水道建設工程 的英文怎麼說

中文拼音 [shuǐdàojiànshègōngchéng]
水道建設工程 英文
waterway project
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 水道 : water channel; channel; waterway; watercourse; water carrier; water race; water lane; klong; lago...
  1. Furthermore, field observations and data records showed the traces of possible large - scale landslides, which would result in drastic damages to the shipping and the water consonancy project on yangtze river areas, and endanger the nearby residents and their properties. therefore, it is important to predict the landslides to minimize the damages

    一旦發生滑坡,我國的黃金?長江將有可能嚴重阻航,甚至斷航,危機附近居民生命財產安全,影響下游利樞紐,因此進行滑坡預報做到提前防災減災及其重要。
  2. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    部《房屋質量保修辦法》對房屋作了最低保修期限的規定:其中1 、地基基礎和主體結構,為計文件規定的該的合理使用年限; 2 、房屋防、有防要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給排備安裝為2年; 5 、裝修為2年。
  3. Jiayu construction providing water main design and construction of the municipal construction, river dredging, hydropower installation / handling, steel fencing, security doors manufacture, sewage wastewater transport, construction materials, interior decoration materials disposal, metal processing components

    上海嘉宇有限公司主要提供計,市政,河疏浚,電安裝/裝卸,鋼質柵欄,防盜門製造,污運輸,材,裝潢材料的批售,金屬構件加
  4. The 500 - tonne units were floated out on a barge, lifted into position and the cable stays connected. this bridge and the viaduct were built by the kumagai - maeda - yokogawa - hitachi joint venture under a hk 1. 643 billion contract. the joint venture comprises kumagai gumi hong kong ltd. and three japanese firms, maeda corporation, yokogawa bridge corporation and hitachi zosen corporation

    門大橋及馬灣高架合約價值港幣16 . 43億元,由熊谷前田橫河日立合營企業造,該集團成員包括熊谷組香港有限公司和叄間日本公司,分別是前田業株式會社橫河橋梁株式會社和日立造船株式會社。
  5. This paper summarize the estuary sediment management methods also, analyze and the following aspects and give evaluations : estuary dredging and lead the flow, lead water to scour the river channel, build the xihekou reservoir, estuary gate deposition management, dike reinforced etc

    本文還對河口泥沙的處理途徑和措施進行了概括總結,對河口疏浚與導流、引海沖刷河西河口利樞紐、攔門沙治理、人有計劃改和出漢、加高堤防和加固防護和挖河固堤等進行了分析評價。
  6. Dtu 65. 8 - building works - execution of floor heating with hot water through synthetic pipes set in concrete - part 1 : technical specifications - part 2 : special clauses

    Dtu 65 - 8.混凝土中埋地板熱供暖用人造管的施.第1部分:技術規范.第2部分:特殊條款
  7. T165 - 1 bulldozer is semi - rigid suspended, power shift, hydraulically controlled and track - type. it is applicable for road construction, water and electricity engineering farmland leveling, port building, mining and other engineering conditions

    1推土機系半剛性懸掛、機械傳動、液壓操縱的履帶推土機。可用於路修築、、農田改造、港口礦山開發及其它項目的土石方作業。
  8. Ty165 - 2 bulldozer is semi - rigid suspended, power shift, hydraulically controlled and track - type. it is applicable for road construction, water and electricity engineering farmland leveling, port building, mining and other engineering conditions

    2推土機系半剛性懸掛、液力傳動、液壓操縱的履帶推土機。可用於路修築、、農田改造、港口礦山開發及其它項目的土石方作業。
  9. Ty165 bulldozer is semi - rigid suspended, power shift, hydraulically controlled and track - type. it is applicable for road construction, water and electricity engineering farmland leveling, port building, mining and other engineering conditions

    Ty165推土機系半剛性懸掛、液力機械傳動、液壓操縱的履帶推土機。可用於路修築、、農田改造、港口礦山開發及其它項目的土石方作業。
  10. Ty120 bulldozer is rigid suspended, power shift, hydraulically controlled and track - type. it is applicable for road construction, water and electricity engineering, farmland leveling, port building, mining and other engineering conditions

    Ty120推土機系剛性懸掛、機械和動力換檔變速傳動、液壓操縱的履帶式推土機,可用於路修築、、農田改造、港口、礦山開發及其它項目的土石方作業。
  11. Chapter two ascertains main technological factor of dong gou lock reconstructing, including forecast the cargo and volume through the lock to reason about representative type of vessel designed for through the lock and its operation organize. chapter three design the renovate engineering through ascertaining the main technological factor scale of the lock, dimension, designed water level and altitude, including design of structure of the lock, lock chamber and lock gate, and select the main technological factor and pattern of headstock gear. chapter four draws a comprehensive compare of the two design scheme of the renovate project with engineering project economy evaluation method, and makes out the recommended scheme, and furthermore, to calculate the economic evaluation index of the recommended scheme and makes the economic sensitivity analysis of the scheme and finally demonstrate economic feasibility of the scheme

    本論文共分四章:第一章主要介紹了原東溝船閘的地理位置和營運現狀,說明了船閘在航資源綜合利用中的作用及東溝船閘改造的必要性;第二章東溝船閘改造的主要技術因素確定其中包括東溝船閘過閘貨種和貨運量發展的預測,並確定東溝船閘的計代表船型及營運組織;第三章東溝船閘改造計本章通過船閘改造主要技術參數:船閘規模、尺度、位和高等的確定,計了二個船閘改造方案,包括鋼筋混凝土整體塢式閘首結構、閘室和閘門的計,並選定了啟閉機的主要技術參數和型式;第四章採用了項目經濟評估方法對東溝船閘改造二個計方案進行全面綜合比較后,確定了推薦方案。
  12. This paper outlines the design and construction conditions of the yangtze estuary deepwater channel regulation project, describes the comparison and selection of the design schemes for the 1st & 2nd phase projects, and expounds the construction organization and administration, the core of which is dynamic management

    摘要全面介紹長江口深治理整治築物和疏浚計條件和施條件,並在此基礎上介紹一、二期計方案的優選情況,以及實施過中以動態管理為主要內容的施組織管理情況。
  13. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底庫運用后沙變化這一主要矛盾,通過分析研究以往典型時期的沙特點和河演變特點,收集分析河床邊界條件變化資料,小浪底庫運用后沙資料變化,結合現有河整治情況,總結前人的研究成果,重點研究三門峽庫運用後下遊河河勢變化的規律和特點,探索小浪底庫運用後下遊河勢變化情況,分析預測游蕩性河鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東壩頭、東壩頭至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河整治的規劃和安排提供決策參考和依據。
  14. Shankou spillway project has many specific characteristics, for example, the gate frusta and weir body have equivalent thickness, the weir body is low and have corridor, the foundation of the weir body is " high - low foot " " and the side frusta is also used as retain wall. in view of the characteristics, to better analyze the stress distribution on weir body, gate frusta, the joints between gate chamber and weir body, under the condition that the gate chamber is applied with asymmetrical loads and complicated constraints, three dimensional finite element method is applied in this paper

    本文針對山口溢洪閘墩與堰體底板厚度相當,堰體為低堰且有廊、堰體基面「高低腳」及邊墩兼作擋土墻等具體特點,在閘室計中采山口利樞紐溢洪閘室三維有限元整體應力計算分析用三維有限元整體應力計算方法分析閘室的受力狀態,分析閘室在荷載不對稱。
  15. The function of the software is useful, it has provided many functions such as the calculate of crop water requirement, pipeline layout ( automatic layout and manual operation ) and its optimization, pipe diameter optimization. investment budgetary estimate and economic beneficial result can be result. and can rapid create plan and do plan comparison, the software provides many kinds of result output such as graph. text, table and so on

    該系統可以實行作物需量計算,系統計流量推算、管力計算、投資概算,經濟效益分析等功能,立了常用的數據庫(管材、管件、泵和電機等)並對其進行管理和維護,可以實現包括管布置、管徑優化、管材選擇等多種參數選擇在內的多種方案比較、優選。系統能提供圖形、文本、表格等多種形式的成果輸出,人機交互界面友好,操作方便。
  16. At present, xiqiao science and technology industry land has completed " three connections and one leveling ", with roads linking up all parts of the land. the main way under planning will be 60 meters wide. nanhai running water factory guarantecs the sufficient supplyof water. 10kv substation provides strong power supply to the enterproses inside the land

    園內路四通八達,規劃的主幹寬60米;南太自來廠保證充足的用; 10kv變電站為園內企業提供強大的電力供應;先進的郵電通訊網路聯繫世界各地; 24小時治安巡邏、電子保安監控系統等完善的保安服務,保證業園正常運作和治安穩定;綠化、路燈、排等配套正不斷完善。
  17. Hydraulic structures, velometers, weirs, and flumes are used to gauge water in many irrigation districts. the fundamental principles and suitable conditions of these water metering methods are introduced in this paper. the main problems in the development of water metering instruments and facilities as well as main causes of difficulty in popularization of the methods in irrigation districts are analysed. it is suggested that selection and construction of water metering facilities should be combined with canal lining in irrigation districts. it is also pointed out that for realization of automation of water metering it is necessary to develop and popularize portable and stationary water metering instruments step by step based on economic development levels in irrigation districts

    介紹利用築物、流速儀、堰、槽進行量的基本原理及各自適用條件.從量儀器、施的性能、價格及灌區經濟發展平等方面,分析目前在灌區量儀器、施的開發研製方面存在的主要問題,以及灌區量難以普及的主要原因.提出應結合灌區渠防滲,合理選擇和施,並根據灌區經濟發展平,分步驟研製和推廣便攜式或固定式量儀器,最終實現灌區量自動化的灌區量實施方案
  18. The most important task object of all in the process of tunnel construction is karst groundwater. without investigating thoroughly basic condition and dealing appropriately with drainage problems, enormous economic loss would be occurred with hazards to tunnel construction

    巖溶地下是隧中最主要的作對象,如果未能搞清楚巖溶地下的基本情況,解決好排問題,將會給施帶來嚴重危害,造成重大的經濟損失。
  19. Facing on karst groundwater in the process of yuanliangshan tunnel construction, we have collected the samples of the regional karst water and the pressure - bearing karst water, and have calculated d value with analyzing 6 d, 6 18o, t value

    針對圓梁山隧中面臨的巖溶地下問題,我們採集了區域巖溶和巖溶承壓的樣品,對樣做了d 、 ~ ( 18 ) o和t值測定,並計算出d值。
  20. Dtu 65 - 10. building works. private contracts. piping used for cold and hot pressure water and piping for evacuation waste water and rain water inside buildings. general rules of execution. part 2 : special clauses

    Dtu 65 - 10 ..專門合同.用於冷和熱壓力築物內排廢和雨的管的鋪.施一般規則.第2部分:特殊條款
分享友人