水力開挖 的英文怎麼說

中文拼音 [shuǐkāi]
水力開挖 英文
hydraulic excavation
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  1. Excavation of tunnel will lead to local geotectonic stress release and redistribution around tunnel ; the appearance of new outlet boundary will lead to outlet seepage of subsurface water and the change of mountain seepage field

    隧洞將引起局部地應的釋放及洞周附近的地應的重新分佈;隧洞后新的出邊界的出現將導致地下的大量出滲及山體滲流場的改變。
  2. In the process of construction, some special geological hazards will be met because of the great depth and long distance, such as high external waterpressure, watergushing, high geostress, rockburst, high geotemperature and nocuous gas and so on. these geological hazards become the main restricted factors of tunnel construction

    大埋深將使隧洞施工時遭遇到如高外壓及高壓涌、高地應及巖爆、高地溫、高瓦斯有害氣體等一系列地質災害問題,這成為制約深埋隧洞建設快速發展的主要因素。
  3. According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks

    根據多元化發展戰略,集團公司的業務范圍除電工程總承包外,還將業務擴展到各類土木工程、市政工程、海事工程的設計、施工、機械設備和金屬結構製造安裝等,核心競爭進一步得到擴展和增強,形成了年完成土石方15000萬立方米、混凝土澆注1500萬立方米、發電機組安裝1000萬千瓦、鋼結構製作安裝15萬噸的綜合施工能
  4. Through tracing the change of the stress on the horizontal and slantwise paths, the influence and scopes of the excavation effect on the inside stress field of the slope are put forward

    通過對平和傾斜路徑的應追蹤,提出了效應對邊坡內部應場的影響程度和范圍。
  5. Due to exceedingly flat arched vault of the flat tunnel with outsized span and renewed stress allocation in surrounding rock after excavation, which would inevitably induce some excessively large load on the base of arch, therefore, larger load - bearing capability in the is " foundation is a must. on the other hand, smooth face explosion must be applied to excavation of the arch base to further ensure the integrity and continuity of country rock around tunnel

    特大跨超淺埋隧道拱部結構過于扁平,后發生二次應分佈,拱腳處的應過大,要求有較大的地基承載,拱腳時必須採用光面爆破,保證圍巖的完整性和不受擾動,后及時封閉,防止該處積軟化圍巖。
  6. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」發建設項目,從地下空間靜結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下用於軌道交通的地下隧道狀態等三種不同狀態以及4個平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應矢量圖、位移分布圖( ux 、 uy )以及應等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同平與垂直剖線的應_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同平或垂直剖線的應_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的發利用以及在高層建築物地下硐室時的工程設計和工程施工提供參考依據。
  7. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡電工程大跨度、高邊墻復雜地下廠房洞室群,施工過程中和后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個壩區地應場的研究始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群全過程中圍巖應場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應場、施工順序對大型地下洞室群圍巖穩定性的影響。
  8. If provided with high pressure pump and water gun, it can make up a hydraulic mechanized earth work unit, used for ground leveling, dredging in rivers and pools, digging, excavation and transportation in small hydraulic engineering, as well as the air defense and underground project in cities

    若與高壓泵,槍配合,組成機械化土方工程機組,就可用作于土地平整,河道與池塘的疏浚、鑿等小型工程的方與輸方,以及城市的防空工程,地下工程。
  9. Measures preventing a nd handling hole caving are given based upon analyzing various factors that infl uence hole wall stability including objective, technological, environmental and artificial factors

    期間進行了平位移及沉降、深層位移、圈樑應位及量等項監測,對監測結果進行了分析,對監測發現的問題及時進行了處理,為基坑提供了保障。
  10. A deep foundation pit engineering in shanghai is adopted as an example. the factors of design, construction and nature environment on effect of internal force and deformation for a retaining structure are studied in detail through the example. these factors include the rigidity of retaining wall, rigidity and site of support rod, space - time effect of pit excavation, water environment of foundation pit etc. some useful conclusions of controlling deformation of foundation pit are obtained through the study

    以上海某深基坑為工程原型,利用有限元程序,詳細探討了支護墻剛度、支撐剛度及位置、基坑的時空效應、基坑周圍環境等設計、施工和自然環境因素對支護結構內和變形的影響,提出了一些控制基坑變形的方法措施,為深基坑工程的設計和施工提供了依據。
  11. A 2 - d hydrodynamic - numerical model was applied to typical rocky rapids called jiyutan by comparing different computational models. based on the comparison of different schemes, the change of the discharge and the flow current in a branch were analyzed, and the relationship between the flow condition and excavation area, scope as well as mode was discussed, the conclusions show : ( 1 ) in a branching rocky rapids, the velocity may be reduced and flow condition can be improved by excavating one channel partly

    本文在對各種數學模型比較的基礎上,應用二維數學模型研究典型石質汊流灘? ?廣西潯江鯽魚灘航道整治工程方案,通過各方案計算結果比較,分析了不同汊道的及汊道內不同面積、范圍以及方式所引起的分流比及工程區域航道條件的變化規律,研究結果表明: ( 1 )對于石質汊流灘來說,在某一汊道通過局部河槽,擴大過斷面面積,可以達到降低工程段流速、改善局部流條件的目的。
  12. Based on the available rule of variation in undrained shear strength during excavation, and the basic idea of the merchant model, this paper presents a constitutive relationship for saturated cohesive soils, capable of taking into account both stress path and time - dependent effect. it ' s named by the author as modified merchant model

    本文根據前人基坑前後土的不排抗剪強度變化規律的研究結果,並結合merchant模型的思想,提出了能同時考慮路徑和應應變隨時間變化的飽和粘土應應變關系,亦可稱之為修正merchant模型。
  13. Through inversion analyzing the results of inspection and observation which was applied the multipoint displacement measures and the drilling anchor stress measures to the top surface in the xianggui gypsummine eastern workings, this article will attempt to propose the deformation law of stope terrane after the underwater mine area, which provided a reliable basis for taking measures to control the strata movement

    摘要為了研究湘桂石膏礦的巖體變形規律,對該礦東采區頂板巖孔多點位移計觀測和鉆孔錨桿應計檢測的結果進行綜合反演分析,提出了下礦區后采場巖層的變形規律,為採取有效措施控制巖層移動提供了依據。
  14. 2 the 1 - d hydraulics computational method and 2 - d shallow water equation are employed to simulate the processing of channel dredging in tai ping wan hydroelectric power plant. the results of model tests and numerical analysis are combined and compared each other

    採用一維學計算方法和二維淺方程對大平灣電廠尾河道工程進行數值模擬,從而使模型試驗和數值模擬結合起來,相互比較。
  15. The change regularities of lining pressure and the failure process of surrounding rocks in permeation which a special sand is used as model materials are successfully simulated. the basic theory is established for the study of same type and the scientific basis for the tunnel prop design in saturation rock is provided

    採用特定的河砂作為模型材料成功地模擬了破碎圍巖隧道在遇情況下襯砌的受變化規律及巖體的破壞過程,為展同類型研究奠定了基礎理論,為飽巖體隧道支護設計提供了依據。
  16. Taking ningxia - inner mongolia reach of yellow river as a study case, a ice regime forecast data warehouse is established for the datamining concerned on the basis of the analysis on the ice regime changing law and its influencing factor of the reach, and then the conceptual mathematic model and artificial neural network model for the parameter calibration of ice regime forecast are built up with gis in combination of the relevant empirical forecast models based on the principles of the hydrological flow muting, thermodynamics and ice hydraulics etc., with which the design and development of the decision support system for the ice regime forecast with the integrated functions of information inquiry, model parameter calibration, temperature forecast and ice regime forecast are preliminarily discussed

    摘要以黃河寧蒙河段為例,在對河段歷史冰情變化規律及其影響因素分析的基礎上,建立冰情預報數據庫,進行數據掘,並以地理信息系統( gis )為平臺,以文學流量演算、熱學、冰學等原理為基礎,結合相關經驗預報模型,建立用實測資料進行參數率定的冰情預報概念性數學模型和人工神經網路模型,初步探討了集信息查詢、模型參數率定、氣溫預報、冰情預報等功能為一體的冰情預報決策支持系統的設計與發。
  17. The strength and stability of diaphragm wall are calculated respectively during different period ( digging period and application period etc ), according to different plans in choosing concatenation wall. it is proved that the support plan of excavation protection of meili garden is safe by introducing diaphragm wall and two horizontal steel supports. it is also proved that the total cost of that is low

    針對所選用的地下連續墻方案,分別計算了基坑期和使用期等不同受情況地連墻的強度和穩定性,論證了美荔園深基坑採用地下連續墻和兩道平鋼支撐的基坑圍護方案是安全可靠的,其綜合成本也是經濟合理的。
  18. As to the tunnels of jinping hydroelectric power station in sicuan province, the thesis discusses how to reasonably consider the initial stress field when designing a large - scale tunnel with high initial stress and deep buried. first, by analyzing of the rock lab tests and discusses the feature of regional geomorphology. explains the production of initial stress field, analyze the initial stress of jinping hydroelectric power station ; second, using the fem, the paper creates the real model of region. according to the results of stress measurement point, by combining of ann and fem to decide the boundary condition, the paper calculates the initial stress field ; at last, the paper analyzes the influence of the initial stress field formed from different condition on the deformation and stress of the surrounding rock, and the main factor to influence the initial stress. on the basis of the former work, the author proposes some proposals, which will be helpful for studying and designing of the similar undergroun d engineering

    首先從巖體的應?變形的特性入手,並結合工程區域的地形地貌特徵,對巖體初始地應場的形成做出解釋,結合錦屏電站初始地應的現狀提出了將地應場進行分帶;然後建立整個工程區的實體模型,在地質分析的基礎上,以工程區右半部分為代表,參照實測點的初始地應值,採用了神經網路與有限元相結合的方法反演了該區域的初始地應場;最後模擬隧洞的,通過計算比較分析了初始地應場對處于不同應帶內的隧洞圍巖穩定性的影響,在此基礎上提出了作者的建議,圖為該類工程的研究設計工作提供有益的幫助。
  19. We succeeded in crossing hanjing river of zhong - wu gas pipeline project, dawen river of jining branch line of west - east gas pipeline using the technique of trenching in water, controlling negative buoyancy and bottom towing without water interception

    公司採用帶成溝,控制負浮,管道底拖法等施工工藝,在江河不斷流的前提下,成功完成了忠武輸氣管道襄樊支線漢江穿越、西氣東輸冀寧支線大汶河穿越等工程。
  20. A trailing suction hopper dredger is one of the most popular dredging tools for regulation of waterway and harbors. it is a large self - propelled and self loaded dredger which can be used in wide water area such as an estuary or a river mouth. it is adaptive economical, it is widely used in large dredging projects in most countries in the world

    耙吸式泥船是最常用的清理河道港口的疏浚工具之一,它是泥船中大型自航、自載式泥船,適用於闊的海灣、河口,具有廣泛的適用性和經濟性,為世界上各個國家在較大的疏浚工程中廣泛採用。
分享友人