水道分汊 的英文怎麼說

中文拼音 [shuǐdàofēnchà]
水道分汊 英文
channel bifurcation
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : 名詞(分支的小河; 水流) branch of a river or current
  • 水道 : water channel; channel; waterway; watercourse; water carrier; water race; water lane; klong; lago...
  1. Though the water levels cross one section are almost equal, the velocities differ greatly. at the some cross - section, the velocity in the in the quirk may be double as that on the floodplain. the water surface will rise hi the southern branch because of the improper diffluence ratio, if using the designed diffluence col

    淮河入海河口段位值橫向佈相差無幾,而流速的橫向變化較大,泓灘平均流速差最大可達一倍以上,在現有的流口設計條件下,若按設計的南北流比,南流口有壅現象發生,如果南流增大到800m ~ 3 / s左右時,則流較為通暢。
  2. Through checking computations, it was shown that the analogue accuracy of the model was quite high, which can provide important basis for scientific decision - making on engineering measures. through analogue calculation and analysis of many regulation schemes, it was shown that combining the diversion weir works with the bed fixing works at the south branch is reasonable and feasible in the implementation of loushuikouzi river regulation works. in addition, it is suggested that the bed fixing works at the south branch should adopt the improved compound section scheme

    經對多個整治方案的模擬計算與析,表明漏口子河整治採用流魚嘴工程和南固床工程相結合的整治工程措施是合理可行的,通過模型計算研究還提出了南固床工程採用復式斷面形式的改進方案建議,該方案保證了南枯期通航和不斷流,而且對南及撫遠鎮的保護具有正面作用。
  3. In the past, more emphasis has been put on the flow pattern and the division ratio of water and sediment discharge. in order to study the division characteristics, a theoretic model is proposed in this thesis, which combines the plan configuration of channels with the minimum energy dissipation rate theory

    本文將河流動力地貌學中的平面形態和最小能耗率理論相聯系,研究流特性,並推導理論流模式;另一方面,通過建立二維流數學模型,與理論析結果進行比較。
  4. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門、鹽造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文漢對河淤積的影響進行了定量析: (一扣根據實測資料首次建立了河贖流路泥沙沉積配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  5. 8. a simplified 3 - d natural river flow and sediment transport model is developed based on hydrostatic pressure distribution. the model has been applied to investigate the 3 - d flow and suspended - load transport in nanjing river reach with two branches

    ( 8 )天然三維流泥沙簡化數值模型,成功地模擬南京某河段流運動和多沙計算,結果可靠並滿足精度。
  6. Planar 2 - d flow and sediment numerical modeling of branching river

    天然平面二維流泥沙數值模擬研究
  7. A 2 - d hydrodynamic - numerical model was applied to typical rocky rapids called jiyutan by comparing different computational models. based on the comparison of different schemes, the change of the discharge and the flow current in a branch were analyzed, and the relationship between the flow condition and excavation area, scope as well as mode was discussed, the conclusions show : ( 1 ) in a branching rocky rapids, the velocity may be reduced and flow condition can be improved by excavating one channel partly

    本文在對各種數學模型比較的基礎上,應用二維動力數學模型研究典型石質流灘? ?廣西潯江鯽魚灘航整治工程方案,通過各方案計算結果比較,析了不同的開挖及內不同開挖面積、開挖范圍以及開挖方式所引起的流比及工程區域航力條件的變化規律,研究結果表明: ( 1 )對于石質流灘來說,在某一通過局部開挖河槽,擴大過斷面面積,可以達到降低工程段流速、改善局部流條件的目的。
  8. The behaviors of the inflow and sediment, the recent evolution rules and trend of the river channel in this section as well as the changing rules and causes of the change of the hechangzhou brai - ded channel are analyzed and the scheme researches, engineering design, construction and the effects of the control works at the entrance of the left branch of the hechang sandbar are presented in the paper

    根據鎮揚河目前的情況析了該河段來來沙特點、近期河演變規律及演變趨勢,介紹了該河段二期整治工程的基本情況,並著重介紹了和暢洲左口門控制工程方案研究、設計、施工及工程效果等內容。
  9. Excavating riverbeds in one channel may not only reduce the velocity area in some areas but also increase the velocity in other areas by increasing flow rate in this channel without correspondent changes in riverbeds of rocky rapids. in result, the velocity in waterway may be increased instead of be reduced, the flow condition may also be deteriorated. thus, which branch should be excavated and how to excavate in improving the flow condition of the branch should be further explored

    但在內,情況較為復雜,在一內採取開挖措施后,雖然其過斷面有所增加,局部流速相應降低,但是由於工程后,流比將會相應變化,而石質河床一般無法通過沖淤變化以適應流條件的改變,因此,航內工程處的流速可能降低,也可能不降反而有所增加,惡化了航流條件。
  10. ( 3 ) in excavation channel, the velocity in engineering area may be reduced, but the velocity in other areas of this channel may be increased and the flow condition may be deteriorated as a result of the increase of flow rate in this channel. thus, it should be discussed and studied before engineering practice

    ( 3 )在的開挖中,工程區域的局部流速可能有所下降,但因流比有所增加,可能導致其餘部河段的流速有所增加,惡化航行流條件,因此在工程前需要進行充的論證和深入的研究。
  11. Using the 1 - d rivernet model calculates the water discharge ratio of the two branches and also duplicates the back - flow in the north branch during flood tide. the 2 - d model with a fine grid is applied to the field of flow in the changjiang estuary and the results are well in agreement with the measured flow

    同時利用河網模型對長江口河段進行一個月的流模擬,並獲得了長江口南北支流比,復演出北支漲潮時體倒灌轉流現象,解決了河網模型用於潮汐流模擬的問題。
分享友人