水平支桿 的英文怎麼說

中文拼音 [shuǐpíngzhīgǎn]
水平支桿 英文
horizontal strut
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : 桿名詞(桿子) pole; staff
  • 水平 : 1. (跟水面平行的) horizontal;level2. (達到的高度) standard; level
  1. All programmes aim to prepare the students for entry into a wide range of careers in golf related fields such as pga club professionals subject to playing ability, golf ball and golf club manufacturers, golf coaching, golf and facility management and golf science support and training

    專業球手俱樂部取決于學生的高爾夫,高爾夫球和高爾夫球製造公司高爾夫培訓指導高爾夫和設施管理以及高爾夫科學持和培訓。
  2. The biggest difference from the usual down bearing arch structure lies in this points that the four tectonic cracks on its two down beans ca n ' t constrain the level forces

    它與常規的下承式拱架承結構的最大區別在於它的兩道下弦設置了四道斷縫,從而使下弦失去對拱腳力的約束作用。
  3. Insulators and fittings for overhead lines arming for horizontal arrangement of wires on strutted wooden poles

    架空線路用絕緣子和器材.金具.木電上的布線用帶撐的橫擔
  4. Firstly, for the system of moulding board and support frame in construction the side pressure and screws are analyzed. the material and structure form of support frame are discussed. the design of support frame uses the method of limited state, and also it analyses the integer stability, part stability, and single stability, and then proposes the load analysis of multi - level support frame

    首先,針對轉換層梁模體系及撐架施工,重點分析了轉換層結構現澆混凝土對模板側壓力值及模板對拉螺的計算;討論了轉換層撐體系的形式及構造,詳細論述了基於極限狀態設計的撐架計算方法,包括縱橫向的強度驗算、立的整體穩定性、局部穩定性、單肢件穩定性等驗算,並提出了多層撐架的施工荷載計算方法。
  5. These measures included the slope horizontal displacement monitor, the supporting structure swag monitor, the subsidence monitor, the pre - stress of anchor monitor, the ribbed beam steel stress monitor. we monitored the whole process and got feedback information in time, so the trend and development of slope " s displa

    在施工過程中,我們採取了邊坡穩定性安全監測措施,主要包括邊坡位移觀測及護結構撓度觀測;沉降觀測;以及錨應力監測;助梁鋼筋應力監測等。進行全過程的檢測並及時反饋信息,隨時掌握邊坡的位移趨勢與發展。
  6. The data from xinbi high - slope shows that it ' s a stable slope. 3. the result of elasto - plastic finite element analysis shows that : ( 1 ) excavated - slope face would induce loose belt in rock ; ( 2 ) horizontal ground stress, joined rockmass and weak sandwich would make great unfavorable influence on slope stabilization and axial force of rock bolt

    有限元數值分析結果表明:邊坡的開挖會使坡面巖體產生松動帶;構造地應力、結構面、軟弱夾層對坡體穩定及護在坡體上的錨的受力情況有較大的不利影響。
  7. The emphasis is given on the studying of the horizontal displacement on the retaining structure consist of piles and anchors, which is a frequent type of retaining structure. it is founded that the rigidity of anchors and magnitude of pre - stress are the main factors which influence the deformation of retaining structures. the optimal design method on pile - anchor systems is presented

    樁錨護是一種常見的基坑護模式,本文以樁錨護結構位移為重點,對護結構剛度、撐剛度與預應力、護樁入土深度等對樁頂位移的影響進行了分析,指出在樁錨護體系中,錨撐剛度及預應力對基坑變形的影響最為明顯,並通過工程實例加以驗證。
  8. This paper is concerned with the analysis of lateral braces for workshop columns press - bend member. in this paper, lateral braces is lateral horizon center braces

    本文研究的課題為廠房柱壓彎構件側向的分析,其中,側向指的是側向中心
  9. In many former references, the study of lateral horizon center braces is rarely presented. therefore, the study of this paper is necessary

    縱觀國內外文獻,目前對壓彎構件側向撐的研究多集中在偏心撐上,且沒有統一的結論,對側向中心的研究較少。
  10. Yuanfang brand yfd branch s cable is rational because of the structure, technology advanced person, measuring strictly, product quality is in the leading level of the same trade, but apply to distribution systems, such as house, high - story office building, tunnel, hotel, hospital, market, etc. extensively, can apply to the main pole thread and have illuminations system that branch thread requires too ( the highway, bridge, tunnel and airfield runway )

    遠方牌yfd分電纜由於結構合理、工藝先進、嚴格檢測,產品質量處于同行業領先,可廣泛應用於住宅、高層辦公樓、隧道、賓館、醫院、商場等配電系統,也可應用於主線有分線要求的照明系統(公路、橋梁、隧道及機場跑道) 。
  11. Abstract : taking a deep basal pit in wuhan as a case history, this article adopts the numerical simulation method ( finite element method ) to study the variation of pit excavation depth 、 anchor prestress 、 pile width and embeded depth of pile and their relationship with the horizontal deformation and displacement of the tiedjogglepile

    文摘:以武漢某深基坑為例,採用有限單元數值模擬方法,研究基坑開挖深度、錨預應力、樁體厚度、樁體嵌入深度的變化與其錨式連鎖灌注排樁護結構變形位移的關系。
  12. In this article, geotechnical engineering numerical analysis program flac4. 0 is used, working mechanism and main influential factor of composite soil nailing system with step excavation was calculated in detailed, contain distribution and influential factors of axial force and the max axial force in soil nails ; the variation of axial force in anchors ; the variation and influential factor of foundation pit horizontal displacement, ground surface settlement, ground surface horizontal displacement and rebound deformation

    本文採用巖土工程數值分析軟體flac4 . 0 ,對樁錨復合土釘護在分步開挖下的工作性能和主要影響因素進行了詳細的計算,分析了土釘軸力和最大軸力的分佈規律、影響因素;錨軸力的變化規律;基坑位移、地表沉降、地表位移和坑底隆起的變化規律以及影響因素的敏感程度。
  13. He dropped below me with the current, and by and by he came a - swinging up shore in the easy water, and he went by so close i could a reached out the gun and touched him

    他順著勢,在我的下面停了槳,在穩的地方劃到岸邊。他離我離得那麼貼近,我要是把槍出去,就能觸著他的身子。
分享友人