永久水文站 的英文怎麼說

中文拼音 [yǒngjiǔshuǐwénzhàn]
永久水文站 英文
permanent station
  • : Ⅰ副詞(永遠; 久遠) perpetually; forever; always Ⅱ名詞(姓氏) a surname
  • : Ⅰ形容詞(時間長) for a long time; long Ⅱ名詞(時間的長短) of a specified duration
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (字) character; script; writing 2 (文字) language 3 (文章) literary composition; wri...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 永久 : permanent; perpetual; everlasting; forever; for good (and all)
  • 水文 : hydrology水文測驗 hydrologic survey; 水文成因分析 hydrologicall genetic analysis; 水文地理學 hydr...
  1. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;船閘的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  2. Firstly in the paper the research of hydraulic characters and the optimize of structure have being carried out on the four bigger design schemes of permanent internal dissipation discharge tunnel reconstructed from the right bank ' s diversion tunnel of gongboxia power station with a method of theoretical analysis combined with test comparisons. on this basis, two form swirling flow internal dissipation schemes, vertical and horizontal axis are recommended to the construction unit of the station as the schemes to be selected next

    採取理論分析與試驗比較相結合的方法,首先對黃河公伯峽右岸導流洞改建為式內消能泄洪洞的四個較大設計方案進行了力特性的試驗研究與體型優化,在此基礎上,向建設單位分別提供了豎井旋流內消能的推薦方案與平旋流內消能的推薦方案。
分享友人