水力 的英文怎麼說

中文拼音 [shuǐ]
水力 英文
waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hydraulic mining; hydromining; 水力測功器 hydraulic dynamometer; 水力測量學 hydraulic measurements; [流] hydrometry; 水力沉樁法 jetting pilling; 水力沖裂法 hydraulic fracturing; 水力沖刷 sluicing; 水力沖刷勘探 costean; 水力沖挖 hydraulicking; 水力抽水器 hydraulic injector; 水力除焦 hydraulic decoking; 水力除鱗 hydraulic descaling; 水力除土 sluicing; 水力發動機 hydraulic motor; 水力紡紗機 water frame; 水力分級 hydraulic classfication; 水力分離器 hydroseparator; 水力分粒機 hydraulic classifier; 水力工程(學) hydraulic engineering; water power engineering; 水力夯錘 water ram; 水力機 water engine; 水力機械[裝置] hydraulic; 水力機械化施工 hydro-mechanisation construction; 水力機組 water power set; 水力計 potamometer; 水力計算 hydraulic computation; 水力能源 hydraulic energy; 水力開采礦井 hydromine; 水力利用 harnessing; 水力能源 hydraulic energy; 水力濃縮槽 hydrotator-thickener; 水力噴霧器 hydraulic sprayer; 水力坡度 hydraulic gradient; 水力切割法 water-jet cutting technology; 水力清理[清砂] hydroblast; hydroblasting; 水力升降機 hydraulic-lift; 水力施工 hydraulic operation; 水力摳紐 hydrojunction; 水力提升機 hydraulic elevator; hydrolift; 水力挖泥船 hydraulic dredge; 水力挖泥機 hydraulic navvy; 水力挖土 hydraulicking; 水力效率 hydraulic efficiency; 水力旋流器 hydrocyclone; hydrodone; 水力運輸 hydrotransport; 水力蘊藏量 potential hydraulic power; 水力資源 waterpower resources; hydroelectric resources; hydroelectric potential
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. Wrap hair in super absorbent second towel

    拿來吸水力超強的毛巾再次擦乾頭發。
  2. W rap hair in super absorbent towel

    用吸水力超強的毛巾把頭發包起來
  3. The maximum density is governed by the allowable limit of fluidity for hydraulic transport.

    最大密度是由水力輸送所容許的流態極限控制的。
  4. Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers

    由於三峽工程輪機技術上的復雜性和挑戰性,在左岸電站14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:輪機設計頭的確定,負傾角葉片輪機的應用,兩套水力設計,舍棄初期轉輪,蝸殼進行壓試驗等。
  5. Gold - hosted breccia in shuangwang ore deposit is hydrofracturing breccia

    摘要雙王金礦含金角礫巖水力壓裂成因角礫巖。
  6. The hydrofracturing breccia is formed by deep rich - sodic and gold - hosted fluid hydrofracturing in a set of devonian system hot - water sedimentary rich - sodic rocks

    認為該壓角礫巖體是深源富?含金流體在泥盆系一套熱沉積的富鈉質巖系中發生水力壓裂作用形成的。
  7. In allusion to test roadway in the zhang - luo second class highway and lin - chang freeway, through hydrologic analysis, hydraulic calculation and with the analysis of highway structure, the blue print of setting drainage system, construction technique and back - check experiment are presented

    針對張羅二級公路試驗段和臨常一級公路試驗段,進行了文分析和水力計算,並結合路面結構分析,提出了排系統的布設方案、施工技術方案和試驗檢測方案。
  8. Hydraulic civil engineering - part 2 : rehabilitation

    水力土木工程.第2部分:復原
  9. Simple method of hydraulic computation for dendriform waterallocation pipe net of water supply works in the rural area

    農村供工程樹枝狀配管網水力計算簡法
  10. The additional flow is formed by the device of dentoid baffle, and the application of the device of dentoid baffle cooperated with a stilling basin has been investigated by systematic model tests. based on the research results, the hydraulic problems such as the characteristics of hydrodynamic pressure and cavitation on the head of the denotid baffle, the properties of flow under the condition that the device of denotid baffle is used with a stilling basin, the hydraulic computation about a stilling basin, the estimation of energy dissipation and its various affection factors, the mechanism and effect of energy dissipation, and distributions of velocity and pressure and aerating concentration, etc, have been analyzed ; the method and step of hydraulic design of device of denotid baffle by which the additional flow is produced has also been proposed

    文中利用齒墩設施實現附加射流,對齒墩設施與消池聯合應用進行了大量的和系統的模型試驗,分析研究了中低佛勞德數條件下,齒墩墩頭的動壓強及空化特性,齒墩設施與消池聯合應用時的流態特性,消池的水力計算,消能量的估算及其各種影響因素,消能機理和效果,消池內的流速、壓強特性,摻氣濃度分佈等水力學問題,並提出了實現附加射流齒墩設施的水力設計方法和步驟。
  11. Pressure siphon roof rainwater drainage system

    屋面雨系統水力計算
  12. We can transmute water power into electrical power.

    我們能將水力變為電
  13. This paper takes the central heating system of heating company in shihezi city as its research object, on basis of heating theory, the heating system of waterpower and energetics were analysed. the problem of heating control system was studied. according to the characteristics of heating system. the new control project was designed

    本文以石河子熱公司集中供熱系統為研究對象,以供熱工程基本理論為基礎,對熱系統的水力和熱工況進行了分析,研究了熱控制系統目前存在的問題。
  14. To utilize hydraulic soil evaporimeter and supporting meteorology, radiation, the materials on the surface water evaporation, considering the influence of each factor of " soil - plant - atmosphere " system on soil evaporation, we set up calculating model of the soil evaporation which is suitable for the heilonggang region

    利用水力式土壤蒸發器及其配套的氣象、輻射、面蒸發儀器觀測資料,綜合考慮「土壤植物大氣」系統中的各個因素對土壤蒸散的影響,建立了適于黑龍港流域的土壤蒸散量計算模型。
  15. The researches indicated : ( 1 ) the seepage flow field of infiltration diversion is characterized by three - dimensional, saturated and steady flow. there is the close hydraulic relationship between the river and the groundwater in the filtering bed, and the groundwater is confined

    研究表明: ( 1 )滲濾取的滲流場具有典型的飽和三維穩定流特徵;滲濾取濾床中地下與河流的水力聯系比較緊密,濾床中的地下處于承壓狀態。
  16. ( 4 ) the maximum water quantity becomes greater, the better is the filtering bed permeability, the higher the river hydraulic conductance, the higher the river level, the larger the water - collecting area and the bigger the distance between collecting pipes. the water quantity varies directly with drawdown

    ( 4 )濾床的滲透性能越好,河床水力傳導系數越高,河位越高,取面積越大,取管之間的間距越大,則最大取量越大;位降深與取量成正比關系。
  17. It was reputed as the species gene bank of south china and the eco - protection screen of the pearl river delta

    擁有豐富的礦產、土地、林業、生物、旅遊、水力資源。
  18. Spanish cedar is very good a absorbing moisture, so they can absorb excess moisture in the humidor

    第二:西班牙杉木吸水力強?可以幫忙吸收保濕盒裡多餘的濕氣。
  19. The property itselfthe hydraulic conductivitydoes not change.

    它本身的性質,即水力傳導性並沒有發生變化。
  20. This type of barrier is a combination of the pumping trough and the hydraulic ridge.

    這類屏障是把抽槽和水力嶺結合在一起。
分享友人