水中爆破 的英文怎麼說

中文拼音 [shuǐzhōngbào]
水中爆破 英文
underwater demolition {= ud
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 動詞1. (猛然破裂或迸出) explode; burst 2. (放在滾油里快炒) quick-fry
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • 水中 : aquatic; water水中爆炸 water shooting; 水中浮游生物 hydroplankton; 水中氣泡 underwater bubble; 水...
  • 爆破 : blow up; blast; burst; demolish (by explosives); detonate; explode; dynamite
  1. The construction techniques of sinking well and explode in water are introduced. auto climbing form panel technique is applied in the construction of main tower

    斜拉橋主橋墩設計為鋼筋混凝土圓端型沉井結構,其詳細介紹了沉井下沉施工技術,同時介紹了下松動控制技術。
  2. Discussion on the application of the water - stem in the blasting operation

    淺析炮泥在作業的應用
  3. For avoiding the occurrence of explosion - related accidents, the author presents an introduction to the safety regulations that should be observed. these includes the check of gas concentration before charge and initiation and after blasting, the adoption of interlocked blasting system, indirect blasting, initiation by stages at coal and beading faces, use of water stemming, shallow - hole balsting, blasting earning and safety distance

    為了防止在井下引起事故,對一炮三檢制和聯鎖制,反向作業,採煤、掘進工作面的分次起作業,炮泥的使用,淺眼作業,警戒和安全距離等安全規定進行介紹和分析。
  4. An experimental research on notching wet beach of the yellow river with the short - delay blasting is made for eliminating the risk that the main river channel is often threatened by some horizontal and slanting streams occurred on the downstream of the river and solving the problems from the bend cut - off for river channel harnessing, water way dredging and the siltation of the water diversion outlets along the channel

    摘要為了利用解決黃河下遊河道經常出現的橫河和料河威脅河道安全的險情以及河道整治的裁彎取直、疏浚航道和河道引口淤積的問題,在黃河濕灘上進行了微差開槽試驗研究。
  5. Discussion on removal blowing up in hydraulic structure blasting control

    工建築物控制的拆除問題探討
  6. It shows that the network, affected by stream of water, superposes each other leading to the jet of detonator energy cavity and metal fragments which can break the nonel - tube without transmitting detonation yet, so as to make the detonation transmission in some local network break off and bring about misfire

    結果表明,受紊亂流影響,導管網路相互疊加,比較凌亂,致使傳雷管產生的聚能射流和碎片容易將尚未傳的導管切斷或打,而使局部網路轟傳遞斷,造成拒現象的發生。
  7. ( 三 ) under the dynamic load of the explosion, the numeric analysis has been done and achieve the rule as follow : ( 1 ) when the frequency of vibration is 0. 3hz, the acceleration of the slopes top gets the maximum ; so 0. 3hz is believed the natural frequency of the slope as a whole ; ( 2 ) the vibration of explosion can been magnified because of the condition of the landform, when the relative altitude is up to 45m, the acceleration of horizon gets the maximum ; when the relative altitude is up to 100m, the absolute value of acceleration and the deformation of horizon is larger than that in the bottom of the slope ; ( 3 ) in the period of forced vibration, at the top of the slope, the acceleration of horizon become larger and larger ; at the middle part of the slope, it becomes smaller ; ( 4 ) when the explosion velocity of is much little, the shallow part destruction is the primary deformation of the slope

    (三)採用模態疊加法針對動力作用,進行邊坡的動力響應分析,得出了以下結論: ( 1 )振動頻率為0 . 3hz時,坡面頂部平向加速度峰值最大;綜合考慮,可認為該邊坡的自振頻率為0 . 3hz左右; ( 2 )地形對地振動存在放大作用,研究剖面的坡面,平向加速度及位移在地形相對高差45米左右最大,而後隨相對高差的增高而減小,相對高差為100米時,平向位移及加速度絕對值均大於坡腳; ( 3 )強迫振動段,平向加速度值隨時間變化的規律為:坡頂節點總的變化趨勢是越來越大,而坡體部節點的變化趨勢是越來越小; ( 4 )當振速較小時,變形壞的形式表現為坡頂表面滑塌型。
  8. Based on the engineering practice of the side slope excavation of dayanchi section within the road for the construction traffic of guandi hydropower station, the problems such as the selection of blasthole distance for presplit blasting, and the rock ridge, the levelness of the presplit face, lower hole - making rate of the auxiliary blastholes after the presplit blasting, the blasting network for prespliting and blasting zone and the angle change of the presplit hole etc. are analyzed ; for which the specific solutions are put forward herein as well

    摘要通過官地電站對外交通公路大鹽池合同段邊坡開挖預裂的工程實踐,對預裂的孔距選擇及下部嚴重出現巖坎、預裂面平整度、預裂后輔助孔成孔率低、預裂與網路以及預裂孔角度變化等問題進行分析,提出了具體的解決方法。
  9. Beijing - chinese engineers tuesday blew up a temporary barrier used during construction of the three gorges dam, unleashing the full force of the yangtze river upon the world ' s largest hydroelectric project

    周二國工程師拆除三峽大壩建設工程的臨時圍堰,世界最大的力發電工程三峽大壩開始接納全部長江江流。
  10. For reducing cost and accelerating construction speed sparingly, at present in irrigation works construct in producing testing progressively and antiabrasion layer that popularize excavating method competent to split law in advance, flexible cushion layer etc. accumulative charge to vertical hole has been tested in three gorege project only

    為了節省施工成本、加快施工進度,目前在利工程施工生產逐步試驗並推廣的保護層開挖方法有平預裂法,柔性墊層法等。對於垂直孔平聚能藥包用於生產試驗僅在三峽進行過。
  11. During the deep - hole blasting for the excavation of guishan quarry for construction of baoquan pumped storage hydropower station, the blasting powder factor and the charging concentration of the blasting powder in the rock are reasonably controlled, and then the rate of blasting chunk is greatly decreased with the reduction of the working amount of the boulder blasting afterwards in conjunction with the suitable excavator and crusher etc

    摘要在寶泉抽蓄能電站工程龜山料場開挖的深孔,合理控制了單位耗藥量和炸藥在巖石的集度,最大限度地降低了大塊率,並結合使用適宜的開挖及碎機械等措施,從而減少了二次工作量。
  12. The application of horizontal - advance - splitting in excavation of dam foundation

    平預裂在三峽工程壩基開挖的應用
  13. The effect of blast quake, the rule of slope failure and the controlling technique were made up as a whole in this paper to research. the main research foucs on : first, investigation of in site engineering geology and hydrological geology ; second, blast design and in site measurement : on the basis of the first stage work, considering special rock condition, blast design, blast test and measurement in site were made in the same time. the propagation rule of blast wave in the process of rock excavation, blast quake space and the effect of blast on rock slope were studyed

    本論文將開挖震動效應和邊坡巖體火穩壞規律及其控制技術作為一個整體進行研究,主要研究內容包括:現場工程地質文地質調查研究;方案設計和現場測試:在現場工程地質文地質調查研究基礎上,結合特定條件下的巖石條件進行方案設計,同時進行現場試驗和監測,研究路塹開挖過程產生的地震波傳播規律、振動場及對巖質邊坡的影響。
  14. Problems and countermeasures of blasting in deep water

    的難題與對策
  15. In practical engineering, reasonable solution of some important and key problems in common, such as the stability of the side slope in the explosion of water conservation construction ; using explosion to improve the productivity in oil production etc., require the thoroughly research on the dynamic mechanics of fluid - saturated porous media under impacting loading from the theories, numerical simulations and experiments

    在實際的工程應用,重大利工程施工時巖土邊坡的穩定性問題;採用技術在油層製造沖擊波以提高出油率時油層的響應,以確定炸工藝對提高石油生產率的有效性等關鍵性技術問題的解決都要求對含有液體的多孔介質在動載荷作用下的力學行為進行深入的理論、數值和實驗研究。
分享友人