水位變化范圍 的英文怎麼說

中文拼音 [shuǐwèibiànhuàfànwéi]
水位變化范圍 英文
range of stage
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : 名詞1 [書面語] (模子) pattern; mould; matrix 2 (模範; 榜樣) model; example 3 (范圍) boundar...
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • 水位 : stage; water level
  • 范圍 : scope; limits; extent; boundary; confines; range; range dimension; spectrum
  1. Based on consider hereinbefore, this dissertation discusses several aspects on the problem of the sustainable and optimum exploitation of groundwater resources as follows : ( 1 ) reviewed entirely the origin and evolvement of the concept " sustainable development ", stated and commented the study status in queue on " sustainable development " around national and international range, thorough discussed the science connotation about the concept " sustainable development " ; ( 2 ) looked back and commented across - the aboard some furthest basic concept and proposition related to groundwater resources, put forward self opinions on a few existent mistake points of view and chaos understandings ; ( 3 ) expatiated entirely on the content and meaning of the theory of changeable groundwater resources system, contrast with the traditional methods of groundwater resources calculation and evaluation, combined example to show the application of this theory ; ( 4 ) thorough analyzed the difficult and complexity to forecast the groundwater resources, fully stated the traditional methods of groundwater resources forecasting, pointed out the characteristic and applying condition of these forecasting method, introduced the main ideas and methods of wavelet analysis developed recently, and the matlab software be known as the fifths era computer language, and its accessory wavelet analysis toolbox, applied these methods and tools to analyze the groundwater dynamic curve, adopted the b - j method and morte - carlo method, combined with the theory of changeable groundwater resources system, discussed the new view on the forecast of groundwater resources ; ( 5 ) synthetically analyzed the characteristics and limitations of the present all kind of groundwater manage model, combined mathematical programming mathematical statistics random process and the theory of variation system of groundwater resources on the unite optimum attempter of surface water and groundwater, emphasized how to make the model more nicety, more simple, more practicality ; ( 6 ) analyzed the inside condition and outside condition to assure the sustainable and optimum exploi tation of groundwater resources, the inside conditions are the follows : correct resources idea, scientific methods of resources calculation and evaluation, credible forecast methods of resources, exercisable measures of resources management, the outside conditions are the follows : the development idea of high layer, the transform of manage system, the matched policy and rule of law, the adjusted of economy lever, the improve of cultural diathesis, the boosting up of water - saving consciousness and detail measures, the control of population rising, the prevention and cure of water pollute, the renew and rebuild of ecology ; ( 7 ) scan the sustainable and optimum exploitation of groundwater resources from the high level of metagalaxy, earth system science, and philosophy ; lint out the more directions on groundwater resources

    基於以上考慮,論文主要從以下幾方面對地下資源可持續開發問題進行了比較深入的探討:全面回顧了「可持續發展」概念的由來與演,對國內外「可持續發展」的研究現狀進行了述評,並對「可持續發展」概念的科學內涵進行了深入探討;對涉及地下資源的一些最基本的概念和命題進行了全面的回顧和評述,對目前仍然存在的一些錯誤觀點和混亂認識提出了自己的見解;全面闡述了地下資源值系統理論的內容和意義,並與傳統的地下資源計算評價方法進行了對比分析,結合實例具體說明了方法的應用;深入分析了地下資源預測預報工作的極端重要性和復雜性,對傳統的地下資源動態預測方法進行了全面的評述,指出了各類預測預報方法的特點及適用條件,對最近二十多年剛發展起來的小波分析技術的主要思想和方法及其應用,以及號稱第五代計算機語言的matlab軟體和附帶的小波分析工具箱進行了介紹,並應用於地下動態過程線的分析,採用時間序列中的b ? j法,蒙特卡羅方法,與地下資源值系統理論相結合,探討了地下動態資料分析和地下資源預測預報的新思路;綜合分析了現今各類地下管理模型的特點及缺陷,將數學規劃、數理統計、隨機過程等與地下值系統理論相結合進行地表地下或多源的聯合優調度,使模型更準確、更實用;對保證地下資源可持續開發的內部條件和外部條件進行了分析,內部河海人學博卜學論文前言、摘要、目錄條件主要是正確的資源觀,科學的資源計算與評價方法,可靠的資源預測預報技術,可操作的資源管理措施,外部條件主要是高層發展思路、管理體制的革、配套的政策法規、經濟杠桿的調節、人文素質的提高、節意識的增強及具體節措施、人口增長的控制、體污染的防治、生態的恢復和重建等;從宇宙科學、地球系統科學及哲學的高度審視地下資源的可持續開發;指出了地下資源可持續開發的進一步研究方向。
  2. In this paper , a novel fuzzy optimization model and algorithm to optimize the locations , sizes and service areas of mv / lv distribution transformers in urban distribution network planning which can consider the imprecision and possibility of spatial load, the voltage level constraints and the cost of objective function is presented

    給出了考慮負荷、供電電壓平約束和目標函數最小費用的不精細性的城市電網中壓配電壓器置、容量和供電的模糊優規劃模型及演算法。
  3. Dynamic control of the limit water level belongs to non - structural measures of reservoir operation. with the analysis of the cause and rule of flood in the catchments and taking advantage of hydrology and metrology information, the operable method can be obtained which not only satisfies the flood prevention but also takes full advantage of flood resources, and the upper and lower limits of the limit water level are determined with serial hydrology calculation. then, the rule of using the upper and lower limits is put forward to reach a beneficial flood operation with small risk

    汛限動態控制方法屬於庫風險調度的非工程措施疇,通過分析流域洪的成因和庫區降雨及致洪規律,結合庫的蓄泄能力,積極慎重的利用文氣象預報信息,研究既能滿足防洪要求,又可充分利用洪資源的可操作性的調度方法,利用文系列的連續演算方式推求汛限,提出使用汛限上下限的原則,達到風險較小、效益較大的目的。
  4. Based on the analyses of the flow and sediment characteristics and evolution trend of the river bed of the fuling reach in the yangtze river before and after the impoundment of the three gorges reservoir, the water level, velocity variation and influenced range in the fuling reach before and fifty years after the operation of the three gorges reservoir with the construction of the fuling dock and four discharge combinations are calculated by using a two - dimensional flow mathematic model

    摘要在分析長江涪陵段的沙特性和三峽庫蓄前後該河段河床演趨勢的基礎上,運用二維流數學模型,分析了4種流量組合情況下在三峽庫運用前和運用50年,涪陵港區碼頭修建前後的、流速及其影響
  5. The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable

    本文的主要工作是:對國內外預應力鋼結構的發展歷史及現狀作了綜述和總結,指出當前預應力鋼結構工程實踐中存在的主要問題;闡述了預應力鋼結構的受力機理,並指出預應力鋼結構的適用和特點;在考慮結構應力和約束的條件下,建立預應力鋼結構優設計模型;提出多次預應力鋼結構優設計方法和步驟,採用線性規劃和滿約束準則相結合的優方法,可優設計出施加的每一級預應力的大小,並得到結構各部分的優截面;對多次預應力最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文中理論和方法,分別對大跨多次預應力鋼屋架、局部布索的平平行弦鋼桁架、整體布索的平平行弦鋼桁架和局部布索的超靜定鋼桁架等算例進行了優設計,經濟效益明顯;對平平行弦鋼桁架的幾種施加預應力的方案進行比較,對于局部布索,預應力只對下弦起到卸載作用,對上弦和腹桿基本不起作用;而整體布索預應力除對下弦卸載外,對索折點以外部分腹桿也起到卸載作用,經濟效益好於局部布索。
  6. The paper analysed transformation on hydrology factor after ningxia meili paper mill used its waste water to irrigate its fast - growing forestry, i. e., groundwater level raised after long irrigation, lake ' s area enlarged and soil became sauna where transition in highland irrigation and lowland irrigation

    摘要分析了美利紙業速生林基地用廢污灌溉后引起附近環境的,即隨著灌溉量增加,地下升高,湖泊濕地擴大;低灌區與高階地交接帶產生土壤鹽漬
  7. In general, the upward amplitude curve " curvature is larger, and it changes quicker. on the contrary, the downward is smaller and slower ; because the flare force contains the square of the wave elevation velocity, it results in an difference between the flare force frequence and the associated moving frequence ; the flare force decreases the downward amplitude of heaving oscillations ; the speed of ship has an ignorant effect on the peak values of three calculated values, but there is an obvious effect on the oscillating frequence ; the wave amplitude has an effect on the ship motion, and there is an linear relation between the oscillating amplitude and the wave amplitude on the whole. by the way, there are some experiences and lessons according to the progress calculation : before the calculation of the ship motion, we should checkout the balance in a calm water firstly, namely, the whole displace of ship and the longitudinal position of the center of gravity must be consistent with the draft in calm water, or else, the calculation may show the " floating " phenomenon ; the mixed language programming has a lot of virtues, but it exists a fatal limitation - the debug of dll

    研究表明:在某些頻率內相關動力系數基本不隨吃,只有超過某一頻率后動力系數的值才會出現差異;在橫搖方向,動力系數並沒有隨著吃發生規則,而是出現了波動現象;近船首剖面的動力系數計算表明,動力系數的波動非常大,並遠遠偏離了平均置的動力系數值,值的速率也不盡相同,總的看來,上振幅曲線曲率較大,較快,下振幅曲線曲率較小,較慢;外飄力和波面運動的速度的平方項有關,導致其振動頻率和相應運動方向的頻率不同;外飄力使升沉向下運動的幅值減小;船速對三個計算量的峰值影響甚微,但對振動頻率有明顯影響;波幅對船舶運動的影響是明顯的,船舶運動的幅值基本上和波幅成線性關系。
  8. Design procedure of u - shaped anti - rolling tank system is established, and program of scale design for tank is summarized, and an innovation selecting the natural frequency of controlled passive anti - rolling tank is put forward according to variation range of wave frequency, the natural frequency of rolling of a ship and other influencing factors, and causes of formation of tank damping and motion state of water in tank are studied, calculation formula of the u - tube tank damping and design method of tank damping configuration are given, and the influence of tank vertical location within the ship on ship parameters, stabilization performance of tank and water motion in tank is studied

    建立了完整的u型減搖艙系統設計程序;總結了u型減搖艙尺度設計;提出了根據波浪頻率、船舶固有頻率和其它影響因素,選取可控被動式減搖艙固有頻率的新方法;分析了u型減搖艙阻尼的形成原因,給出了估算艙阻尼和設計艙阻尼結構的方法;研究了減搖艙在船舶中的垂直置布置對船舶參數、艙減搖性能和艙內流體運動性能的影響。
  9. Honghu lake has a little direct impact on groundwater, but the indirect impact of which is powerful. 3. the impact on confined water from changjiang river is depressive with the distance to the riverside increasing. the confined water level changes differently in different season and region while the water level of changjiang river changes each unit

    研究結果表明: 1 、地下埋深較淺,月平均以年為周期,年平均較小; 2 、在近岸地區降不是影響地下的主要因素,洪湖對地下的直接影響較小,間接影響大; 3 、長江對承壓的影響強度是隨著距離增加而遞減的,長江一個單,不同季節、地區的承壓的響應不同。
  10. Based on the water supply risk and its variable process of dalian city, this paper proposes a cost - benefit analysis method for flood resources to inquire into the control range of the reservoir ' s flood limit water level, according to the use course of the flood resources and flood range analysis

    摘要以大連市碧流河庫為例,根據大連市供用系統的風險及其過程,分析超蓄洪資源的利用情況及其效益,並在對抬高庫汛限造成的淹沒損失分析的基礎上,利用邊際成本分析方法確定控制的
  11. In the light of the signals of roll angle and water level, we can control the air valve, and use this control method to simulate the controlled passively anti - rolling tank. simulation results indicate that this control strategy is feasible. the controlled passively anti - rolling tank can work in the wide frequency range

    控制策略是根據橫搖角度和邊艙液信號的來對氣閥進行控制,採用這種控制策略對可控被動式減搖艙進行了模擬研究,結果表明所控制策略是行之有效的,可控被動式減搖艙能在更寬的頻率內達到較好的減搖效果。
  12. Regarding foundation - pit scope of numerical analysis as a system ; settlement of foundation - pit boundary, displacement of retaining structure and swell of foundation - pit bottom as output of the system ; factors during construction of draining water, earth excavation and retaining structure as input of the system

    為此視基坑數值分析為一個系統,基坑周邊沉降、支護結構移和坑底隆起為系統輸出量,降、開挖和支護施工各工況中的因素為系統輸入量。
  13. 2. the particular water level - controlling circuits and sensor circuits in the patrolling point can monitor the change of water level and the vibration of apparatus in order to inform managers in time. at the same time if the change is n ' t within normal range, the alarming circuit can send the message. 3

    2 、在巡檢點中設置了獨特的液監控電路和傳感器電路以便及時監測輪機組振動情況,將數據快速通知管理者,若在規定之外,巡檢儀中的報警電路將及時報警。
分享友人