水封壓力計 的英文怎麼說

中文拼音 [shuǐfēng]
水封壓力計 英文
water-filled manometer
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 壓構詞成分。
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  1. Using the opened thermosiphon of 38x3 as experimental element and water as working fluid, the characteristics of dynamic low load boiling, stable severe boiling heat transfer coefficient and critical heat flux are gotten for the opened thermosiphon at the pressure of 0. 02 - 0. 1mpa and 0. 1 - 0. 8mpa respectively, which makes up the drawback that the opened thermisiphon has not yet accurate boiling heat transfer relationship formulas. by means of experimental results, an opened thermisiphon waste heat recovery boiler is designed for the high temperature gases that the positi e electrode copper refining furnace exhaust, which overcomes effectively the drawback of short life, little capacity and unable to inspect that the closed steel - water thermosion has

    本文以工程上常用的38 3的開口底為實驗元件,以為工質,對開啟式熱管內的動態低負荷沸騰、穩態旺盛沸騰及臨界沸騰特性進行系統的可視化實驗研究,實驗為0 . 02 0 . 8mpa ,實驗得出了38 3的開口底管在工作為0 . 02 0 . 8mpa和0 . 1 0 . 8mpa下的管內沸騰傳熱系數及臨界熱負荷算關聯式,彌補了開口底管? ?這一新型傳熱元件尚無準確的沸騰換熱關聯式的缺陷。
  2. The following conclusions are gained : ( 1 ) the located shear band prongs the ligament near the top crack tip and the structure may occur shear - mode fracture at the angle of 155 ? to crack when load is 87. 92mpa ; the mode of fracture of the flange joint structure is not possible to be void - mode ; ( 2 ) it is proved that loading and then unloading repeatedly can not increase the possibility of invalidation of the structure when the times of loading and unloading are not too more when load is operating pressure ; the structure is safe when the vessel is operating ; ( 3 ) in the fe model of the thesis, not considering the influence of water pressure test which is in the process of fabrication of vessel in fe results in larger deviation in analysi

    得出了以下結論:在8792mpa的載荷下筒體一頭連接結構處的集中剪切帶貫穿韌帶,可能發生沿與原裂紋線成155 「角方向剪切型斷裂;筒體一頭連接結構不可能發生韌窩型斷裂; ( 2 )在工作下進行次數不多的反復加、卸載,結構不會破壞,也不會喪失安定性:結構在工作狀態下是安全的; m在本文的彈塑性有限元模擬算中,對于裂紋尖端進行學分析時,不考慮容器製造過程中試驗的影響,將導致算結果出現較大的偏差; ( 4 )筒體完全屈服時的載荷為92石3mpa ,頭完全屈服時載荷為86
  3. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應工程、移存梁工程、孔道漿工程、梁體端工程、橋面防層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液式兩種模板的設、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應應變雙控制確保預應施工質量的施工技術;採用重物移運器有效移梁的施工方法;漿、端、橋面防層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  4. In case of a vertical veseel tested horizontally in the shop, the test pressure shall relate to the design pressure adjusted for static head when the unit is in the vertical position

    5如果立式容器在車間進行平測試,測試應相對設進行調整,當裝置在立式位置時調整靜頭。
  5. The sealing test pressure can be the highest static head calculated according to power station

    ;密試驗可按電站最高靜算值( hmax ) 。
  6. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的高外問題,進一步分析和研究了襯砌荷載及外的作用機理和算方法; ( 4 )以錦屏二級電站深埋長引隧洞作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的方法對排方案和灌漿堵方案不同情況下的滲流場的頭分佈進行了數值模擬,並對其外進行了分析和研究,提出了滲流控制的具體措施。
  7. Finally, the paper expatiates the realization process of this design, including the rotation equipment management, the static equipment management, examines and service project management, the electrical management, the meter computer management, the water quality management, the lubricating oil management, the static seal management, the craft pipeline management, the bearing management, the pressure vessel

    最後,文章對系統的設實現過程進行了闡述,分別對大慶石化總廠設備管理系統的轉動設備管理、靜設備管理、檢維修劃管理、電氣管理、儀表算機管理、質管理、潤滑油管理、靜密點管理、工藝管線管理、軸承管理、容器管理、安全閥管理進行重點描述。
  8. Thermoplastics piping systems - joints for buried non - pressure sewerage applications - test method for long - term sealing performance of joints with thermoplastic elastomer seals by estimating the sealing pressure

    熱塑管道系統.地下埋裝的非承設施用連接件.通過對密的估對帶熱塑彈件的連接件的長期密性能的試驗方法
  9. The theme comes from the project the program development for transient sealing in reactor pressure vessel. this project is the subproject of the research project commissioned by the technical industry committee, department of defense, which is about the advanced reactor design in advanced pressurized water reactor nuclear power station

    本論文來源於國防科學技術工業委員會關于先進堆核電站先進反應堆設技術研究項目(批文號:科工委[ 1999 ] 149號)的子課題「反應堆容器瞬態密程序研製」 。
分享友人