水庫容積 的英文怎麼說

中文拼音 [shuǐróng]
水庫容積 英文
volume of reservoir
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  1. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中累的經驗和理論;利用fortran語言完善堵口工程龍口力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪、計算時段的變化、多口門、多、多閘)的龍口力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口力計算,為堵口合龍提供科學依據。
  2. Preliminary analysis of dry density of silted material in tgp reservoir in initial period

    三峽物初期干重試驗初步分析
  3. Study on distribution and calculation method of reservoir sediment dry bulk density

    泥沙干重分佈規律及其計算方法的研究
  4. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    黃河取工程的布設要考慮工程所處河段的地質文等諸多因素。如該河段上下游,泄流量、河道沖刷、淤、河床形態、流形態、冰塞、河段上游的支流匯入、洪峰、沙峰的大小、河道行洪能力的大小、周圍防洪工程的影響及對周圍環境和第三人合法權益的影響等等。
  5. For the reasons of accumulated soils and sands and the amount of precipitation, the volume in the reservoir is dynamic. if the volume in the reservoir is not dispatched correctly, it will result in the overflowing of the dam bank of the reservoir, even in the collapsing of the darn

    又是調度不可忽視的問題,而又與的橫、縱斷面、位、深有關,由於泥沙淤、降量多少等原因,量是動態的,不對量正確調度,會在大洪時,造成堤壩漫溢甚至垮壩。
  6. 1. capacity and discharge efficiency of polyacene capacitors were systematically studies and electrolyte is aqueous and aqueous solution a series of pristine sample were prepared by pyrolysis of phenol formaldehyde resin moulded with znc, this inorganic salt used together with the resin served not only as the pore - forming agent to form open pores, which grow into a three - dimensional network structure in the cured material, but also as the microstructure - controlling agent to form a loose structure dopable with bulky dopants such as bf4 and so on

    首次系統地研究了聚並苯導電材料作為雙電層電器的電極活性材料時,在系和非系電解質中的量及侖效率。用化學方法合成可溶性酚醛樹脂,加入的zncl _ 2在聚並苯的制備過程中既是成孔劑,使在處理的材料中形成三維網狀微孔,同時它又是微孔控制劑,形成能被bf4 -等體較大的摻雜劑所摻雜的疏鬆結構。
  7. Based on the analysis of satellite images of various periods, landform data and river channel transverse section evolution in the lower yellow river, the characteristics of the river channel boundary condition changes at different location are clarified as middle flood channel flood transport width and area are evidently decreased especially for the main channel with comparison to 1950s, beach area that is unimpeded before become blocked because of road, irrigation channel constructed on it, and consequently intensify high edge of beach and lowering dyke and river

    在現場查勘的基礎上,通過對丹江口和小浪底攔沙初期下遊河道演變、排洪能力變化特點的對比,分析了黃河下游防洪面臨的新形勢:小浪底攔沙初期,下遊河道發生沖刷,但艾山以下窄河段沖淤變化不大,近年來形成的淤萎縮的狀況難以很快改觀,游蕩性河段調整劇烈,工程出險機遇增大,河道位流量關系中流量以下部分同流量位明顯降低,中流量以上部分位降低幅度可能會明顯偏小,防洪形勢仍不樂觀。
  8. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽泥沙淤入手,分析泥沙淤特性和區圍墾堤開發利用淤灘地的現狀,對防洪安全及工程安全的影響、侵佔大量的有效調蓄、造成同級流量下位抬升上延、對沿岸及過河建築構成影響、因位抬升致使區周邊灌區地下不暢乃至倒灌而造成土地鹽堿化、對區大量淤灘地無序圍墾造成旅遊資源破壞等五方面影響的定性分析,提出區圍墾堤是位抬升的重要原因。
  9. To meet the demand of the electric system, the basic regulation rule of this project is a daily regulation : it pumps once ( in late night early morning ) and generates electricity twice ( in morning and evening ) in every day

    根據電力系統的要求,該工程為日調節,即每天抽一次(每天凌晨) ,發電兩次(上午和晚上兩次用電高峰期) 。設計中存在泥沙淤引起的永久損失問題。
  10. On the one hand, the sediment density current often does a great harm to the reservoir, and causes a big loss of reservoir ' s storage capacity or makes reservoir severe deposition ; on the other hand, sediment outflow by density current is an effective measure to mitigate sedimentation

    異重流(本論文中主要指因含沙量的差異而形成的渾異重流)一方面常常給帶來嚴重的危害,加速的淤的損失;但另一方面它又為排沙提供了一種極為有效的途徑? ?異重流排沙。
  11. The first part mainly introduces the gis concept and contents of gis, the comparison between the related software and gis, the present condition and development trend of gis etc, then introduced how to use the gis technique in a specific way such as using the method of " the half - automatic to follow " to turn the map into arithmetic figure, using the method of " the automatic calculates " gets the length of the line and area of field etc, at last got the length and width of every cross section of the fabiela river which is located downstream of xiangshan mountain. this method is superior and time - saving comparing with collecting data on the spot, having important and actual application worth

    第一部分主要介紹了gis的概念和研究內, gis與相關軟體的比較以及gis的現狀、發展趨勢、當前gis研究的熱點等等,然後具體介紹了用gis的相關技術如:用「半自動跟蹤」方法對地圖進行數字化,用「自動量算」方法得到線對象的長度、面對象的面等,最終完成了象山下游法別拉河河道地形數據資料的提取工作,這種方法與人工實地採集工作相比,有較強的優越性和重要的實際應用價值。
  12. Sediment silt up in reservoir is one of the important contents in key water control project, research on the effect and surrounding environment effected by patterns of enclose tideland for cultivation in key water control project, which has risen concerns of lots of departments

    泥沙淤利樞紐工程研究的重要內之一,青銅峽區淤后灘地的圍墾利用方式對利樞紐工程的安全運行、效益發揮以及對周邊環境的影響分析研究已引起各方面的關注。
  13. The resulting increase in volume of water in tai hu and xin anjiang reservoir in blue colour was clearly evident by comparing the two high - resolution satellite images, one taken before mindulle and one after

    在比較兩幅拍攝于蒲公英掠過前後的高解像度衛星圖像,清楚顯示太湖及新安江藍色地區的增加。
  14. The resulting increase in volume of water in tai hu and xin anjiang reservoir ( in blue colour ) was clearly evident by comparing the two high - resolution satellite images, one taken before mindulle and one after

    在比較兩幅拍攝于蒲公英掠過前後的高解像度衛星圖像,清楚顯示太湖及新安江(藍色地區)的增加。
  15. The sediment problems of this project in design is that the deposition of sediment causing the permanent loss of reservoir capacity. the measure of enlarging the discharging of water and sediment can reduce deposition, but the concentration of sediment is bigger and much sediment passes through the pump - turbines

    減少損失,加大排沙量,會造成在發生洪時期內含沙量加大,抽時會有更多的泥沙過機,機組因泥沙而磨損。
  16. The reasons of wreckage of the reservoir are as follows : the inadequate, inefficient and outdated information about the reservoir, the lower anti - flood standard and the supervisor ' s ignorance of the reduction of reservoir capacity owing the a accumulated soils over years. so setting up the 3d model of danjiangkou reservoir : and mastering relevant information on water resources matter significantly not only to the dispatch and regulation of danjiangkou reservoir, but also to the forthcoming project of " water in the south to the north "

    失事的原因多為:文資料不足和未及時掌握有關的文資料,信息滯后,選用的防洪標準偏低;運行多年,內泥沙淤使有效大幅度減少而管理者對此又未及時掌握等。可見建立丹江口三維模型,及時掌握有關文資料,不僅對丹江口的調度和管理,而且對即將實施的南北調都有著深遠的意義。
分享友人