水電站設計 的英文怎麼說

中文拼音 [shuǐdiànzhànshè]
水電站設計 英文
design of hydroelectric power station
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 水電站 : [簡] (水力發電站) hydroelectric (power) station; hydropower station水電站自動化 automation of...
  • 水電 : hydroelectricity; hydropower; water and electricity
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  1. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級(一期)深埋長隧洞的和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。
  2. Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers

    由於三峽工程輪機技術上的復雜性和挑戰性,在左岸14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:輪機頭的確定,負傾角葉片輪機的應用,兩套,舍棄初期轉輪,蝸殼進行壓試驗等。
  3. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花在1995年及1996年導流渡汛工程措施工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建提供一定的參考。
  4. Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally

    本文分析了國內外自動控制裝置的研究和發展狀況,尤其是國內小型的自動化現狀,針對現有力部門的需求,並實現了一種單元式的微機自動監控裝置,該裝置不僅實現了對內各種模擬參數和數字信號的實時監測功能,還對輪發機組進行了調控,通過與上位機處理程序的配合,可以實現的自動發控制、機組順序啟停;在測量發機組機端壓和流參數的時候,採用32點離散傅立葉演算法( dft ) ,增加了測量的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「分散控制、集中管理」 。
  5. At the end of the dissertation, example calculation is given under multi - loading cases using the agc software of hydropower station based on dcpm - fga

    最後,運用所廠內agc控制軟體對某進行了多個功率點多工況條件下的實例算。
  6. The spatial condition and both the technical and economic feasibilities for the layout of the light - court for the auxiliary powerhouse under the condition of higher fluctuation of the flood level downstream is basically analyzed ; in which the principles of the layout and both the spatial dimension and configuration are discussed, and then a actual design case is given with the preliminary evaluation on the ventilating and lighting effect of the light - court

    初步分析了下游洪位變幅較大等環境條件下,貫流式副廠房置自然通風採光天井的空間條件及其技術性和經濟性,討論了天井布置原則和空間尺度與形態處理,給出實例並初步評價了天井通風採光的效果。
  7. Design standards of hydropower headrace and forebay

    渠道及前池規范
  8. Design specifications for hydropower headrace and forebay

    渠道及前池規范
  9. Design flood analysis of goupitan hydropower station

    構皮灘水電站設計分析
  10. Ganfa is amanufactory produces tubular turbine early in china. in the 80 s it developed successfully gz003 - wz - 100, 320kw s - type unit for the luoji power plant, located in hainan for the first time. in the 90 s it designed and made the first domestic bulb type unit : gzm - wp - 80, for the liaoning tieling power plant. afterwards it designed and made gd008 - wz - 225, 630kw and gd006 - wz - 290, 3. 5mw s - type unit respectively for the fujian shanghang jiaolong power plant and the guangdong fengkai power plant. and it designed and made gz1250a - wp - 460, 6mw bulb type unit for fujian shanghang jiaolong power plant

    我公司是國內較早生產貫流式機組的廠家, 80年代首次為海南洛基研製成功gz003 - wz - 100型320kw軸伸貫流式機組90年代為遼寧鐵嶺製造了國內首臺gdm - wlp - 80型燈泡整裝式機組隨後分別為福建上杭製造了gz1250a - wp - 460型6mw燈泡貫流式機組。
  11. Code for design of small - sized hydropower stations

    小型力發規范
  12. Design code for small hydropower station

    小型力發規范
  13. Research of checking design flood of gutianxi hydropower station cascade

    古田溪一級水電站設計復核的研究
  14. Study on influence on design flood of yantan hydropower station after building up longtan hydropower station

    龍灘建成后對巖灘的影響研究
  15. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    溫控問題成為青居水電站設計和施工的關鍵技術問題。 、本文對工大體積混凝土溫控問題進行了分析和總結,結合青居閘壩工程,開展溫度應力及溫度控制研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究施工過程中溫控措施的簡化,以加大澆築尺寸,簡化施工程序,加快施工進度,節約工程費用。
  16. The result is useful for the design of the pressure diversion system, and other similar engineerings

    試驗成果對該壓力引系統有指導意義,對類似水電站設計有參考價值。
  17. Study on plotting problem of medium and small hydroelectric plant at design stage

    略論中小型水電站設計階段的測繪問題
  18. The achievement in research is adopted by the designs and constructions for the qingju water power station

    研究成果為青居水電站設計施工所採用。由於經濟效益顯著,受到業主單位的嘉獎。
  19. The axial flow type turbines manufactured by the ganfa, are raging from 3 to 45m in water head, 100kw to 30mw in capacity and 0. 8 to 6m in runner diameter. in recent years, ganfa gained fast growth in this type of turbines. since manufacturing type zz560 - lh - 250 3. 2mw units for the nanhe power station in jiangxi, ithas also manufactured type zdjp502 - lh - 275 5. 5mw units for the niubilong power station in chongyi, jiangxi, and zd680 - lh - 420 4. 5mw units for the shamaoshi power station in shanghang, fujian

    我公司軸流式輪機適應頭345m ,轉輪直徑0 . 86m ,容量10030000kw ,自80年代為江西南河廠生產zz560 - lh - 250型3 . 2mw機組以來,軸流式機組有較快的發展,近年來又先後為江西牛鼻壟製造了zdjp502 - lh - 275型5 . 5mw機組,為福建上杭製造了zd680 - lh - 420型4 . 5mw軸流式機組。
  20. The selection of impoundment level and dam site, the general layout, the design optimization of structures, construction diversion and construction period all are the important context of the design of hydropower station across river with low head

    位選擇、壩址選擇、樞紐布置、建築物優化、施工導流與工期等是低頭河床式的重要內容。
分享友人