水石層 的英文怎麼說

中文拼音 [shuǐdàncéng]
水石層 英文
waterstones
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • 石層 : stone layer
  1. The effective adhesion of permeable base and asphalt pavement, good residence of scouring property of mixture and good drainable property are benefit for undersurface of pavement and permeable base course to keep good successive contact condition

    大孔隙泥穩定碎和瀝青面的有效聯結、混合料本身良好的抗沖刷性能和良好的排性能,有利於瀝青下面和排間接觸條件維持在連續狀態。
  2. Therefore, there will be good prospect in determination of water bearing zone and oil bearing zone, and waterflooded zone with complex resistivity log developed with rock dispersion property

    因此基於巖頻散特性發展起來的復電阻率測井技術在識別油測井評價上具有良好的應用前景。
  3. Dig jade is it leave riverbed in river valley terrace, do beach to refer to, ancient river and alluviation, diluvian gravel that fan have dig seeking and d jade gravel of the layer in front of the mountains the jade of these places is brought by the flowing water too

    挖玉是指離開河床在河谷階地干灘古河道和山前沖積洪積扇上的礫中挖尋和闐玉礫。這些地方的玉也是由流帶來的。
  4. And there is evidence of a later episode of water as well, in the material that filled cracks between broken layers of rock

    不僅如此,填充于斷裂縫隙中的物質還為晚些時期有提供了證據。
  5. Construction technique for the shallowly buried and darkly excavated tunnel on the cobble water - rich stratum

    砂卵淺埋暗挖隧道施工技術
  6. Zn - al layered double hydroxides, znal - ldhs

    硼酸根插間組成及取向結構的控制
  7. The conformation of sodium dodecylsulfate pillars in layered double hydroxides

    十二烷基硫酸鈉在間的插行為研究
  8. To counter the main reasons of piles ' displacement and inclination, i. e., 1 ) greater lodging after removal of pile cap ; 2 ) inclination of pile frame ; 3 ) driving into ballast course ; 4 ) obvious rolling of excavated mud surface, a set of effective measures dealing with deviation of marine driving are offered

    針對其中影響樁跑位和樁傾斜的主要原因,即: 1 )起帽后樁倒伏大; 2 )樁架不垂直; 3 )碎上沉樁; 4 )挖泥泥面起伏大,總結出一套控制上沉樁偏位行之有效的方法。
  9. Under that condition the strain can produce the most concentration of the bioactive compounds. the physical and chemical properties of the actibacterial compounds have been studied, the results showed the bioactive substance has heat stable, acidity and weakly alkali stable. it can be dissolved in acid water, chloroform solvent, can not be dissolved in ethyl acetate, petroleum ether, alkali water. the result of thinlayer chromatography showed the bioactive compounds can give off blue and green fluorescence in the uv light. the paper chromatography demonstrate the bioactive substance may be a new construct compounds

    研究表明,該活性物質具有較強的熱穩定性, ph 9的條件下能穩定存在,但ph 12的強堿性條件下活性物質的抗菌活性幾近喪失;活性物質易溶於氯仿、酸性、不溶於乙酸乙酯、油醚、堿性;薄析顯示活性物質在紫外光下能發藍綠色熒光等特點;由捷克八溶劑系統紙析鑒定該抗菌活性物質不屬於四大類抗生素,可能為一新的抗菌活性物質。
  10. The university was pro - active in making the well - being of the flame tree outside the station an important consideration in the improvement project. strict supervision was in place during the work so that the tree would not be affected. a gravel layer was added to provide protection for the root area of the tree

    大學積極保育火車站外的一株鳳凰木,該樹亦被列入改善工程的重要考慮因素,嚴格監控在施工期間鳳凰木不會受到工程影響,並特別用疏堆成保護,保護鳳凰木的根部。
  11. The resultant effect is spectacular : the waters spill on a series of steps, forming solid cascades and pools

    的下瀉?產生浸蝕及沉澱作用?經過無數的歲月?形成了大小白棉班狀的巖?疊疊。
  12. This article discussed the application of shear stress pairing method to evaluation dam base vibration liquefaction of earth - fill dam according to the problem that the sand and gravel layer of main dam base could be liquefied in the condition of seismic intensity grade vll in the design of nierji hydro project

    本文結合尼爾基利樞紐工程設計中主壩壩基砂礫( < 5mm含量> 30 =在地震裂度級工況下可能發生液化的問題,探討了用剪應力對比法在評價土壩壩基震動液化中的應用。
  13. Not viable, as it will have to be built wholly within rock at a level of ranging from - 65mpd to - 80mpd

    :不可行,因為必須在主平基準面以下65米至80米之間的巖建造整條隧道。
  14. In three days he had succeeded, with the utmost precaution, in removing the cement, and exposing the stone - work

    唐太斯接連工作了三天,極其小心地挖掉了,使頭露了出來。
  15. Based on the construction of the atpb test section on weifu road in kaifeng, henan, some construction experiences have been summarized to ensure the drainage effect of subsurface drainage system

    基於河南開封尉扶路的瀝青穩定碎試驗路的修築,通過對現場攤鋪碾壓的施工控制,進一步積累了施工經驗。
  16. This paper studies rock conductive mechanism through litho - electric experiment and waterflood litho - electric experiment, describes the lithology, petrophysical property and electric property of reservoir before and after watered - out, and proposes to identify watered - out zone by relative resistivity

    摘要通過對巖導電機理的研究,即巖電參數實驗和驅巖電實驗,描述了淹前後儲的巖性、物性及電性變化特徵,提出電阻率相對值法識別方法。
  17. Abstract : in some project, pebble is used in bearing stratum. for the resean of lower strengthand bad property of construction. the bearing capacity of pebble can ' t achieve the reauirement of up - structure. but the pebble soild has higher permeability coefficient and placeability. the method has remarkable economic results

    文摘:在以礫卵為持力的樁基設計中,由於其可鉆性差、易坍塌,強度相對較低,但是具有較大的孔隙率和滲透系數,可灌性較好,採用一定壓力對鉆孔灌注樁樁底礫卵持力注入泥漿液對其進行加固處理,可以較大地提高其承載力,並能取得較為明顯的經濟效益。
  18. Through grouting practice of design and construction, it is proved feasible and cheaper to use dam heavy curtain grouting technology for leakproof and bracing for foundation pit in the sandy gravel stratum

    通過一灌漿工程設計和施工實踐,說明了在含量高補給充分的砂礫卵中運用大壩帷幕灌漿技術進行基坑止和支護的可行性和經濟性。
  19. Study on structural features of asphalt pavement with drainage base level built of asphalt stabilized broken stones

    瀝青穩定碎瀝青路面的結構特徵
  20. Based on the routine test of rockfill, built indoor model experiment of it under the process of vibration compaction, the flat panel vibration machine was used to vibrate and compact the layered rockfill, the level instrument was used to observe the settlement of rockfill after vibration compaction, dynamical soil manometer was used to observe the pressure variety in the rockfill layer

    摘要在進行填料常規土工試驗的基礎上,建立填料振動壓實的室內試驗模型,採用平板振動器對填料分進行振動壓實,利用準儀觀測填料在振動壓實中的沉降量,利用動土壓力計觀測填內的壓力變化。
分享友人