水泥槽 的英文怎麼說

中文拼音 [shuǐcáo]
水泥槽 英文
cement tub
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • : 名詞1 (盛牲口飼料或飲料等液體的器具) trough; manger (for water animal feed wine vat) 2 (兩邊...
  • 水泥 : cement; -lith
  1. Railway fixed equipment. prefabricated barbican ditch elements, in reinforced concrete

    鐵路固定設備.鋼筋預制構件
  2. Experimental study on cohesive sediment in ring channel

    粘性沙環形實驗研究
  3. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小疏浚挖的回淤量,必須依靠控制上游來沙量、調整入口門位置、加設防淤堤及提高庫位等手段,而不能通過調整挖寬度、位置及數量等措施來達到目的。
  4. Hsu, shaohua marko, wei - sheng yu, and tzu - ming liu ( 1997 ) " modeling unsteady turbidity currents in a steep narrow reservoir ", international journal of sediment research, vol. 12, no. 3, september1997, pp. 207 - 216, ( ei )

    許少華,王其美,劉子明( 1996 ) "明渠主深與高灘地間砂交換現象之實驗研究" ,中華土保持學報,第二十七卷,第三期,頁205 - 212 , 9月
  5. Air sliding conveyor for cement industry

    工業用空氣輸送斜
  6. Our leading products are : ball mill, superfine agitating mill, vacuum plaster agitator, slip agitator, pressure - glazing tank, shower - dedust glazing booth, vibration sieve, leakage tester for water - closet, blast heater, rapid dispersion machine, magnetic separator, base - wipe machine, electric diaphragm pump and the vertical casting unit for medium and top grade of one - piece water - closet and close - coupled water closet, wash basin, pedestal, low level cistern and sink

    公司主導產品有球磨機、超細攪拌磨、真空石膏攪拌機、釉漿攪拌機、釉漿壓力罐、浴噴釉廚、旋振篩、座便器漏檢驗機、熱風爐、座便器彎管施釉機、高速分散機、磁選機、擦坯機、電動隔膜泵及生產中高檔衛生潔具的洗面器、分體座便、聯體座便、面具柱、低箱洗滌等立澆成型機。
  7. In this paper, some characteristics of flow movement and sediment transport are analyzed by using the flume experiment data. the cross section of compound channel can be divided into four regions : the undisturbed region in main channel, the interactive region between channel and plain, the undisturbed region in flood plain and the boundary region. in the undisturbed regions, the distribution of longitudinal velocity along the depth has the feature of lograithmic. whereas, in the interactive region, the longitudinal velocity does not obey the logarithmic distribution law, but it can expressed as a revised logarithmic function by using a wake function. on the basis of the kinematic equation the velocity distribution of transverse velocity is obtained. in the boundary region, the longitudinal velocity obeys the law of parabolic distribution. furthermore, according to the simplified diffusion equation, the transverse distribution of sediment concentration in the interactive region is deduced. the analysis is in good agreement with the measured data

    本文根據漫灘流的運動特點,將漫灘流的復式斷面分為主平衡區、灘交互區、灘地平衡區及邊壁區等4個區,並給出了各區寬度的經驗公式.根據灘交互區垂線流速分佈的變化特點,提出了附加尾流函數的對數流速分佈公式.在簡化流運動方程和沙擴散方程的基礎上,對灘交互區內垂線平均流速及含沙量沿橫向分佈進行了理論分析,提出了反映灘流動量交換強度的橫向渦量粘性系數及橫向擴散系數的表達式,得到了漫灘流垂線平均流速及含沙量沿橫向分佈的解析解,並與實測資料吻合較好
  8. Wastewater treatment plants - part 15 : measurement of the oxygen transfer in clean water in aeration tanks of activated sludge plants ; german version en 12255 - 15 : 2003

    處理廠.第15部分:活性污廠的曝氣中氧氣
  9. During the trenching procedure, until concrete casting is taken, it is very crucial to maintain the stability of the trench wall, which relatives closely to geologic conditions, particle size, groundwater state, trenching skills and so on

    壁的穩定與地質結構、顆粒大小、地下情況、施工工藝等因素有著密切的關系,漿固壁是保證孔穩定最有效的方法。漿固壁的機理和壁的穩定關系分析是一個非常復雜的問題。
  10. The result shows that the trench wall failure at shallow depth is the major failure mode of the slurry - supported excavation, and that the length of the excavated trenches and the difference between the slurry head and the water level are the key parameters controlling the stability of the slurry - supported excavation

    結果表明,淺層壁失穩是漿護壁開挖的主要失穩型式,開挖段的長度和漿液面與地下位面的高差是控制漿護壁開挖穩定性的關鍵參數。
  11. In this paper, the deposition evolution process in qtx reservoir are studied, the incoming water and sediment, the operation data, and the time and space distribution of longitudinal and lateral sedimentation in reservoir are analyzed in detail, and the longitudinal scouring and sedimentation and lateral deformation law in reservoir tidal flat and mainstream under different operation way are summarized in every operation period

    本文以黃河青銅峽電樞紐工程庫淤積演變過程為研究對象,對青銅峽庫來來沙組成、庫運行資料、庫縱橫向沙淤積時空分佈等進行了較詳細的分析,總結了青銅峽庫各個運行時期不同運行方式下庫灘縱向沖淤和橫向變形規律。
  12. Finished the following important consulting projects in recent years : ( 1 ) to take charge of and participate in the design of the project of 25 thousand - ton petrol and gas quays of the jiangyin petrol company. ( 2 ) to take charge of and parricipate in the design of the project of 25 thousand - ton petrol and gas quays of zhang jia gang hada company. ( 3 ) to organize the feasibility study on the coastal engineering test hall construction project of nhri. to take charge of and participate in the design of the hall ( a large - size wave basin, 70m long and 50m wide. was constructed in it ). ( 4 ) to organize the project feasibility study of the laboratory of nhri for the basic law research on sediment transport, to take charge of the design of the project, and to participate in the design of the wind and wave flume ( 180m long ), in which the scientific research projects of waterway training works and coastal engineering structures can be carried out under the combined action of wind, wave and current

    近幾年來主要完成以下幾項重大工程: 1 .主持並參與江陰石油公司2 . 5萬噸級油氣碼頭的設計; 2 .主持並參與張家港哈德公司2 . 5萬噸級油氣碼頭的設計; 3 .編寫了南京科院海岸工程試驗廳可行性研究報告,主持並參與該試驗廳的工程設計,在該試驗廳內建有70米長50米寬的大型波浪池; 4 .編寫了南京科院「沙運動基本規律研究實驗室」工程可行性研究報告,並主持該項工程設計,參與完成180米長風浪設計,該建成后,可在風、浪、流綜合作用下進行航道整治和海岸工程的科學研究。
  13. A tool used to cut grooves indicating the joints in cement

    塗縫鏝,板用來在上刻以表示接縫的工具
  14. It is made of quality steel plate, which is stretched forming welded and plastic sprayed with bubble cement filled in its inner cavity. its pedestal is plated with zine and cast aluminum alloy, which height is adjustable and can be self - locked

    蓋板,地板採用優質鋼板經拉深成型點焊噴塑內腔填充發泡填料,支座為鍍鋅結構,高度可調並能自鎖。
  15. The application study of improved bp algorithm in sediment science - using two set of experiment data mentioned above, the value of d _ ( cmax ) and gross bed - load transport rate in non - uniform sediment with a wide distribution in flume experiment of stead sediment transportation have been forecasted by ann generator

    改進bp演算法在沙科學中的應用研究?將收集整理后的兩次試驗實測資料作為數據來源,利用生成器生成網路對平衡輸沙試驗中的最大起動粒徑和總輸沙率進行預測。
  16. The bpvo aims at regulating the standards and operation of equipment such as boilers, pressure vessels, including thermal oil heaters, steam receivers, steam containers, air receivers and pressurised cement tanks mounted on trucks or trailers

    《鍋爐及壓力容器條例》旨在對鍋爐、壓力容器等器具的標準及操作加以規管。鍋爐及壓力容器包括熱油式加熱器、蒸汽容器、蒸汽甑、空氣容器,以及貨車或拖車上的加壓水泥槽
  17. The bpvo aims at regulating the standards and operation of equipment such as boilers, pressure vessels, including thermal oil heaters, steam receivers, steam containers, air receivers and pressurised cement tanks mounted on trucks or trailers. our work and achievements in 2002

    《鍋爐及壓力容器條例》及其附屬規例旨在對鍋爐、壓力容器等器具的標準及操作加以規管;鍋爐及壓力容器包括熱油式加熱器、蒸汽容器、蒸汽甑、空氣容器,以及貨車或拖車上的加壓水泥槽
  18. A bare winter tree, a holdout on cement - bound third avenue in new york city, emerges from an unlikely square of bricks, its base encased in a protective sheath

    冬天光禿的樹,邊框里樹,暴露在零亂的廣場磚中,被保護圓套包圍著。
  19. Suction vehicles and high pressure flushers ; vehicles for cleaning severs and gullies, vehicles for cleaning pits

    吸塵車和高壓沖洗裝置.第1部分:下及沉井清理
  20. With the developing highway communications, the traffic is increasing and axle is becoming heavier and heavier, all of these demand the high quality of cement concrete pavement the experience of past ten years in highway construction shows that the practical life time of cement concrete pavement is far more shorter than anticipated. damages such as cracking are offen occurred in first serval years they caused direct and indirect economic losses and bad social influences. in addition to control overloaded vehicles by means of administration, the compressive strength, bending strength wear - ability should be improved to solve all these problems

    十幾年的高等級公路建設實踐表明,路面的使用壽命遠遠小於其設計壽命,往往在通車幾年後就出現一些病害,如坑、斷板等病害,帶來的直接、間接經濟損失和不良的社會影響。解決這些問題,除了運用行政強制手段控制超載車輛外,必須提高混凝土的彎拉強度、疲勞強度、耐磨強度、阻裂限縮能力,從而提高混凝土路面的使用壽命。
分享友人