水下施工 的英文怎麼說
中文拼音 [shuǐxiàshīgōng]
水下施工
英文
subaqueous construction- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 下 : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 施工 : be in the process of construction; be under construction; build; construction
-
This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results
本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。To avoid the retardation of flood water, improve the discharging conditions and reduce flooding frequency and flowage damage on flood retarding basins, huai river commission made a decision to adjust and regulate the middle courses of huai river. the authorial thesis is based on the main part of huai river flood - protection planning, i. e., the flood - protection planning of huai rivers middle courses. author of thesis participated in the drawing up and the administrating of the plan
為了擺脫中、小洪水行洪不暢,減少行、蓄洪區在中、小洪水條件下的行洪機遇,淮河水利委員會在淮河流域總體防洪規劃中,決定重點解決淮干中遊河道防洪問題,論文作者親自參與制定了淮河中、上遊河道防洪規劃制定工作,並組織、領導規劃中各項骨幹工程的施工建設,前後數年之久。Probe into the construction of the underwater collar beam of the high - pressure jet grouting pile
高壓旋噴樁施工水下系梁的探討Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation
本文針對滇西山區大直徑灌注樁豎向承載力確定存在的問題,進行了5根試樁的靜載荷試驗,分析了區域地質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;地下水對樁承載力的影響程度;各種外部因素影響下,樁的施工工藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。In fact, stuff quality of space grid structures member, manufacturing accuracy and construction management are major factor that influence development with high quality and high - level of space grid structures, space grid structures commonly with large span, and more is public buildings, important buildings, mass man under it, dearness equipments on it, erecting at high level, hardest strengthen when happen problems
事實上,當前網格結構構件的材料質量,加工精度以及施工管理是影響網格結構高質量高水平發展的主要因素。網格結構一般跨度較大,而且多為公共建築,重要建築,下面人員眾多,設備貴重,網架建在高空,出了問題極難加固。Through the experimental research, we think : the technological capacity of fiberglass asphalt macadam if weaker than asphalt macadam, however, if use elasticized capacity to solve blending technological problem. adjust the breed of fiber silk, extend its diameter, its paving capacity is still worth exploring, asphalt - rubber macadam structure lager have good deformed - become capacity and crazed - resistance capacity, small gap rate. good water - resistance capacity, good hot - stability and simple construction technology. therefore. pitch rubber spall is a good cover material which is suitable for the second class or lower whose asphalt pavement has split open because of fatigue. and is the good structural measure of preventing half - rigidity grass - roots unit shrink - rift reflecting. pave a thin layer of pitch rubber spall between asphalt - type pavement layer and half - rigidity basic level, although the cost of building is higher than paving togongbu in the middle, the construction technology, crazing - resistance and water - resistance are better than togongbu, not only could reduce greatly the reflex of half - rigidity grass - roots unit material, long then the use lifespan of pavement, but also it is possible to reduce suitably the thickness of asphalt mixture layer, though the cast of building in the early days becomes more, in the long - term opinion, it have fully important technological and economical significance
通過試驗研究認為:玻璃纖維瀝青碎石的技術性能不如瀝青碎石好,但路用彈性性能較好,如能解決拌和工藝問題,調整纖維絲的品種,增大其直徑,其路用性能仍值得探討,瀝青橡膠碎石結構層具有變形性能和抗裂性能良好,空隙率小,防水性能好,熱穩定性較好,施工工藝簡單的特點,因此,瀝青橡膠碎石是二級及二級以下公路因疲勞而開裂的瀝青路面的良好罩面材料,也是防止半剛性基層收縮裂縫反射的良好結構措施,在瀝青類路面面層和半剛性基層之間夾鋪瀝青橡膠碎石薄層,雖然造價比夾鋪土工布高,但其施工工藝,抗裂性能和防水性能均優于土工布,不僅可以大大減少半剛性基層材料的反射裂縫,延長路面使用壽命,而且可能適當減薄瀝青混合料面層的厚度,雖然初期造價有所增加,從長遠來看,具有十分重要的技術和經濟意義。1 sedimentation anyslys of soil under the action of deadweight ; 2 sedimentation anyslys of structure in using ; 3 endogen force anyslys of structure in using ; 4 soil remolding type anyslys ; 5 homogenous flush works anyslys ; 6 anyslys of the structure sedimentation effects of different flushing amount at the same place ; 7 anyslys of the structure sedimentation effects of different flushing places ; 8 anyslys of the structure sedimentation effects of different horizontal flushing places ; 9 anyslys of the structure sedimentation effects of different vertical flushing places ; getting the different between the endogen force of common structure and that of slant structure. the rule of stricture sedimentation and the effect of different soil remolding type were also gained
對掏土糾偏過程做了以下9個方面的分析: 1 、土體在自重作用下的沉降分析; 2 、建築物在使用階段的沉降分析; 3 、建築物在使用階段的內力分析; 4 、土體受擾動類型分析; 5 、均勻沖水施工過程分析; 6 、同一個地方沖水量大小不同對建築物沉降影響分析; 7 、不同沉井沖水對建築物沉降影響分析; 8 、進深不同的土層沖水對建築物沉降影響分析; 9 、不同埋深土體沖水對建築物沉降影響分析。The dynamic characteristics of wharf piles subjected to lateral load is analyzed, used the dynamics theory. it gives an analysis and research to the functional mode of wharf foundation pile under flood tide torrent
論文對水平荷載下碼頭基樁的動力特性進行分析,用振動力學理論對碼頭施工中的基樁進行動力分析。The high geotectonic stress at the construction region and the activity subsurface water will have important effects on construction and operation
隧洞施工穿越高地應力區,且施工區活躍的地下水對隧洞施工及日後的安全運行有著重要的影響。Tunnel construction is very difficult hi region with high geotectonic stress and high subsurface water pressure. few deep - lying tunnels are constructed in civil conveyance and hydropower engineering up to now
特別是對在高地應力、高地下水位區域的隧洞建設,其施工難度更大,在國內的水利水電工程建設中並不多見。By the large quantity of indoor and field soil mechanics test, this paper investigated physics and mechanics property of xigeda stratum and xigeda compounding filling, profoundly and systematically studied on shearing strength, cbr ( including indoor cbr and field cbr ) and intensity feature of xigeda compounding filling. the new achievement and cognition as follows : ( 1 ) cbr value is decided by moisture content and mudstone content of xigeda compounding filling. the filling material can satisfy minimum intensity standard of express highway when mudstone content is less than some fixed value, ( 2 ) this paper established field cbr standard value which can synthetically evaluate the filling material nature and field compaction degree. ( 3 ) the optimal compacting mean of xigeda compounding filling is hard oscillation first and weak oscillation later, not traditional way which is weak oscillation first and hard oscillation later. ( 4 ) this paper put forward the conception of optimum moisture content in construction different from optimum moisture content of indoor impaction
本文以昔格達填料強度特徵為研究對象,通過大量的室內及現場試驗,從昔格達地層巖組的物理力學性質、昔格達填料的物理性質入手,對昔格達填料的抗剪強度、室內承載比及現場承載比特徵進行了較系統地研究,獲得了如下認識及進展:昔格達混合填料承載比值受填料含水量及其中泥巖含量的影響,當泥巖含量小於一定值時,昔格達混合填料具有較高的承載比值,能夠滿足高速公路對填料的最低強度要求;建立了綜合評判昔格達填料性能及現場壓實效果的現場承載比( cbr )標準;對于昔格達填料而言,最佳的碾壓方式為先強振后弱振而不是傳統的先弱振后強振;提出了與室內擊實最優含水量相區別的施工最佳含水量的概念。Adopting the construction scheme which combines iron - frame moulded board with unsegragating concrete underwater and encircling steel hoop on glass fiber reinforced plastic mortar pipes, the difficulty in construction of outfall in riprap mound within a short period period is overcome
摘要通過採用鋼框模板結合水下不離析混凝土以及對玻璃鋼夾砂排水管採用抱箍的施工方案,成功解決了在較短工期內完成拋石棱體中出水口施工難度大的問題。Distortion monitoring on intake of underground power station at the right bank in tgp
三峽工程右岸地下電站進水口施工期變形監測及特徵Method of facility water - blocking in mine
井下施工簡易止水方法Study of an underwater coating compound and its application
水下施工塗料及其塗裝工藝研究On the internet site placed by the enterprise deeptec, you receive views on underwater works, swimming pool design as well as on diver need
作為一家令客戶滿意的工業型企業, deeptec製造水下施工,游泳池建造,潛水員需求量經濟系列內的最新產品。The design of the downstream water supply during the construction of yunlong reservoir is presented, in which the problem from the downstream water supply during the construction period of the flood discharge tunnel, the main dam, the initial impoundment of the reservoir and the locking - up of the diversion tunnel is solved satisfactorily with simple construction method, and then the water supply is guaranteed with better social and economic benefit
摘要著重介紹雲龍水庫施工期下游供水設計,根據工程特點,較好地解決泄洪導流隧洞施工期、大壩施工期、水庫蓄水、導流隧洞封堵施工期等下游供水問題,施工方法簡單,確保了下游供水,取得了較好的社會和經濟效益。In harsh climate region, mere exists obvious local stress concentration near the upstream and downstream of the exposed - in - winter horizontal surface of the rcc dam, and the surface of spillway bucket though heat insulation is applied on the surfaces, tensile stress still exceeds the allowable one of concrete. this paper puts forward to adopt preset crack to avoid occurring more cracks. the special crack model is applied to simulate the dam preset crack, and the joint model of fracture mechanics is induced into strain - soften model
在結構措施方面,針對嚴寒地區高碾壓混凝土重力壩壩體越冬層面的上、下游面附近及溢流壩堰面反弧段表面有明顯的局部應力集中象現,在已採取一定的表面保溫防護的條件下,拉應力仍然超過混凝土容許拉應力,開裂難以避免,進而提出設置碾壓混凝土壩表面預留縫結構措施並對該措施進行深入研究,包括預留縫的擴展穩定和壩體沿預留縫的穩定性,以避免大壩在無措施部位開裂,解決大壩越冬層面水平施工縫的開裂問題。In this paper, basing on the data analysis and stimulating analysis of the concrete liner of the water diversion tunnel of the underground hydropower station in the right bank of the tgp, the distribution and influential factors of the thermal - creep stress of thick concrete liners with big diameters in the tgp are studied. the following several problems have been solved : 1
本文基於三峽工程右岸地下電站引水洞襯砌混凝土施工期監測資料和模擬計算分析,探討了三峽工程中大洞徑、厚襯砌混凝土在當前施工工藝下施工期溫度應力的分佈規律及影響因素,全文主要進行了以下幾個方面的工作: 1Discussed shallowly the coastal aquatic submarine construction maritime affair supervisory work should pay attention several questions
淺談沿海水上水下施工海事管理工作應注意的幾個問題分享友人