水電局 的英文怎麼說
中文拼音 [shuǐdiànjú]
水電局
英文
dewa-
The fly ash foamed concrete product line which is suitable for industrialization was designed in this paper and the technics flow was showed, the project of zhida concrete plant belonging to china water and electricity 14th bureau was introduced as an example, the summary is that the industrialization of fly ash foamed concrete can not only be realized, but also creates good economy and society benefits for the enterprises
本文還設計了適合工業化規模生產的粉煤灰發泡混凝土生產線,給出了產品的工藝流程,以中國水電十四局志達混凝土廠為例介紹了工程的實際情況,結果表明西安理工大學碩士學位論文粉煤灰發泡混凝土不僅可成功實現工業化生產,而且可為企業創造良好的經濟效益和社會效益。The police prepare to destruct 327 electronic gambling machines sequestrated in zhengzhou, capital of central china ' s henan province, nov. 28, 2006
11月28日,鄭州市公安局金水分局集中銷毀收繳的327臺電子賭博機。在近期的打擊賭博專項行動中,金水分局共查繳各種電子賭博機800餘臺。Di - on electrics service and products cover the power electric field including power generation transmission distribution, power equipment manufacturing, subway, utilites, ac dc metrology field as well, more than 500 units of electric power utilities and stations such as beijing power supply bureau, guangzhou power supply bureau, baosteel, three gorges power station and more manufacturers like siemens, abb, alstom, bicc, pirelii, toshiba and more and 30 units of metrology institutes in china like nim, tsinghua university and more are our user. di - on electric is sole and exclusive distributor for numerous famous companies like transinor doble norway, measurements international canada, ndb canada, schuetz germany, aan germany, dr. strauss germany and etc, taking care of their business and service in p. r. china including hongkong
絕大多數員工擁有本科和研究生以上學歷,在電力系統和計量系統工作多年,從事電力檢測帶電監測和計量測試儀器的技術服務和市場銷售工作長達10年以上,為約500多家電力工業系統的發供電部門如北京供電局,廣州電力局,深圳供電局,三峽電廠,廣州抽水蓄能電廠,田灣核電站等等,科研調試部門如廣東省電力試驗研究所,湖北省電力試驗研究所等等與設備生產廠如siemens , abb , alstom , toshiba等等提供了國際最先進可靠的測試技術和儀器設備為約30多家國內二級以上相關計量科研院所,包括國家計量院,清華大學,中國運載火箭研究院,空間技術研究院,航天二院,成飛,西飛和各省市計量院,電力試驗研究院所等提供了大量最先進可靠的計量檢測儀器。Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope
本文在闡明錦屏一級水電站壩區巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對拱肩槽高邊坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體穩定性進行了系統分析、計算與評價;應用塊體理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定塊體的規模、出露范圍,從而對拱肩槽高邊坡的局部穩定性有了系統全面的認識和了解。With the combination of the present situation in shangrao power supply bureau, this thesis elaborates the analysis of the reform of rural electric power enterprise and the reconstruction of rural electric networks ; analysis of the investment conditions of the reform in the view of technical economics ; discussion of the effect of small hydropower on the economic activities of the whole marketing ; evaluation of the work of " two reforming and the same electric price in urban an rural districts " in the view of economics ; analysis of the profit and loss in marketing and economic activities with the cost - volume - profit analytic in managerial economics ; discussion of the measures in improving marketing activities from the aspects of developing the electric market in rural 、 pricing strategy 、 marketing channel management 、 sales strategies 、 quality service and the enforcement of transmission loss management, etc
本文結合上饒供電局的實際情況,分析了農電體制改革以及農網改造的情況;從技術經濟學的角度對兩網改造的投資情況進行了分析;並就小水電對全局營銷經濟活動的影響進行了探討;結合當前的實際情況,從經濟學的角度評價了「兩改一同價」的工作;用管理經濟學中的量本利分析法分析了全局的營銷盈虧情況;針對營銷成果的分析,從開拓農電市場、定價策略、營銷渠道管理、促銷策略、優質服務以及加強線損管理等方面探討改進營銷經濟活動的措施。In light of the limitation of fast fourier transform ( fft ) for the method of traditional spectrum analysis to analyze the unsteady signal, wavelet and wavelet analysis are made for the typical unsteady process signal of starting up and shut down with the good characteristic of simultaneous localization in both the time and the frequency domains based on the field test on the vibration of two - row placed units in lijiaxia hydropower station, in which the signal is decomposed into different frequency band, and then the weak signal is caught and the dominant frequency is picked up for the analysis of the vibration source
摘要基於李家峽水電站雙排機組振動的現場試驗研究,並且針對傳統頻譜分析方法傅立葉變換( fft )對于非平穩信號已力不從心這一缺陷,利用小波分析方法在時域和頻域上同時具有良好的局部化性質,通過對開停機這一典型非平穩過程信號進行小波及小波包分析,將其分解到不同頻帶內,獲取微弱信息和提取優勢頻率,並對其作振源分析,得出開停機初始時刻因水流不穩均出現強烈的振動現象,且低頻段信號能量最大,開停機過程水流脈動壓力和尾水渦帶擺動是引起定子基礎振動的主要原因。This proof following enterprise already through the authentication, and has set up a file in the dongguan 114 nets industry and commerce enterprise database, inquires the more detailed enterprise material, please dial the dongguan enterprise information desk 96060 ( artificially ) 9686810114 billion ( to be automatic ), this enterprise numbers for 50045
茲證明廣東連平水電局駐東莞工程隊已通過認證,並已在東莞114網工商企業數據庫中備案,查詢更詳細的企業資料,請撥東莞企業查詢臺96060 (人工) 9686810114 (自動) ,該企業編號為50045 。This light exhibition was powered from sludge gas generated by the morigasaki water reclamation center of the bureau of sewerage and cost roughly 3, 000 yen per night
這個燈彩展示的電力供應由下水道局森崎水再生中心以污染物為原料生成,每晚耗費大約3000日元。Based on many references form civil and abroad, the author mainly studies the measurment theory and method for flux, raising height, axial power and rotational velocity. avoiding many complicated and intermediate courses for power wastage analysis, introduces the electric measurement and using efficiency curve of motor in measureing axial power, and satisfies the automatization of the device. the paper also provides a new method, inductive winding, in measuring rotational velocity of electromotor, supplys limitations of other method in measuring rotational velocity of electromotor in water, and meet practical needs in developing diving electric pump for corporation
作者在參閱大量國內外有關文獻,著重探討了水泵流量、揚程、軸功率、轉速的測試原理和測試方法,提出了採用電測法並結合電機效率特性曲線測量水泵軸功率,從而避免了損耗分析法中大量復雜的中間過程,滿足了試驗裝置的自動化測量要求;採用漏磁感應線圈法測量電機轉速,彌補了其它轉速測量方法對水下電機測試的局限性,適應了萊恩公司開發潛水電泵的實際需要。This system use the floater style sensor, mechanical encoder to get water - level signal, and use the at89c51 single chip system to transform the signal into water - level data, use modem through pstn to transmit data for a long - distance, and designed a information management software system hi the irrigation works bureau information center for communication and data management. the structure of the system was discussed in the thesis
該系統使用浮子式傳感器、機械式編碼器獲取水位信號,利用at89c51單片機系統採集水位數據(簡稱:下位機系統) ,採用數據機、通過公共電話網( pstn )遠程傳輸數據,並在泰興市水務局信息中心通過主控計算機(簡稱:上位機)進行通信及信息系統管理。A 50 - mile stretch of the river carrying the benzene reached harbin this morning, shi zhongxin, director of the city ' s water bureau, said on state television, according to the associated press
今天早晨50英里長的一段遭受苯污染的河流到達哈爾濱,根據合眾社的報道,石忠信(音譯) ,哈爾濱水利局的主任,在電視上說。And meanwhile the group has become the new pattern that all the second and third industries develop together, such as machinery, section steel, building material, textile, port machinery, shipbuilding, ship repairing, electronics as well as real estate development, service industries as hotel with three star class, building decoration, water and electricity installations, etc. it is a private share - issuing corporation with self - research ability for products and has the right to import and export by itself
導軌型鋼鋁型材彩色塗層板耐指紋板紡織港機造船電子,以及房地產開發三星級涉外酒店建築裝潢水電安裝等二三產業並舉的發展格局,是具有一定自主產品研發能力的民營股份制企業集團目前已建成張家港市長江潤發機械工業園宿遷市長江潤發宿豫工業園,公司先後獲得國家質量管理先進單位全國守合同重信用企業等光榮稱號。Not only does it mean a lack of entertainment value, the absence of professional actors also keeps the general audience away. that may explain why indie is never a popular form of cinema in hong kong. however, filmmaker writer julian lee tried to prove that we are wrong by making an independent film that is entertaining and also features glamorous stars, and that is
要在香港拍攝規模較大的獨立電影一向不易,編導李志超膽色過人,自資加上藝術發展局的資助拍攝獨立長片妖夜迴廊,以行動證明香港影壇並非完全一池死水,電影界亦不乏有心有理想的電影人,單是這份誠意已經值得觀眾支持。The thesis consists of two parts : a case and the case study. in the case, the general situation of water conservancy and hydroelectric engineering industry of guangdong province is introduced from three aspects of investment, engineering, and engineering enterprises. a series of tactic actions according to the market competition, which were carried out by the third water conservancy and hydroelectric engineering bureau guangdong province ( twcheb ) in the last four years, are reviewed
在案例部分,首先從水利水電投資、水利水電施工和施工企業三方面介紹了廣東省水利水電行業的概況;再以局長林慶國為人物線索,詳細回顧了省水電三局在過去四年中針對市場競爭採取的一系列策略措施,卻無法扭轉頹勢,反而被昔日實力不分伯仲的省水電二局遠遠拋離在後面;最後提出了省水電三局所面臨的市場困境。Die casting factories need to consider problems in vario us aspects, including not only melting, die casting, cleaning, aging treatment, shot bla st, die, inspection, but also general layout of factories involving logistics, w ater, electricity, fuel, raw materials, purchase, stock and transporation
壓鑄生產廠需要考慮的問題是多方面的,不僅有熔化、壓鑄、清理、時效、拋丸、模具、鑄件檢驗等工序,還有工廠的總體布局,牽扯到物流、水、電、燃料及原料的采購、倉儲和運輸等因素。According to practical technique, better economic index, nearing the main electrical net shelves and focusing on electrical load, we determine overall arrangement of waterpower resource exploitation, select item of waterpower resource exploitation in the near and medium term, raise a blueprint about heilongjiang water - electricity power exploitation and establishment in the near and medium term in order to take reference for relative department
按照技術上可行、經濟指標較好、靠近電網主網架和用電負荷中心區域的原則,確定水能資源開發總體布局,選擇出近中期水能資源開發與利用項目,對近中期我省水電工程開發與建設提出一個構想,供有關部門決策參考。Water and electricity building of kaixian irrigation works agriculture machinery bureau
開縣水利農機局水電大樓The hydropower planning is the first link of the antecedent work of hydropower development and is an important work relating to the strategic goals and arrangement of hydropower
水電規劃是水電建設前期工作的首要環節,是關系水電戰略目標和戰略布局的一項重要工作。After the investigation and study of this extruded concrete curb solution overseas, shaanxi provincial bureau of water & electric engineering ( group ) co., ltd. ( spb ) devoted to the research of this new construction method, invented bjy - 40 extrusion curb placing machine, made comprehensive experiments on heihe dam site, and got valuable results, adopted this method in gongboxia hpp main dam construction
在對國外邊墻施工法進行細致調研后,從2001年開始,陜工局率先對這一技術進行研究,研製了bjy - 40型邊墻擠壓機,在黑河工地進行了現場擠壓混凝土邊墻和墊層料鋪填碾壓的綜合試驗,取得了具有參考價值的第一手資料,並在公伯峽水電站面板壩工程中創新採用了這一技術。The paper concludes construction management achievements made by guangxi hydroelectric construction bureau on letan project and accordingly displays the new image of the enterprise in new era
摘要簡要總結了廣西水電工程局在樂灘工程的施工管理成就,展現了企業新時期的新形象。分享友人