水槽作用 的英文怎麼說

中文拼音 [shuǐcáozuòyòng]
水槽作用 英文
sink action
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (盛牲口飼料或飲料等液體的器具) trough; manger (for water animal feed wine vat) 2 (兩邊...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • 水槽 : water channel; trough; pentrough; mantle; water slide (運木材用); cistern; scoop channel; gulle...
  1. Through the study above, a refined description and modeling to flow field and water surface near the groyne in river is conducted with 2 - d and 3 - d mathematical models. the results by simulation are consistent well with experiment data

    通過上述研究,者採二維和三維數學模型對試驗和天然河道中丁壩附近流場和面形態進行了精細地描述和模擬,計算結果和實測結果吻合良好。
  2. Abstract : introduced in the following are the main structure and the main specifications of the hi - speed slot lathing machine for pins. suggestions are put forth for the feed - in parameters, constant speed lathing, and the lathing parameter for the hard alloyed blade, for the machine ' s main and assistant operation. promotion is made to quality of product and process of chinese lathing machine for knitting pins

    文摘:介紹了國內研製的織針高速銑機的主要結構特點、技術參數,並通過生產使提出對該機主輔加工進給參數、勻速切削,以及硬質合金刀片切削參數的改進意見,將為國產織針銑工藝平和織針質量的提高產生積極的推動
  3. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡進行安全性能和抗震性能評估后表明: ( 1 )渡除肋拱頂面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度要求; ( 2 )從承載力方面看,在風荷載、地震下,肋拱基本滿足要求,個別排架橫梁不滿足要求,肋拱連系梁普遍不滿足要求;計入平橫向地震的工況為設計控制工況。
  4. At present, whereas so many reasons such as its using function changing from irrigation to city water supply, the increasing of importance, the original design standard on the low side, the damage and aging of structure, the demand for seismic fortify in strong earthquake region and offering data of technical alteration for adding flux aftertime, it is important for safety and seismic capability of this aqueduct bridge

    目前,該渡使功能由灌溉輸改為城市供、實際重要性提高、鑒于原設計標準偏低、結構的病害和老化破損以及地處強震區對抗震設防的要求,為日後加大流量進行技術改造提供依據,因而急需對渡較詳細的安全可靠性評估和抗震性能評估。本文針對該渡進行了原位現場檢測,並對其進行結構分析計算和結構的安全性能與抗震性能的評估等方面的工
  5. The dissertation is mainly including four section : the first is the experiments done in the tank, which will supply the reliable information of imaging data ; the second is image edge detection by the use of the art of the zernkie moments, which is used to detect the liner and threaded edge of the object, the third is the underwater camera calibration technique, the forth is automatic positioning the location of the camera by used of the art of cross - ratio, the result of which is satisfied

    本文工分為四個部分:第一部分是實驗部分,它為后續的工提供了可靠的圖像數據信息;第二部分是基於zom距的直線、曲線邊緣提取技術及相關的與處理技術;第三部分,下攝像機標定技術研究,基於改進的tsai演算法,採逐步分解的標定策略。並探討了一種相對簡單的、靈活的標定技術;第四部分是攝像機定位技術研究,採具有平移不變性的交比進行攝像機定位,模擬試驗的最大誤差不超過2 ,效果還是令人滿意的。
  6. By means of the study the main results are listed as follows : ( 1 ) the results of flume experiment and simulated rainfall experiment with a fixed intensity indicated that, the influencing degree of rainfall on overland flow velocity had something to do with the runoff discharge above and rainfall intensity

    通過研究取得了如下結論: ( 1 )試驗和定雨強模擬降雨試驗結果表明,降雨對坡面薄層流流速的與放流量和雨強大小有關。
  7. The flow - measuring system adopts the khafagi flume as the first sense organ to realize the flow / head signal conversion. the head signal is picked up and converted into voltage signal by the buoy - level mechanism and the magnet - resistant angle measuring sensor

    該流量測量系統採卡發基為一次敏感器件實現了流量位的信號轉換,並通過浮子?杠桿測量機構和磁阻式角度傳感器對位信號進行拾取並轉化為電壓信號輸出。
  8. Abstract : monthly rainfall data from 1951 to 1995 for june, july and august in 13 meteorological stations of the north china were used for accounting z index and discussing serious flood and drought featureas in these months. serious flood mainly happened in july and august, and sevious drought mainly happened in august. there were more flood in 1950 ' s to 1960 ' s and more drought since 1970 ' s in the north china. meanwhile, the deeper trough which covered the regions from the ural mts. to the balkhash lake play an important role in serious rainstom in rainy season in the north china. there often happened serious flood ( drought ) when the northwester pacific subtropical high was by west and north ( east and south ), and the sea surface temperature in the equatorial central and eastern pacific was mainly in dropping ( raising ) stage

    文摘:利華北平原地區的13個站點, 45年( 1951 1995 )的降資料,對夏季4個時段( 6月、 7月、 8月、 6 8月)進行了z指數計算,確定了該地區各個時段的嚴重澇年和嚴重旱年.發現華北地區雨季的嚴重洪澇主要集中在7 , 8月,嚴重乾旱則主要發生在8月,並可明顯看出由50 60年代的多期向70年代中期以後的少期的轉變,另外,烏拉爾山到巴爾喀什湖附近的低壓加深和西北太平洋副熱帶高壓的北抬,對華北地區雨季持續性暴雨的產生起著決定性的.嚴重洪澇年的夏季( 6 8月) ,西北太平洋副熱帶高壓偏西、偏北,赤道東太平洋海溫多處于下降階段;嚴重乾旱年西北太平洋副高偏東、偏南,赤道東太平洋海溫則處于上升階段
  9. Liquid sloshing in the tank caused by the horizontal acceleration that didn ' t be discussed in other type of structures

    內液體受平加速度時會造成晃動波,在儲耐震設計中有加以分析,並考慮壁的液體動態壓力。
  10. If pre - drilling mode was taken in an offshore oil development, pgb - free well drilling technology might be adopted for supplementary wells when the pgb slots were totally occupied

    摘要採預鉆井方式開發的海上油氣田,對下鉆井基盤鉆井完后增鉆的調整井,可採無基盤鉆井方式業。
  11. Finished the following important consulting projects in recent years : ( 1 ) to take charge of and participate in the design of the project of 25 thousand - ton petrol and gas quays of the jiangyin petrol company. ( 2 ) to take charge of and parricipate in the design of the project of 25 thousand - ton petrol and gas quays of zhang jia gang hada company. ( 3 ) to organize the feasibility study on the coastal engineering test hall construction project of nhri. to take charge of and participate in the design of the hall ( a large - size wave basin, 70m long and 50m wide. was constructed in it ). ( 4 ) to organize the project feasibility study of the laboratory of nhri for the basic law research on sediment transport, to take charge of the design of the project, and to participate in the design of the wind and wave flume ( 180m long ), in which the scientific research projects of waterway training works and coastal engineering structures can be carried out under the combined action of wind, wave and current

    近幾年來主要完成以下幾項重大工程: 1 .主持並參與江陰石油公司2 . 5萬噸級油氣碼頭的設計; 2 .主持並參與張家港哈德公司2 . 5萬噸級油氣碼頭的設計; 3 .編寫了南京科院海岸工程試驗廳可行性研究報告,主持並參與該試驗廳的工程設計,在該試驗廳內建有70米長50米寬的大型波浪池; 4 .編寫了南京科院「泥沙運動基本規律研究實驗室」工程可行性研究報告,並主持該項工程設計,參與完成180米長風浪設計,該建成后,可在風、浪、流綜合下進行航道整治和海岸工程的科學研究。
  12. According to dou guoren ' s similarity theory of total sediment transport modeling for estuarine and coastal regions, a generalized physical model of the north - trough of the yangtze river estuary deep channel is designed

    摘要根據竇國仁波浪潮流共同下的全沙模型相似理論,設計了長江口深航道北概化物理模型。
  13. On the basis of the current situation, and relevant environment of the development of the corporation and its industrial characters, the author submits three models of the development of the corporation in the future : improving hydroelectric power and undertaking continuous development strategy, adjusting the structure and expressing more advantages of electric client, putting up the " natural cao yu tan " and make the further promotion of the comprehensive image and benefits of the company

    第四部分,公司未來發展分析。根據當前面臨的形勢,從公司發展和自身的產業特徵出發,提出了公司未來發展的三種思路:發展電,實施可持續發展戰略;調整結構,產業升級,進一步發揮電冶產業鏈的:建設「生態漁灘」 ,提升公司整體形象和效益。
  14. This dissertation describes the studying of the whole construction of water - saving irrigation expert control system, the realization of hardware and software and low - cost soil - moisture sensor which is needed for water - saving irrigation. the distributed control system based on bus. according to real - time data of soil - moisture, water - level of sump, pressure of tube, etc. and irrigation knowledge in expert knowledge bases, it can make decisions such as when to irrigation, the water quantity to irrigation and the cost and benefit of the irrigation

    本文對節灌溉專家控制系統的總體結構、軟硬體實現以及節灌溉急需的低成本土壤分傳感器進行了研究,系統採了基於總線的分散式控制結構,根據實時檢測的土壤分、位、管道壓力等實時參數,知識庫的物灌溉知識,分析決策灌時間、灌量、灌溉成本及灌溉效益。
  15. Calculation of force bearing on tongue - grooved section joints of piled wharves under action of concentrated transverse force

    高樁碼頭在橫向集中平力下齒的受力計算
  16. The results show that the weather process occurs because of typhoon trough with cold air, deep upper trough ; the southeast low - jet by typhoon transported large water vapour and great energy of instability to heavy rainfaill area ; cold air, lower convergence and upper divergence by deep upper trough lead to development of the east - ocean low pressure and occurd strong wind

    分析結果表明:這次天氣過程是由臺風倒和冷空氣及深厚的高空共同引起的;臺風環流引起的東南低空急流為暴雨區輸送了大量的汽和不穩定能量;冷空氣的侵入加上深厚的高空引起的低空輻合、中高層輻散,促使了東海低壓的劇烈發展,產生了猛烈的大風。
  17. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋石壩損毀情況的現場調查資料,結合有關專家多年的整治經驗,總結出壩體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋石壩的直接損毀現象,結合山區河流的流、地形特點,利塊體粒徑與起動流速的關系,提出塊體穩定重量與起動流速高次方成正比的概念,流速50的增長可能導致塊體穩定重量接近40倍的變化;通過二維變坡試驗,研究了壩體穩定的主要影響因素,包括塊體重量、壩頂深、斷面尺寸、塊體材料(塊石和卵石兩種) 、護底等,結果表明對于山區河流,試圖僅僅通過增加壩體單個塊體重量或斷面尺寸來提高壩體穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採柔性混凝土鉸鏈體等一類整體性較好的護面層為散拋石壩的防沖毀措施,以期取得良好的工程效果。
  18. Flume experimental study on the loss of dredging spoiling under the action of wave and current

    波浪下疏浚拋泥損失的實驗
  19. By analyzing existing flow measurement methods, several economic methods which are suitable to online meter and measure flow in the plain irrigation are chosen

    本文通過分析現有的流量測量方案,選擇閘門、泵站、量為量設施,並分析了這幾種測流方法的流量計算原理。
  20. The different drawbacks in the original design and construction of the emergency gate slot of the releasing tunnel of zhelin hydropower station in jiangxi province resulted in the disjunction of most slot corner plates under the parapet walls of two sides of the left hole and the damage of the second - phrase concrete in these slot corner plates, after the gate is closed and under the action of seepage water pressure

    江西省柘林電站泄空洞檢修門,由於原設計和施工均存在不同的缺陷,致使閘門關閉后,在滲透下,造成左孔兩側胸墻以下大部分門護角板被擠壓脫開,護角板裏面的二期混凝土損壞。
分享友人