水庫斷面 的英文怎麼說

中文拼音 [shuǐduànmiàn]
水庫斷面 英文
reservoir range
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 斷面 : section; fracture surface; plane of fracture
  1. The daling river is a river of much bedload. the average of the loss sand can reach 21434. 3 thousandston, and the ratio is 18. 08 kg / m3. to this day, the ratio of sandiness by measuring in the biggest broken surface is 172 kg / m3. the baishi reservoir lies in the city named beipiao which in the middle reaches of the daling river in liaoning province, the income of the reservoir from the trunk stream is 11457 thousandston, and from the branch of the river is 1160 thousandston

    大凌河是個多沙河流,多年平均懸移質輸沙量可達2143 . 43萬噸,平均含沙量為18 . 08kg m ~ 3 ,實測最大含沙量為172kg m ~ 3 ,白石位於大凌河中游的遼寧省北票市,年入沙量,幹流為1145 . 7萬噸,支流?牛河為1160萬噸。
  2. First, according to measured data and literature, the river channel evolution rule and its reasons in the southern branch of the yangtze river are discussed from the perspectives of historic evolution, recent evolution and the tendency prediction of river channel evolution. besides, the local reservoir has been studied from the changes in thalweg and section as well as the calculation of local erosion and deposit. consequently, the stability and feasibility of reservoir construction in the river section are approved

    首先根據大量實測資料及文獻資料,就歷史變遷、近期演變、河演趨勢預測等方,初步探討了長江口南支河段河道演變規律及原因,並具體就深泓線的變化、主槽變化、局部沖淤計算等方對擬建局部區域進行了分析,論證了工程河段建設的穩定性及可行性。
  3. ( 4 ) the enclosing tideland for cultivation around the reservoir situated at 18 section in the reservoir or the " bird island " near it

    ( 4 )區的圍墾,位置在區18或其附近的「鳥島」處。
  4. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為板堆石壩的設計和研究提供參考與借鑒
  5. ( 5 ) the maximum water level risen by the enclose tideland cultivation around the reservoir is 0. 66m, the responding quality is 2000mvs, which heavily effect the environment around the reservoir. the reservoir " s water level is risen because cross section and flood canal become narrow, which caused by building dam, this makes groundwater unsmooth, drainage, even flow from a lower to a higher space and soil salinized

    66m ,且為2000m 』兒的常年洪,對區周邊環境的影響較大,因打壩築堤縮小過和行洪通道造成位進一步抬升,致使區周邊灌區地下不暢,乃至倒灌,型成士地鹽堿化。
  6. In addition, the article shows the possible site which maybe generate induced earthquake according to fault activity and the site where faults pass in reservoir region, reservoir depth and rock hardness etc

    另外,從層活動性及裂所通過的位置、深度及巖石堅硬程度等方,分析出可能產生誘發該地震的位置。
  7. Analyzing the propagation behaviors for open and close crack, the author gain that normal fault is more dangerous to earthquake than reverse fault and glide fault. 3. appling fracture mechanics to discuss reservoir - induce earthquake mechanism, the author observes the characteristic of surface crack and gains the stress intensity factor induced by the pressure of rock, water and osmosis

    針對層為表裂紋這一特點,研究地震的裂特點,得出地應力作用下的應力強度因子、作用下的應力強度因子和滲壓作用下的應力強度因子以及它們的應力強度因子之合,並且合理的解釋了構造型地震的誘發機理。
  8. Water acts as triggering roles in ris, and the roles include several respects as follows : ( 1 ) change the stability of faults

    誘發地震中,體只起到觸發作用,其誘發作用體現在幾個方: ( 1 )改變層的穩定性。
  9. For the reasons of accumulated soils and sands and the amount of precipitation, the volume in the reservoir is dynamic. if the volume in the reservoir is not dispatched correctly, it will result in the overflowing of the dam bank of the reservoir, even in the collapsing of the darn

    容又是調度不可忽視的問題,而容又與的橫、縱位、深有關,由於泥沙淤積、降量多少等原因,量是動態的,不對量正確調度,會在大洪時,造成堤壩漫溢甚至垮壩。
  10. Based on in - situ investigation, indoors soil tests, data process and calculation analysis for chunhua reservoir, this article acquires the distributing regulation and physical & mechanical properties for each layer soil below the dam base, and further determines typical model cross sections for static & dynamic stress deformation analysis

    本文根據對純化進行的現場勘察、室內土工試驗、室內資料處理、計算、分析獲得了壩基以下各土層的分佈規律及物理、力學性質指標,進而確定靜、動應力變形分析的典型
  11. With practical engineering examples, this paper describes the application of gpr to engineering investigation of such harmful geological structures as karst, faults and fractures

    摘要結合貴州福泉下翁溪、芙蓉江沙阡電站、冗各電站3個工程實例,介紹探地雷達勘探在巖溶、層破碎帶等不良地質構造勘察方的應用。
  12. Adopting the actual county - grade database of land use firstly founded in china, combining with the comprehensive influential factors of land use change, using the correlative statistic software and the mathematic analytical methods ( principal component analysis, gray relating analysis, multivariate time series markov chain analysis, multivariate regression analysis, gm ( 1, 1 ) gray model, gray series gm ( 1, n ) model methods etc ), this paper analyses the dynamic change of land use and driving force in jiang ' an county qualitatively and quantitatively. the results indicate : 1 the land resource per capita and the area of single - land - use type in jiang ' an county are not prior to other places in yibing city or sichuan province. however, the terrain is dominant in choosing the way of land use

    本文採用全國首批建立的「縣級土地利用現狀數據」的基礎數據,結合影響土地利用變化的經濟、社會、環境等綜合因素,採用相關分析軟體( dps 、 spss )和數學分析方法(主成分分析、灰色關聯度分析、多元回歸分析、多元時空序列馬爾柯夫鏈分析、 gm ( 1 , 1 )預測模型分析、灰色序列gm ( 1 , n )模型分析等方法) ,對江安縣土地利用變化及其驅動力進行定性、定量研究,研究結果表明: 1江安縣人均總的土地資源數量和單一土地利用類型的數量在宜賓或四川省區域內均無優勢;地形對土地利用方式的選擇起著主導作用;土地利用變化的總趨勢是:耕地、林地、交通用地和積不減少,居民點及工礦用地和未利用地積不增加;景觀多樣性指數呈現「 」趨勢。
  13. The comparison between the experimental data with numerical simulation show that the model have a higher precision in the lateral scouring and sedimentation deformation, time interval quantity of deposition, and output sediment concentration process during sand peak at various cross section and is applied fairly good to practical engineering

    青銅峽的實測資料對模型驗證結果表明:模型在不同橫向沖淤變形、時段淤積量、沙峰期出含沙量過程都具有較高的精度,能較好地運用於工程實際。
  14. The usual measuring method, that is, to use the water temperature of 1 meter under water surface to adjust the spinning speed of the sounding device, will result in greater measuring errors. this article put forwards the mathematical model of water temperature with the vertical water temperature that was measured at the deepest site of six sections. after adjusting the sounding device w

    本文依據實測的6個深泡點處的垂線溫建立了溫輔助測深數學模型,依據該模型即可得到保證回聲儀測深精度的溫值,用該溫值校正回聲儀后,便可得到對應于各起點距處的深值,從而解決了丹江三維模型建立的關鍵問題。
  15. The 3d model needs three parameters, among them, the distance from the dam and the distance from the starting point of the section can be measured directly, and the depth of the water corresponding to the distance from the starting point of the section can be measured by the sounding device. however, because the reservoir is very deep, the measuring error of the water depth is greater

    而建立其三維模型需要三個參量,其中距壩里程、備起點距可直接測得,而對應于各起點距的深值因丹江口較深,按通常的方法使用回聲儀測深,即以下二米處的溫校正回聲儀的轉速來測深有較大誤差。
  16. However, the geologic structure of the carstic formation is complicated and the design, construction, quality testing method of the high - pressure grouting is developing rapidly. we have engaged lots of experiments and studies in xiangshuiriver reservoir on this subject. one of the purposes subject is to guide the design, construction of the curtain grouting in the xiangshuiriver reservoir and optimize the grouting design, the other is to be a reference example for other similar engineering

    但由於巖溶地質條件的復雜性,且高壓灌漿作為一項技術和工藝,在設計、施工、質量檢驗及效果評價等方,仍然處在不發展的過程中,正是基於以上兩個方的考慮,本課題結合響高壓帷幕灌漿工程進行了大規模的試驗研究,一方指導帷幕灌漿的設計與施工,達到優化設計方案的目的;另一方對試驗資料進行分析研究,以期對同類工程有所助益。
  17. The rigid limit equilibrium computation and finite element computation have been performed which concluded that the integral stability coefficient of no. 2 landslide shall be the minimum value when water level is 2145m a. s. l., then the coefficient increases slightly as the reservoir water level rises up, there exists, however, a fact that the stability coefficient of local section may tend to decrease continuously along with the rise of reservoir water level

    進行了剛體極限平衡計算和有限元計算,證明號滑坡的整體穩定系數在2145m位時最低,在此位以上,將隨位升高而略增;但局部穩定系數有隨位升高而不下降的情況。
  18. 5 ) to solve the uncertain modeling problem about hydraulic buildings, a new modeling method named aggregation modeling based on graph object technique is put forward. as a result, the graph model of solid gravity dam is designed. the graph object of water _ proof dam section taken as an example, the design and implement of self defined graph object is discussed

    5 )根據工建築物不定型建模的特點,提出一種基於圖形對象技術的聚合建模方法,詳細討論了聚合建模法的基本原理;設計了實體重力壩的圖形對象模型,並以擋壩段圖形對象的設計為例,研究了自定義圖形對象的設計和實現;基於objectarx的通知? ?反應機制,採用數據反應器和對象反應器,建立了圖形對象的互動操作機制;以擋壩段優化設計為例,研究了圖形對象和分析、計算功能的集成方案。
  19. 4, it has shown, through the study on the temperature modeling of ertan reservoir, that the location of upstream boundary can not be placed on the section with a great temperature gradient in vertical, because the water temperature distribution at upstream boundary can control the temperature structure in reservoir

    4 .在二灘溫模擬研究的基礎上對入口邊界的設定作了初步的研究,認為入口邊界不適宜選擇垂向溫度梯度較大的。這是因為入口溫垂向分佈基本控制了溫的分層狀況,而且入口邊界的速度和溫度條件的不匹配會導致較大的誤差。
  20. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)電站是黃河幹流上的一個梯級電站,為了減少征地移民損失,經對炳靈電站(塔坪壩址)尾在劉家峽不同運行方式下的位與流量關系進行分析研究,在總裝機和年發電量基本不變的情況下,充分利用劉家峽汛限位,將電站樞紐選址在其電站尾內。
分享友人