水工程建築物 的英文怎麼說

中文拼音 [shuǐgōngchéngjiàn]
水工程建築物 英文
hydrotechnical construction
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
  1. The dump vehicle is suit to load and disoharge the piled material, such as the loose soil, finc sand, fertilizsr, waste. so it can be wildly used in many fields, such as construction site, iuad maintenance, municipsl works, railroad consiruction, dock transport, brickfield, and carry in warehouse, it can be used in many cngineering construction, stch as water conservancy project, onvirenment engineering and gardens. it is the ideal shourt haul means within 1 km

    該產品適用於裝卸鬆土、細砂、肥料、垃圾、泥等成堆堆放的料,因此是廣泛用於、公路養護、市政、鐵路設、碼頭運輸、窖廠作業、倉庫搬運以及利、環衛、園林等設,是運輸半徑為1km以內理想的短途運輸具。
  2. 1 sedimentation anyslys of soil under the action of deadweight ; 2 sedimentation anyslys of structure in using ; 3 endogen force anyslys of structure in using ; 4 soil remolding type anyslys ; 5 homogenous flush works anyslys ; 6 anyslys of the structure sedimentation effects of different flushing amount at the same place ; 7 anyslys of the structure sedimentation effects of different flushing places ; 8 anyslys of the structure sedimentation effects of different horizontal flushing places ; 9 anyslys of the structure sedimentation effects of different vertical flushing places ; getting the different between the endogen force of common structure and that of slant structure. the rule of stricture sedimentation and the effect of different soil remolding type were also gained

    對掏土糾偏過做了以下9個方面的分析: 1 、土體在自重作用下的沉降分析; 2 、在使用階段的沉降分析; 3 、在使用階段的內力分析; 4 、土體受擾動類型分析; 5 、均勻沖分析; 6 、同一個地方沖量大小不同對沉降影響分析; 7 、不同沉井沖沉降影響分析; 8 、進深不同的土層沖沉降影響分析; 9 、不同埋深土體沖沉降影響分析。
  3. Review of the building standards of sanitary fitments, plumbing, drainage works and latrines regulations

    檢討生設備標準管裝置排及廁所規則
  4. 10. building standards of sanitary fitments, plumbing, drainage works and latrines amendment regulation 1997

    10 . 1997年生設備標準管裝置排及廁所修訂規例
  5. The project is 156 m dam height, 877 m normal impounded level and 760 mw installed capacity. minjiang river benches almost conversely in shajinba reach and makes the right bank a thin and weak ridge, which is a syncline geological structure

    岷江在沙金壩河段形成一個近180的河曲,使右岸形成三面被河曲圍抱的條形山脊,構造上為一完整沙金壩向斜,都布置在右岸山脊內。
  6. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體情況,採用2d - 3d -有限元結構分析序對高層與多層的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層地下開挖硐室時的設計和提供參考依據。
  7. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河庫供頭部由引渡槽、節制閘、進閘、泄閘等組成。由於本場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內流流態是否滿足要求,需要經過模型試驗進行論證,以確保的可靠性。旁通管具有上與泄要求,對其過流能力也要經試驗確定,為碧流河庫增旁通管設計提供依據。
  8. So the topic for farther discussion will be developed on the ground of soil - foundation - structure interactions, and em phasizes particularly on the investigation for dynamic effects on interaction of pile - supported structures subjected to lateral seismic load at layered - soil media. it will provide engineering application with practical and concise computational method, but also provides the aseismatic design for pile - supported structures with proper theory foundations and schemes to some extent on condition that definite codes are absent at present. the full article is divided into six chapters, as follows : 1

    本論文作將圍繞地基-基礎-上部結構共同作用這一課題作進一步探討,側重於平地震作用下層狀地基土中的樁基-的動力相互作用的研究,為實踐應用提供了適合於目的的、比較簡捷的實用計算方法,亦擬為沒有明確規范指導的樁(土)基礎-結構抗震設計提供一定的理論依據和設計議。
  9. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓流沖毛技術,大大提高了施效,減少了倉面污染;模板大量採用定型鋼模板施技術,提高了壩體混凝土成型質量和進度;在二期混凝土施區域,為免除人鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期持續高強度混凝土施系統的研究,使三峽成為名符其實的「世界一流」成為可能;三峽二期混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了的整體性和耐久性。
  10. The crackings occurred on the retaining wall and side piers of a flood gate during construction and the causations are investigated, inspected and analyzed, and then the relevant control measures are put forward based on the endangering degree from the cracks on the structure ; by which the normal operation function of the gate is guaranteed

    摘要針對某在施中擋墻及邊墩產生的裂縫,進行了裂縫特徵的調查、檢測和引發裂縫原因的分析,並根據裂縫對的危害度,提出了相應的控制措施,較好地保證閘正常運行的功能。
  11. The crackings on buildings in research areas are the result of multi - factors comprehensive action, buildings open fissure relation to the geological environment condition of the research area, such as regional stability, hydrogeologic condition, engineering geological condition, structure of building, exploitation shaking of gold ore, etc

    該研究區域房屋開裂是多因素綜合作用的結果,房屋開裂與該區城地質環境條件的變化密切相關,主要影響因素有:區域穩定性、文地質條件、地質條件、結構形式、金礦開采振動等。
  12. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施導流的等級、布置。通過力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝利樞紐採用圍堰擋汛后時段洪導流方案的合理性和經濟性,為施決策提供理論依據。
  13. Abstract : through a series of hydraulic model tests for researching actual power tunnel operation, a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage, flow velocity and pressure intensity. the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage

    文摘:針對實際中的發電引隧洞運行的各種況進行了模型試驗研究,指明要獲得良好的流流態,過各部位結構輪廓的造型應適應流流線的收縮、流速及壓強的變化;為使引隧洞在各級引流量下能安全可靠地運行,需慎重確定洞內消能的體形和尺寸。
  14. Erosion action of erosion media on concrete is easily occurred in hydraulic structure diversion works and immersed underground structure

    侵蝕介質對砼的侵蝕作用,易發生在、引以及浸沒在地下位以下的各種砼的地下構中。
  15. The technological innovation and optimum design were implemented by the design organization during the working drawing period, as a result, the new technology of separated floor for draft tube bend is applied, and the optimized arrangement plan of structure is more compact, the structure form is more rational, rate of progress is accelerated, about 1. 37 hundred million yuan is saved, which is of significant general benefits

    詳圖階段,設計單位根據創節約型社會的宗旨,積極開展一系列技術創新和優化設計作,並首創了廠房尾管肘管段分離式底板新技術,優化設計后樞紐布置更加緊湊,結構形式更為合理,加快了施進度,節約投資約1 . 37億元,綜合效益顯著。
  16. Energy dissipation and erosion control of stepped overflow structure on key dam of gully correction

    治溝骨幹臺階式泄的消能防沖研究
  17. According to the need of design code for anti - seismic of engineering constructure, the bedrock peak acceleration rate and response spectrum of exceeding probability of 63 %, 10 % and 2 % are given respectively and seismic motion parameters are also calculated, which will provide the evidences for anti - seismic design of this electric power equipment station

    抗震設計規范要求,分別給出了50年63 % 、 10 %和2 %超越概率平的基巖峰值加速度及反應譜,計算出地震動參數,為該電力設備站設提供了抗震設計依據。
  18. Dtu 65. 10 - building works - piping used for cold and hot pressure water and piping for evacuation waste water and rain water inside buildings - general rules of execution - part 1 : technical specifications

    Dtu 65 . 10 ..內雨和廢排放用加壓冷熱管道.通用排放規則.第1部分:技術規范
  19. With import and export rights, the international exhibition, investment and financing, and other qualifications, mainly in the following areas : petroleum, chemical engineering ; paints, rubber and plastics. surface treatment ; energy, metallurgy, iron and steel ; wood ; medical, maintenance, pharmaceutical, medical ; textile and leather ; electronic components instrumentation ; communications, radio and television equipment, media programs ; hvac refrigeration, building materials, engineering and construction ; security, protection, fire ; hardware, tools ; iec electrical, lighting ; lamps and accessories, supplies and maintenance ; environmental protection, water treatment ; machinery and equipment industry ; paper, printing and packaging ; logistics ; secondary transfers ; gifts, toys, jewelry ; food, beverage, forestry, animal husbandry and fisheries ; household goods, hotels, beauty care ; it equipment, digital products, software ; office of books, educational equipment ; sports, leisure, sports goods ; wearing apparel, shoes, and hats, bags ; household appliances, audio - visual equipment, professional lighting ; international exhibitions ; transnational agent ; business services, advertising and other areas of international trade, international investment and financing

    具有進出口權、國際會展權、投融資等資質,目前主要從事的領域有:石油、化;塗料、橡塑、表面處理;能源、冶金、鋼鐵;木材;醫藥、保養、制藥、醫療;紡織、皮革;電子元器件儀器儀表;通信、廣電設備、傳媒節目;暖通製冷、材、;安防、防護、消防;五金、具;電電氣、照明;汽摩及配件、用品、維修;環保、處理;機械及行業設備;紙業、印刷、包裝;流;二手轉讓;禮品、玩具、珠寶首飾;食品、飲料、農林牧副漁;家居用品、酒店、美容護理; it設備、數碼產品、軟體;辦公圖書、教育裝備;運動、休閑、體育用品;服裝服飾、鞋帽箱包;家電、影音設備、專業燈光;國際性展覽會;跨國代理;商務服務、廣告等領域的國際貿易、國際投融資。
  20. At present, many fields remain to further research, especially the profound combination of gis technique with ece ( estuarine and coastal engineering ), which should be developed for the purposes as follows : ( 1 ) to serve the huge comprehensive work in changeable natural conditions and difficult construction conditions which takes a long period and covers a large region, e. g. the regulation work of deepwater channel in the yre ( yangtze river estuary ) ( 2 ) to combine the gis with applied numerical model ( 3 ) to study the hydrodynamic processes and characteristics of waves, tidal currents and sediment transport, as well as the affection carried by the regulation work in an estuary ( 4 ) to monitor and to analyze ees ( evolution of erosion and sedimentation ) and the variation of riverbed ( 5 ) to play a role of dynamic supervising of a engineering project

    目前尚有許多有待進一步研究的領域,尤其是以服務于長江口深航道治理這樣規模大、周期長、影響區域廣、自然條件復雜、施情況多變的國家重點為目的,將gis與專業應用數學模型結合,對河口海岸波浪、潮流、泥沙運動的動力機制,以及整治對其影響的研究,對入海航道沖淤和河勢演變的監測分析,對施進展和效果實現「動態」監控和管理,尚缺乏同gis技術的深入有效結合。
分享友人