水道試驗站 的英文怎麼說

中文拼音 [shuǐdàoshìyànzhàn]
水道試驗站 英文
waterway experiment station
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 水道 : water channel; channel; waterway; watercourse; water carrier; water race; water lane; klong; lago...
  • 試驗 : trial; experiment; test
  1. Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed

    文摘:涪江潼南河段防洪整治是一項以防洪為主體的綜合性河岸整治工程,在平面二維數值模擬計算的基礎上再進行河工模型,比較分析各防洪整治方案下潼南河段流條件的變化,及其對上游防洪、河、大橋、電、航運、河勢的影響,提出合理可行的工程方案
  2. In the topic 1, utilizing the natural lysimeters and drainage region in wudaogou station, based on expriment and imitation methods, frist the hydrology effect of drainage has been analyzed, and then the index of water logged farm drainage and suitable ground water level have been provided. on the theory of darcy rule and farm hydrodynamics, the standard and pattern and empirical formula of farm drainage system have been presented as well, and provide scientifically foundation for drainage planning

    在農田排技術研究中,利用五溝實地中蒸滲儀和排區,採用法和動態模擬法,分析了排工程的文效應,提出了農田排漬標準和作物適宜的地下位埋深,採用達西定律和農田動力學原理,提出了農田排系統的規格、布置方式及經公式,為排工程規劃提供依據。
  3. The sediment model tests for the desilting bottom intakes of two hydropower stations are introduced herein, in which a new combined type of " grid desilting gallery + desilting bottom intake " ( grid desilting bottom intake ) is put forward

    文中介紹了2個電口排沙底孔的泥沙模型情況,提出了一種新的「格柵式排沙廊排沙底孔」的組合型式(簡稱格柵式排沙底孔) ,取得了理想的排沙效果,較好地解決了工程實際問題。
  4. Test research of diversion water channel and front tank of number 2 middle - line sewage pump station in shanghai

    上海中線2號污和前池的研究
  5. To improve the flow pattern and discharge capacity of the spillway of bashan hydropower station, the left guide wall ' s form of the spillway ' s entrance channel is optimized by series of model tests

    摘要為改善巴山溢洪渠流態、提高泄流能力,通過一系列優化了溢洪渠左導墻頭部曲線型式。
  6. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化研究;大壩基礎深層抗滑穩定研究;三峽電口型式研究;鋼襯鋼筋混凝土引研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  7. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化研究;大壩基礎深層抗滑穩定研究;三峽電口型式研究;鋼襯鋼筋混凝土引研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  8. The method was applied to measure the hydraulic losses of inlet and outlet conduit of bulb tubular pump system of the pumping station respectively

    採用本文的方法對某泵前置燈泡和後置燈泡貫流泵的進、出分別進行了模型,測了流力損失。
  9. To serve the optimum hydraulic design for a large pumping station, a new method to separate inlet and outlet conduit from tubular pump system was put forward for measuring their hydraulic baa, by the way to design a special measuring system

    摘要為了配合某大型泵貫流泵裝置的優化力設計研究工作,本文提出了設計專用模型裝置,將貫流泵裝置進和出泵裝置模型中分離出來分別進行模型力損失測的方法。
  10. Numerical simulation of turbulent flow inside inlet duct and experiment on characteristic performances in shaft tubular model pump set

    豎井進數值模擬與裝置特性
分享友人