水置換試驗 的英文怎麼說

中文拼音 [shuǐzhìhuànshìyàn]
水置換試驗 英文
water displacement test
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • : 動詞1. (給人東西同時從他那裡取得別的東西) exchange; barter; trade 2. (變換; 更換) change 3. (兌換) exchange; cash
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 置換 : displace; substitute; supersede; substitution; replacement; permutation; transposition; transposi...
  • 試驗 : trial; experiment; test
  1. Heat exchangers - hydronic room fan coil units - test procedures for establishing the performance

    熱交器.循環加熱間的電扇線圈裝.性能確定的程序
  2. Trough the analysis of stabilization safety on tengzigou arch dam, some conclusions are obtained in the following : ( 1 ) tengzigou arch dam is safe under normal poll level ; ( 2 ) stabilization safety factor of tengzigou arch dam is about 4 - 5 ; ( 3 ) it is proved that combinatorial reinforcement measures are effective and feasible

    對藤子溝拱壩的數值計算和模型分析表明: ( 1 )藤子溝電站在正常蓄位作用下,壩體和兩岸壩肩是穩定的; ( 2 )藤子溝拱壩的整體安全度大概為4 5左右; ( 3 )東北院提出的對左岸泥巖層挖除處理並用混凝土的加固除險措施經研究表明該加固措施是有效、可行的。
  3. Surface wave velocity detecting tests and dry density detecting tests by pit replacement method were conducted respectively for the transient material ( a ) and main rock - fill material ( b ) used in the construction of concrete - faced rock - fill dam of shuibuya project

    摘要以布埡面板堆石壩施工中的過渡料( a )和主堆石料( b )為主要檢測對象,分別進行了面波波速和法干密度的對比檢測
  4. In this paper, in order to solve the difficulties in the rain pipe construction in jianyu road of yulin city, the pipe - pushing technique for the hand - type tool pipe in the sand soil layer has been researched by experiments in which many practice problems were considered such as the movement and deformation of sand soil, the difficulties for the pipe to enter the scheduled work soil, the collapse of excavation surface, the departure of pipe center and the difficulties to correct this departure. by both the calculations for the stabilities of back - supporting soil body and excavation surface and the theoretical analysis on the reasons for the departure ' s producing, some construction techniques were introduced and adopted in this paper which include not only the change and reinforcement to both the back - supporting soil body and the scheduled work soil body but also the settings of pipe cap, lattice and correcting system on the head of the tool pipe

    本文針對榆林市建榆路雨管道中遇到的技術難題,進行手掘式工具管砂土層頂管法施工技術研究,在研究中考慮砂土層存在的后靠土體移位、變形,工具管難以進入出洞土體,挖掘面易坍塌、管道中心易偏差及難糾偏等問題,通過對后靠土體和挖掘面的穩定計算及偏差產生原因的理論分析,提出並採用后靠土體填加固,出洞土體填加固,以及在工具管頭部設管帽、格柵、糾偏系統等技術措施
  5. Standard test method for density of soil and rock in place by the water replacement method in a test pit

    用測井中法就地測定土壤和巖石密度的標準方法
  6. The static triaxial test is performed on composite cemented clay samples and parameters of duncan - chang model are obtained considering the effects of replacement ratio and confining pressure. the effects such as replacement ratio, strain amplitude and confining pressure on the dynamic modulus and damping ratio of composite cemented clay samples are analyzed through undrained dynamic triaxial test. fitting equations estimating the dynamic modulus and damping ratio through regression analysis are deducted with the effects of replacement ratio, strain amplitude and confining pressure

    通過不排動三軸詳細地分析了率、應變幅和圍壓等因素對泥土復合樣動模量和阻尼比的影響,根據有關數據,得到了較為完整的復合樣的動力變形曲線,通過回歸分析方法,得到了考慮率,應變幅和圍壓影響的泥攪拌樁復合樣動模量和阻尼比的擬合公式。
  7. Three experimental schemes were taken, including the draining plastic board and pre - compression with stacking load, the draining plastic board and punning, the replacement treat after punning. the deep horizontal movement of soil body, hyperstatic pore water pressure, the ground surface settlements and horizontal movements, dynamic detection and static load experiment were carried out in site

    此次方案研究採用塑料排板+堆載預壓、塑料排板+強夯、強夯等三種方案,對土體深層平位移、超靜孔隙壓力、地表沉降及地表平位移、動力檢測和靜力荷載等進行了現場測
  8. Firstly, developing status of routine test of hydroelectric generation set and trouble diagnosing in china and abroad are introduced ; secondly, the article specifies the structure of cims and basic theory and technology. cims is composed of monitoring apparatus and analyzing system, signal processing uses fft and df ; in the end, function of cims is specified. monitoring apparatus is designed of 80c196kb and 89c52, the monitoring soft adopts microsoft visual basic 6. 0 and the database is developed of microsoft access 2000

    文章首先介紹了電機組常規及故障診斷國內外發展現狀;然後給出了系統的結構框架和理論技術說明,本系統由監測裝和軟體分析系統組成,信號處理採用了快速傅利葉變和數字濾波技術;最後詳細分析了系統功能,監測裝使用80c196kb和89c52單片機技術開發,監測軟體使用visualbasic6 . 0語言編制,數據庫採用microsoftaccess2000 ,監測系統分為三大部分:運行狀態監測模塊、故障分析及數據處理模塊、輪發電機組常規模塊。
  9. With the self - developed finite element program, the soil - structure interactions and the seismic settlement of structures under earthquakes are studied, which led to several conclusions useful to seismic design in engineering practice. the preparation method of composite cemented clay samples is modified based on former researches

    本文在前人的基礎上改進了泥土復合樣的制備方法,並且進行了復合樣的靜力三軸,考慮不同率和圍壓的影響,得到了在靜力有限元分析中所必需的duncan ? chang模型參數。
分享友人