水位比率 的英文怎麼說

中文拼音 [shuǐwèi]
水位比率 英文
stage ratio
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : Ⅰ動詞1 (比較; 較量高下、 長短、距離、好壞等) compare; compete; contrast; match; emulate 2 (比...
  • : 率名詞(比值) rate; ratio; proportion
  • 水位 : stage; water level
  • 比率 : ratio; proportion; rate比率計 ratio meter
  1. On the demand of application and according to the soluhons menhoned above, a method of displacement waiting auto - sy ' nchronizing is put forward, which is based on match filters. at the end a complete and speeflc set of hardware circuits and software programs which haplements the scheme, is also presented in the ancle. the synchronization system was tested in the pool and in the shallow wate near m port, the result of the test shows that its performance is satisfactory

    論文著重介紹實現了跳頻通信系統同步的一般方法,並詳細分析和對跳頻同步系統的捕獲方案,在此基礎上,提出了一個基於匹配濾波器的移等待式自同步方案,設計、完成並給出了詳細硬體連線電路圖、軟體程序流程圖和部分程序清單,該自同步方法在實驗室池實驗取得良好的效果,並在廈門港海域進行了現場實驗測試,具有較低的誤碼和一定的檢測概,結果令人滿意。
  2. Also a refined - pulp quality predictive model, with specific energy, specific load as the model inputs, and beating degree, wet weight as the model outputs, is presented. simulation results show that the models can be acted as theoretical bases for the automatic control of high - consistence pulp refining process

    即,建立了以原漿流量、白流量、盤磨機功為輸入變量,能量、負荷、濃縮機漿為輸出變量的動態模型,以及基於能量、負荷的成漿質量預報模型。
  3. The percentage of people living at or below subsistence level in china has decreased from 33 per cent in 1979 to single - digit level today

    中國人民生活在僅足糊口平或平之下的,已從一九七九年的百分之三十三下降至今天的只屬單數字的百分
  4. It was specially pointed out that, when the tail water is constant maximum tide, the computed flood surface is higher than that of nonsteady current, so there is some safety superelevation. underestimation of the roughness will make downward bias to compute along - river surface and bring hidden trouble for flood control. to improve the section can decrease the water level or offset the water rise for increase of floodplains " roughness, but it need much engineering works

    特別提出,按照恆定流計算出來的設計非恆定具有一定的安全儲備;而對于灘地糙的低估又會造成設計的偏低,給防洪工作帶來隱患;如果利用改進斷面形式來降低或彌補糙增加帶來的抬高,需要較大的工程量,所以平時應注意灘面的減糙管理工作。
  5. Taking the measure of uncorking on the steel tube and filling water before sand filling, the installation process of sand compaction piles is optimized, the installation parameters and testing rate under the near shore condition are confirmed, and the control and testing methods for the piles ' quality are summarized

    採取樁管壁開孔、先灌后灌砂的方法,優化了上擠密砂樁的施工工藝;給出了在近岸無掩護、流急的施工條件下的施工參數和檢驗,總結了沉樁定、高程式控制制、灌砂等參數的控制措施和檢驗方法。
  6. According to pump performance curve shown we can get that the distance h is changed with the rotate speed n in the same point q, and the flux q is changed with the rotate speed n in the same point h. from the curve we can get the rule that the distance and rotate speed are in direct with ratio at the same flux point, and the rotate speed and the flux are also in direct with ratio at the same distance point

    根據相似定律:流量與轉速的一次方成正;揚程與轉速的二次方成正;功與轉速的三次方成正。即在降低轉速,調低泵出揚程的同時,功下降的幅度非常大,從中可以節省相當大的電能。完全應在高時降低泵機組轉速,從而使電機的輸出功隨著轉速下降值與轉速原值商的三次方關系下降。
  7. The improvement system is made up of the pressure sensor, flow sensor, displacement sensor, electro - hydraulic proportional flow control valve, power amplifier, data gathering board and computer. the platform can carry out testing the hydraulic parameters, processing the tested data, saving the processed data and drawing, adjusting the pressure automatically

    改造后的測控系統主要由壓力傳感器、流量傳感器、移傳感器、例節流閥、功放大器、數據採集卡和計算機組成。改造后的實驗臺具有自動採集實驗數據、自動處理實驗數據、自動保存實驗數據、自動調節液壓系統負載壓力等功能,大大提高了實驗臺的工作效、測試精度和智能化平。
  8. Goals of highway network planning, in terms of the total length of the highway network as well as the share of expressway and over class ii highways in the network, were analyzed in chapter two by using of network connection index and analogy methodology. the developing goals of shaanxi arterial highway network were proposed. in the third chapter, the overall arrangements for highway network were studied through the importance index of nodes and links

    通過與世界經濟發達國家的公路網密度和運輸結構、以及我國其它地區,特別是與陜西省相鄰省(區)的公路網發展平相對,根據我國經濟發展「三步走」的奮斗目標,採用連通度指標測算和類的方法,按網連通度、公路網密度、人均公路網總里程和單汽車保有量的公路網總里程指標分別進行測算,確定了陜西省的公路網發展目標?公路總里程、高速公路里程和二級以上公路佔有的適當范圍。
  9. Firstly, we account for the former made and the sand selected are reasonable by experiments. then we develop the first project carrying the experiment for filling up of 30 years. contrasted with the count, the results have no difference, we carried two experiments under different water levers by the actually facts if engineering work in early days. by the result, we know that the gross of fill up have no difference

    本文從白石庫泥沙模型試驗入手,模型試驗首先通過模型糙和模型選沙驗證試驗,說明模型製作和選沙是合理的;然後開展初設方案30年運用庫淤積試驗,並與數模計算對,基本相同;試驗結合工程初期運用實際情況,進行了兩個不同初期運用方案的對試驗,從兩個方案試驗結果看,初期運用的兩個方案淤積總量差別不大,而從效益看,方案二優于方案一。
  10. The standard system of the university performance audit must be established on economy, efficiency and effectiveness and constituted by the standard of economy and efficiency, the standard of effectiveness and the good system standard, in which the standard of economy and efficiency is reflected through funding structure, fund balance ratio, the resource use efficiency indicator and the fund use structure indicator ; the standard of effectiveness is reflected through educational standard, research capabilities, student training quality and social well - known and recognized degree ; the good system standard is reflected through school running thoughts, school target positioning, school regulation building, school

    高校績效審計標準體系必須圍繞經濟性、效性和效果性來建立,由經濟性效性標準、效果性標準、良好制度標準三部分組成。其中經濟性、效性標準通過經費來源結構、經費結余、資源利用效指標、經費使用結構指標四方面來反映;效果性標準通過辦學平、科研能力、學生培養質量、社會知名和認可程度等指標來反映;良好制度標準通過學校辦學思路、學校目標定、學校規章制度建設、學校教學質量監控及測評系統等方面來體現。
  11. ( 2 ) a series of experiments on time scale distortion are made with real river model, inflow and outflow boundary condition, and continuous simulation. by means of analysis of the experimental data on model water level, water - surface gradient, cross velocity, outflow discharge process and the sediment transportation capacity, the main physical reasons for the above hydraulic parameters deviations caused by time scale distortion are illustrated : response delay of model channel storage capacity and rate of water level with time

    ( 2 )採用真實的河工模型和入出流邊界控制條件以及連續模擬的方法進行了有關時間變態的系列試驗,通過模型降、流速、出口流量過程線和斷面挾沙力試驗資料的分析,闡明了時間變態引起上述各種力參數偏離的主要物理原因:模型的槽蓄響應和洪過程時間變化的響應滯后。
  12. The width of main channel would influence the water level rising rate greatly in flood events. when the discharges in main channel increased to 8000 m ' / s from 3000 m3 / s the water rising amplitude at hydrometer stations in the lower yellow river was correlative well with the exponent ( - 0. 65 ) of main channel width and the exponent ( - 0. 33 ) of river longitudinal slope

    期主槽寬度對有較大影響,主槽流量從3000m ~ 3 s增大到8000m ~ 3 s時,下游各文站斷面的抬升幅度與主槽寬度的( - 0 . 65 )次方和河道縱降的( - 0 . 33 )次方具有較好的相關關系。
  13. With the meteorological and hydrographic data in songhuajiang and nenjiang valley from 1951 to 1995, using correlation analysis and empirical orthogonal analysis, the rule of the flood and relation between flood and precipitation distribution in this region are discussed. the results show that periodic change of water level is obvious in this region. now water level is in the serious stage from 1980 ' s. there are great relation between the water level of flood period and the precipitation. the unusual precipitation of nenjiang valley has greater impact than that of second songhuajiang valley. at the summer in 1998, songhuajiang and nenjiang valley encountered the ghastly flood and the reason for that is the anomalous precipitation great exceeding the historic maximum

    利用松花江,嫩江流域1951 1995年期間的氣象和文資料,採用相關分析,經驗正交分析等方法,討論了該流域洪澇發生的規律及其與流域內降分佈的關系.文章指出,江流域的變化有明顯的階段性,且具有全流域一致的特性,目前正處在80年代以來洪澇較嚴重的階段;嫩江流域降異常偏多對松花江洪澇的影響第二松花江的作用要大; 1998年夏季,松花江,嫩江流域出現超歷史紀錄特大洪的關鍵原因是嫩江流域6 8月的降距平百分遠遠超過了歷史上的的最大值
  14. The river mouth delta process is affected by river dynamics and coastal dynamics. the process of river delta is estimated by empirical model, analytical model and minimum stream power method. the three models are verified with field data of the yellow river mouth. the computed results are compared with field data. the demerits of the three models are pointed out

    採用經驗模型、分析模型和最小功方法研究河口三角洲演變過程.根據黃河河口三角洲資料,利用三個模型計算了河口三角洲岸線或沙咀寬度及岸線的平均延伸情況及對河口近口段河道的影響,較分析了各模型的計算結果,指出了模型不足之處
  15. The genetic diversity level ofreaumuria soongorica had the negative correlation with the content of soil total p and cl " significantly ( p < 0. 05 ), on the contrary, it had the positive correlation with co32 - significantly ( po. 05 ) but there was no significant correlation between the genetic diversity and the other salt factors in soil, which showed that the distribution of the individuals of reawnuria soongorica correlated with some certain soluble salt

    研究結果表明:無葉假木賊種群的多態( ppb )為94 . 56 ,角果藜種群的多態則為98 ,顯示出分佈於過渡帶的無葉假木賊和角果藜種群內均存在較高的遺傳多樣性,而角果藜種群遺傳多樣性平高於無葉假木賊種群。
  16. The fact that, notwithstanding having gone through some of the worst of circumstances in the history of hong kong, the banking system has a non - performing loan ratio in low single digits speaks volumes for the robustness of the banking system of hong kong and its ability to manage risk

    盡管香港的銀行體系過去幾年經歷了可以說是香港有史以來最惡劣的環境,但銀行體系的不良貸款仍處于單數字的低平,充分反映香港銀行體系非常穩健,而且管理風險的能力亦相當高。
  17. Based on the productive experiment on heihe dam site, during april to august 2002, site experiment was made on gongboxia hpp dam site, bjy - 40 extrusion curb placing machine was determined to be applied into gongboxia project, the batch ratio is : cement 80kg / m3, sand 651kg / m3, small stone 1449kg / m3, and sand ratio 31 %, w / c ratio 1. 31, admixture 3 %

    在生產性試驗的基礎上, 2002年4 8月,在公伯峽面板壩現場進行了擠壓邊墻施工各個環節的試驗,通過試驗,確定公伯峽面板壩使用陜工局西安理工大學工程項士學論文利機械廠研製的bjy 40型混凝土邊墻擠壓機進行固坡施工,其混凝土配合為:泥80kgb 』 ,砂651kgb3 ,小石1449kgb 』 ,砂31 ,1
  18. Similarity coefficient and genetic distances between two arbitrary individuals were caculated according to the data of experiments, the pedigree was constructed by two means ( they were upgma and parsimony ), and genetic diversity was discussedbased on selecting the best conditions of pcr with opg and opa primers from operon company, we obtained 163 bands using 24 random primers. in other words, 163 sites in crested ibis " genome were detected. the bands from 23 primers showed polymorphism. minimurn of polymorphic ratio was 0, maximum was 85. 71 %, and average was 48. 99 %. in the population which was composed by 37 individuals, most of genetic distances between two arbitrary individuals were less than 0. 1. the results showed that the degree of similarity among crested ibises was high while genetic diversity in the population was low accordingly

    我們在對operon公司opg系列和opa系列引物進行優化篩選的基礎上,用24條隨機引物共擴增出163條譜帶,即檢測了朱?基因組中的163個點,其中23條引物的擴增結果具有多態性;譜帶的多態最小為0 ,最大為85 . 71 ,平均為48 . 99 ;在由37隻朱?組成的種群中,任意兩個個體之間的遺傳距離絕大多數在0 . 1以下。這些結果表明,目前朱?個體間的相似程度很高,種群的遺傳多樣性平較低。
  19. These are : the prominence of the boss ' s photo in the annual report ; his prominence in company press releases ; the length of his “ who ' s who ” entry ; the frequency of his use of the first person singular in interviews ; and the ratios of his cash and non - cash compensation to those of the firm ' s second - highest paid executive

    這些指征是:老闆照片在年度報告中的突出置;他在公司新聞發布會上的突出地;他的「名人錄」記錄了多少名人;他在面試時使用第一人稱單數( 「我」和「你」 )的次數;他對薪居公司第二的主管人員給予的現金與非現金補償
  20. Approximate solutions show that the ground water level rises in proportion with rainfall intensity, time and inverse number of the effective porosity of the soil

    近似解說明了的上升與降雨強度和時間成正,與土壤的有效孔隙成反
分享友人