、槽和地面管的,應經由最大流時能夠保持20分鐘的集油器,入污道。
  18. On the busy streets of new york city people rush from place to place without even noticing them. but the ( 15 ) 50 kilogram round ( face ) plates ( they ) that ( provide ) prevent from ( following ) falling into the city ' s ( memories ) manholes actually ( they are ) bear very intricate designs. ( so ) though their function is to cover the holes covers in streets through which ( sues ) sewers, ( the stream ) drains and other structures are reached ; manhole covers have long ( by ) been admired for their beauty. now designers are turning ( ) them into usable art, which people are paying a lot of money to ( owe ) own

    在紐約的繁忙的街道上,人們沖沖的從這里趕到那裡甚至並沒有注意到他們.但是使得它掉進城市裡的探井蓋的大約50公斤的金屬板事實上擁有非常復雜的設計.雖然他們的作用是把街上的道口蓋住,而通過這些洞口,道,溝和其他的建築相互溝通.這些蓋子因它們的漂亮而令人欽佩.現在設計者正在把它們變成有用的藝術品,而人們正在花大的錢想擁有這些藝術品
  19. Uss bb - 55 north carolina battleship length overall : 222. 1m beam : 33m draft : 10. 8m displacement standard 36600t full load 46700t the north carolina bb - 55 was laid down 27 october 1937 by new york naval shipyard ; launched 13 june 1940 and commissioned at new york 9 april 1941

    總長: 222 . 1米寬: 33米吃: 10 . 8米正常: 36600噸滿載: 46700噸1937年10月27日,北卡羅萊納號戰列艦在紐約海軍造船廠鋪設骨, 1940年6月13日並於次年4月9日在紐約入役。
  20. The study has obtained the following conclusion : the increase of tonnage or the decrease of water depth will lead to an obvious decrease of the maximum velocity, while the increase of the tugboat power causes an unconspicuous increase of the maximum velocity

    通過本論題的研究,得出以結論:船舶的增加,深變淺,極限航速都將減小,且這種減小的趨勢較為明顯;增加拖輪功率,極限航速將增大,但增大的趨勢並不十分明顯。
分享友人