水泵輸入功率 的英文怎麼說

中文拼音 [shuǐbèngshūgōng]
水泵輸入功率 英文
pump input
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞(吸入和排出流體的機械) pump
  • : Ⅰ動詞1 (運輸; 運送) transport; convey 2 [書面語] (捐獻) contribute money; donate 3 (失敗) l...
  • : Ⅰ動詞1 (進來或進去) enter 2 (參加) join; be admitted into; become a member of 3 (合乎) conf...
  • : 名詞1 (功勞) exploit; merit; meritorious service [deed]: 戰功 military exploits; 立功 render me...
  • : 率名詞(比值) rate; ratio; proportion
  • 水泵 : water pump; compressed water pump水泵房 pump house; 水泵缸套 hoghead; 水泵工 plugman; 水泵間 [土]...
  • 輸入 : 1 (從外部送到內部) import 2 [電學] input; entry; entering; in fan; fan in; 輸入變壓器 input tra...
  1. Pumps - rotodynamic pumps - circulation pumps having a rated power input not exceeding 200 w for heating installations and domestic hot water installations - noise test code vibro - acoustics for measuring structure and fluid - borne noise

    .旋轉動力.家用熱置裝和供熱裝置用的額定不超過200w的循環.測量結構和流體導聲的噪音試驗編碼聲振搗
  2. At first, modeling of these divvies by rate equations to obtain expressions for threshold and slope efficiency is given. on the case of this theory, the large numbers of literatures and datum are consulted, and the laser is home studied. through rationally selecting and improving the reflector surface, ensuring the beam quality, increasing farthest the absorption path, and improving effective pumping frequency ; through designing the water cooler of yag bar, the volume of laser is half the same internal and international production, and the output power is get to the extremum of the same international production

    並在此基礎上查閱了大量文獻和資料,對該種激光器進行了深的研究,通過對yag棒直徑的合理選取併合理地改進反射鏡面,從而既保證了光束質量又最大限度的增加了吸收長度,有效的提高了浦效;在不影響浦的前提下,通過有效縮短yag棒的長度減小出損耗;對yag棒的冷系統進行優化結構設計,使激光器體積減小到國外同類產品體積的一半,而已達到國外同類產品的極限值。
  3. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個工況的測試,即夏季製冷工況的測試、冬季供熱工況的測試、夏?冬過渡季測試和冬?夏過渡季測試;另外在夏季工況的測試中還進行了變流量測試,在冬季工況的測試中還進行了熱平衡測試。本文對測試數據進行了處理,計算出了冬(夏)季工況埋管吸(放)熱量、熱空調器供熱量(製冷量) 、熱空調器、埋管單位管長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱運行時地下一二層埋管進出溫度變化情形,得出地下二層埋管換熱能力優于地下一層埋管,且換熱很穩定;並分析了過渡季地下一二層埋管溫度恢復情形,得出熱系統停機一周內地溫恢復特別快。
分享友人