永久船閘 的英文怎麼說

中文拼音 [yǒngjiǔchuánzhá]
永久船閘 英文
permanent navigation lock
  • : Ⅰ副詞(永遠; 久遠) perpetually; forever; always Ⅱ名詞(姓氏) a surname
  • : Ⅰ形容詞(時間長) for a long time; long Ⅱ名詞(時間的長短) of a specified duration
  • : 名詞1. (水上的運輸工具, 船舶的通稱) boat; ship; vessels 2. (姓氏) a surname
  • : anchor gate
  • 永久 : permanent; perpetual; everlasting; forever; for good (and all)
  1. Installation process of the miter gate of permanent navigation in the three gorges project continuation

    三峽永久船閘人字門安裝工藝措施簡述續二
  2. Analysis on monitoring results of locked anchor - bar stress at tgp permanent lock s vertical slope

    三峽永久船閘直立坡鎖口錨桿應力監測分析
  3. The article introduces the waterproofing and drainage measures and materials for the dam, the foundation of the permanent lock and some buildings of the three gorges project

    介紹了三峽工程中大壩、永久船閘基礎及一些建築物的防排水措施和所用材料。
  4. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  5. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  6. Field observations and measurements and relevant statistics show that the ne - nee and nnw constitute the first and second dominant trends of the discontinuities of the rock mass in the area of the permanent shiplock in the threee - gorge project. of all the discontinuities, the steep dip takes the absolute lion ' s share

    1 、通過現場觀測及統計分析表明,三峽永久船閘區巖體結構面第一優勢走向為ne - nee ,第二優勢走向為nnw ,所有結構面中,陡傾角占絕對優勢。
  7. Numerical simulation on crack propagation and reinforcement effectiveness of isolated rockmass between shiplocks of three gorges project

    三峽工程永久船閘中隔墩裂縫擴展及加固效果數值分析
  8. On the process of simulation the deformation after excavation at the middle frusta and the vertical slope at three gorges permanent shiplock, program the fortran procedure to perfect model creation and the capability of the pre - procedure and post - procedure in flac - 3d

    在模擬三峽永久船閘中隔墩和直立邊墻開挖卸荷變形過程中,編制fortran程序,完善flac - 3d建模功能和增強其前後處理能力。
  9. The surrounding rock mass of the tgp shiplocks is jointed rock mass cut by well - developed discontinuous joints. the middle frusta and vertical border wall are the important components of the lock room construction. its deformability and stability will directly affect the construction function and using security

    永久船閘區巖體屬於一種斷續節理切割的裂隙巖體,中隔墩和直立邊墻是室結構的重要組成部分,其變形大小和穩定程度將直接影響三峽航道的結構功能和運行安全。
  10. Controlled blasting excavation technique of permanent lock of three gorges project

    三峽永久船閘開挖控制爆破技術
  11. Reinforcement effects and construction key techniques of two - ended anchors of tgp shiplock

    三峽永久船閘對穿錨索施工關鍵技術及加固效果
  12. Multiple - index assessment for global stability of high - steep rock slope of the three gorges project permanent shiplock

    三峽永久船閘高陡邊坡整體穩定性的多因素綜合評價
  13. Its permanent shiplocks was established and put into use in june, 2003 and its ship - lifting elevator would be accomplished in 2009

    永久船閘已在2003年6月建成投入運行,升機預計在2009年建成。
  14. Hydralics monitored findings in the water - pumping debugging period for tgp lock are presented and compared with model test data

    摘要介紹了三峽永久船閘抽水調試階段水力學監測的部分成果,並與模型值進行了比較。
  15. In this paper, studies are profoundly made on the actual detecting problems happened in the topic of " acoustic emission monitoring of the slope stability of the permanent ship lock for the three gorges "

    本文在「長江三峽永久船閘邊坡穩定性聲發射監測」課題基礎上及實際檢測中面臨的問題進行較深入而有針對性的研究。
  16. When building permanent dams and sluice gate structure on navigable or bamboo and log rafting streams, the construction unit must simultaneously build facilities for ship or log passage or, after being approved by departments authorized by the state council, take other remedial measures and also make adequate arrangements for navigation and bamboo and log rafting during the construction period and the initial filling period, and bear the expenses thereby incurred

    在通航或者竹木流放的河流上修建性攔河壩,建設單位必須同時修建過、過木設施,或者經國務院授權的部門批準採取其他補救措施,並妥善安排施工和蓄水期間的航運和竹木流放,所需費用由建設單位負擔。
  17. In this thesis, the unloading region of a typical cross section of shiplock slope of tcp is given, that is 15570 according toin - situ test and geological survey. considering the effects of excavation unloading, numerical analysis for shiplock slope is made by fem and flag. using the theory and software described in this thesis, the excavation analog and the stability analysis of the typical cross section of the three gorges shiplock high slope has been carried out

    本文選取三峽工程永久船閘邊坡的典型剖面15570剖面,根據現場試驗和地質調查確定的卸荷范圍,考慮卸荷帶巖體力學參數隨開挖過程而變化,採用二維彈塑性有限元法、二維彈塑性顯式有限差分法進行了邊坡施工開挖數值模擬。
  18. The three gorges project is a world - famous water conservancy center project. the main parts of it are the body of concrete dam, permanent ship casket, electricity - produce department, etc. these are all large volume concrete which influence the ageing resistance of the project directly, and they also have much to do with ( he concrete of moderate heal portland cement armature and concrete aggregate, etc

    長江三峽工程,是舉世矚目的特大型水利樞紐工程,工程的主體:混凝土大壩壩體、永久船閘,發電廠房等均為大體積混凝土,這些混凝土工程的耐性既與施工質量有直接關系,也與組成壩體的小熱硅酸鹽水泥、骨料、鋼筋等原料有密切的關系。
  19. The high rock slope of permanent shiplock is important part of the three gorges project. this article analysed comprehensively the engineering geology condition, deformation and stability of the high rock slope

    以三峽永久船閘高邊坡工程為研究背景,結合前期勘測和一、二期開挖施工實際,綜合分析了永久船閘工程地質條件、邊坡變形及穩定性等。
分享友人